Listed by the USPTO as ABOAGYE, MICHAEL
Tech Center 3700 • Art Units: 1700 1733 1738 1793 3725
This examiner grants 75% of resolved cases
ABOAGYE, MICHAEL works in Tech Center 3700 and Art Unit 1700, with 1082 resolved cases. The allowance rate is 75.4%, and the median time to allowance is 1073 days. The 37.7% interview lift indicates a strong positive association between interviews and allowance outcomes in the recorded cases.
JFE Steel Corporation, thyssenkrupp AG, and ArcelorMittal are the leading companies represented. OLIFF PLC, Ballard Spahr LLP, and CANTOR COLBURN LLP are the leading firms shown. The large case record gives practitioners substantial historical context, while the combination of moderate allowance performance and strong interview lift supports preparing interviews around concrete paths to claim resolution.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18703715 | FURNACE STATE ESTIMATION DEVICE, FURNACE STATE ESTIMATION METHOD, AND MOLTEN STEEL PRODUCTION METHOD | Non-Final OA | JFE STEEL CORPORATION |
| 18689954 | QUENCHING APPARATUS, CONTINUOUS ANNEALING FACILITY, QUENCHING METHOD, METHOD FOR MANUFACTURING STEEL SHEET, AND METHOD FOR MANUFACTURING COATED STEEL SHEET | Non-Final OA | JFE STEEL CORPORATION |
| 18689962 | QUENCHING APPARATUS, CONTINUOUS ANNEALING FACILITY, QUENCHING METHOD, METHOD FOR MANUFACTURING STEEL SHEET, AND METHOD FOR MANUFACTURING COATED STEEL SHEET | Non-Final OA | JFE STEEL CORPORATION |
| 18290988 | METHOD FOR OPERATING A STEELWORKS | Non-Final OA | ThyssenKrupp Steel Europe AG |
| 18025987 | Device to inject a reducing gas into a shaft furnace | Non-Final OA | ArcelorMittal |
| 18839760 | IMMERSION NOZZLE | Non-Final OA | NIPPON STEEL CORPORATION |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy75.4% of resolved applications examined by Michael Aboagye were allowed (1,082 resolved cases), compared with 40.4% across Art Unit 1700 over the last five years.
This examiner's interview lift is +37.7 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Michael Aboagye took 1,073 days on average from filing to allowance.
Michael Aboagye examines applications in Art Unit 1700 in Tech Center 3700 (Medical Devices & Mechanical Engineering).