Tech Center 3600 • Art Units: 3633 3635 3642
This examiner grants 55% of resolved cases
Theodore V Adamos operates in Tech Center 3600 and Art Unit 3633. The examiner has resolved 910 cases with an allowance rate of 55.3 percent. The median time to reach an allowance is 1006 days. The interview lift is 44.7 percent, indicating a correlation between interviews and an increased probability of allowance over the 55.3 percent baseline. These 910 cases establish a clear pattern for prosecution.
The 44.7 percent interview lift is a critical data point for practitioners in Art Unit 3633. It suggests that direct engagement can impact the 55.3 percent allowance rate. Applicants should also account for the 1006-day median pendency when managing their portfolios in Tech Center 3600. The 910 resolved cases provide a robust data set for predicting examiner behavior. Utilizing the 44.7 percent lift may be an effective way to navigate the 1006-day median timeline.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 19227966 | STRIP OF FASTENERS | Non-Final OA | Illinois Tool Works Inc. |
| 19388862 | EXPANSION JOINT SPLICING DEVICE AND METHOD | Final Rejection | 3JR, LLC |
| 18658123 | SPLICING DEVICE | Final Rejection | 3JR, LLC |
| 18339911 | ACOUSTIC BAFFLE SUSPENSION SYSTEM | Non-Final OA | ROCKWOOL A/S |
| 18676824 | FENESTRATION UNIT SEALING SYSTEMS WITH WATER FUNNELING DUST PLUGS AND METHODS | Final Rejection | ANDERSEN CORPORATION |
| 18955734 | VARIABLE BUILDING PLANE STRUCTURE TO WHICH PC STRUCTURE AND DOUBLE FLOOR ARE APPLIED | Non-Final OA | Samoo Architects & Engineers |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy