Tech Center 3600 • Art Units: 3652 3654
This examiner grants 71% of resolved cases
Nathaniel L Adams has resolved 524 cases in Art Unit 3652 of Tech Center 3600. The examiner maintains an allowance rate of 71.6 percent. The median time to reach an allowance is 1106 days. The interview lift is 20.4 percent, which is the increase in allowance probability when an interview is conducted compared to the 71.6 percent baseline. These 524 cases offer a solid statistical basis for applicants.
Practitioners should factor the 1106-day median pendency into their prosecution planning in Art Unit 3652. The 71.6 percent allowance rate is a key metric for evaluating the likelihood of a grant. With an interview lift of 20.4 percent, the data indicates that interviews are a productive strategy for resolving issues. Tech Center 3600 applicants can use these figures to set realistic expectations for their clients. The 1106-day and 71.6 percent metrics are derived from a consistent history of 524 resolved cases.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18167290 | MOTOR SYSTEM CABLE WINCH FOR VEHICLE | Non-Final OA | TOYOTA MOTOR ENGINEERING & MANUFACTURING NORTH AMERICA, INC. |
| 18159153 | STRAP HOIST ASSEMBLY | Non-Final OA | MILWAUKEE ELECTRIC TOOL CORPORATION |
| 18291040 | END EFFECTOR AND DETACHING/AFFIXING DEVICE | Non-Final OA | FUJI CORPORATION |
| 18111636 | WINCH AND FAIRLEAD ASSEMBLY FOR A VEHICLE | Non-Final OA | Polaris Industries Inc. |
| 18950077 | TRANSFERRING APPARATUS | Non-Final OA | SEMES CO., LTD. |
| 18601227 | MOUNTING SYSTEM FOR ATTACHING A SUPPORT TO A CRANE AND RELATED METHODS | Final Rejection | LINK-BELT CRANES, L.P., LLLP |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy