Prosecution Insights
Last updated: April 19, 2026

Examiner: ARMSTRONG, KYLE

Tech Center 3600 • Art Units: 3619 3672 3678

This examiner grants 72% of resolved cases

Performance Statistics

72.0%
Allow Rate
+20.0% vs TC avg
710
Total Applications
+30.9%
Interview Lift
758
Avg Prosecution Days
Based on 689 resolved cases, 2023–2026

Rejection Statute Breakdown

0.2%
§101 Eligibility
22.2%
§102 Novelty
45.0%
§103 Obviousness
28.8%
§112 Clarity

Currently Pending Office Actions

App #TitleStatusAssignee
18663218 BATTERY POWERED POLE TAMPER Non-Final OA MILWAUKEE ELECTRIC TOOL CORPORATION
18717277 SYSTEMS AND METHODS FOR CATALYTIC CRACKING OF NAPHTHA WITH CO-FEED OF MIXED WASTE PLASTIC OIL TO PRODUCE LIGHT OLEFINS Non-Final OA SABIC Global Technologies B.V.
18950680 Cable handling bow for an overboarding system of a work platform Non-Final OA NEXANS
18860168 A METHOD OF LAYING A SUBSEA PIPE Non-Final OA TECHNIPFMC SUBSEA FRANCE
18708344 CONVERSION OF PLASTIC WASTE TO HYDROCARBONS USING A TRANSITION METAL OXIDE Non-Final OA Borealis AG
18905575 DEVICES AND TECHNIQUES FOR LOW POWER WIRELESS NETWORKING FOR LANDFILL GAS EXTRACTION SYSTEMS Non-Final OA Loci Controls, Inc.
18882030 RIPARIAN ZONE OF RESERVOIR Non-Final OA POWERCHINA HUADONG ENGINEERING CORPORATION LIMITED
18629469 FRAME RAIL ASSEMBLIES AND INTERLOCKING FRAME RAIL SYSTEMS Final Rejection Dockstar Marine Systems Inc.
18433678 Systems and Methods for Using Discarded Asphalt Shingles (DAS) for Fill Replacement and for Structural Members in Building and Surface Constructions Non-Final OA Shingle Waste Solutions, Inc.
18534583 Hook, Hook Pile Foundation System and its Application Thereof Non-Final OA Mohammad Tofigh Rayhani
18521044 ANCHOR BOLT WITH ANTI PROJECTION MECHANISM Non-Final OA Grillage Major Inc.
18547365 TRANSPORT CAP OF A SEA FOUNDATION PILE, INSTALLATION CRADLE OF THE TRANSPORT CAP OF A SEA FOUNDATION PILE, METHOD OF INSTALLING A TRANSPORT CAP INSIDE A FOUNDATION PILE, TOWING SET OF SEA FOUNDATION PILES, METHOD OF SEA TOWAGE FOUNDATION PILES AND PREPARATION OF A FOUNDATION PILE FOR INSTALLATION IN THE SEABED Non-Final OA Fairplay Towage Polska Sp. z o.o. Sp. k.

Facing This Examiner?

IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.

Build Your Strategy

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month