Prosecution Insights
Last updated: October 02, 2026

Examiner: ANDRISH, SEAN D

Tech Center 3600 • Art Units: 3672 3678

This examiner grants 72% of resolved cases

Analysis

Sean D. Andrish, in Art Unit 3672 within Tech Center 3600, has resolved 1140 cases. The allowance rate is 71.5%, and the median days to allowance is 849. This indicates a favorable and relatively efficient prosecution path for applicants. The 849-day median pendency is notably faster than many other units, suggesting a streamlined process.

The interview lift is 32.1%, which is very high and indicates that interviews are an exceptionally effective tool. This lift can significantly boost the 71.5% base allowance rate, making personal engagement a key strategy for practitioners. With 1140 resolved cases, the data provides a very robust baseline for these statistics. Practitioners should strongly consider interviews to resolve rejections and potentially move the 849-day process toward a grant even more quickly. The 71.5% allowance rate is a strong indicator of success.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Performance Statistics

71.5%
Allow Rate
+19.5% vs TC avg
1,179
Total Applications
+32.1%
Interview Lift
849
Avg Prosecution Days
Based on 1140 resolved cases, 2023–2026

Rejection Statute Breakdown

1.0%
§101 Eligibility
17.7%
§102 Novelty
42.5%
§103 Obviousness
34.2%
§112 Clarity

Currently Pending Office Actions

App #TitleStatusAssignee
18013028 GROUT APPLICATOR AND METHOD FOR GROUT APPLICATION Final Rejection Illinois Tool Works Inc.
19490067 STEEP PIT WALL MINING Non-Final OA NEWCREST MINING LIMITED
18659557 Upgrading Offshore Wellhead Platforms Final Rejection Saudi Arabian Oil Company
19387621 GRADED UNDERGROUND PUMPED-STORAGE HYDROPOWER IN COAL MINE, CONSTRUCTION AND USING METHODS Non-Final OA Taiyuan University of Technology
19137668 TRAVEL DEVICE, TUNNEL BORING MACHINE, TRAILING CAR, TRANSPORT VEHICLE, TUNNEL BORING SYSTEM, AND MOVEMENT METHOD Non-Final OA KOMATSU LTD.
18835159 MANGROVE INSPIRED STRUCTURES FOR EROSION MITIGATION Non-Final OA PURDUE RESEARCH FOUNDATION
18866366 METHOD FOR BUILDING A TRAFFIC TUNNEL, A CONDUIT SHAFT, OR A PRESSURISED WATER SHAFT BY WAY OF THE TUBBING CONSTRUCTION METHOD Non-Final OA SIKA TECHNOLOGY AG
18613940 SOIL DISPLACEMENT PILE ASSEMBLY AND METHOD OF FORMING FOUNDATION PILE Final Rejection Hubbell Incorporated

Facing This Examiner?

IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.

Build Your Strategy

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month