Listed by the USPTO as BRAUCH, CHARLES JOSEPH
Tech Center 3700 • Art Units: 3747 3783
This examiner grants 82% of resolved cases
BRAUCH, CHARLES JOSEPH works in Tech Center 3700 and art unit 3747, with 1221 resolved cases. The allowance rate is 81.7%, and the median time to allowance is 756 days. The interview lift is 13.5%, indicating a positive but secondary association between interviews and allowance.
The listed companies are Robert Bosch GmbH, Cummins Inc., and Toyota Motor Corporation. The listed firms are BUCHANAN, INGERSOLL & ROONEY PC, Burr & Forman LLP - FGTL, and MAIER & MAIER, PLLC. The large record and relatively short median time to allowance provide useful planning context, with interviews available as a supporting measure.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 19122298 | FUEL INJECTOR ARRANGEMENT FOR INSTALLING A FUEL INJECTOR IN AN INTERNAL COMBUSTION ENGINE | Non-Final OA | Robert Bosch GmbH |
| 18585948 | EMERGENCY BRAKING TRIGGERING DEVICE AND METHOD FOR TRIGGERING EMERGENCY BRAKING OF A VEHICLE | Final Rejection | Robert Bosch GmbH |
| 19350412 | VEHICLE CONTROL SYSTEM | Non-Final OA | TOYOTA JIDOSHA KABUSHIKI KAISHA |
| 18720745 | CONTROL SYSTEM FOR A VEHICLE | Non-Final OA | Volvo Truck Corporation |
| 19336793 | CONTROL CIRCUIT, CONTROL SYSTEM, AND TRANSPORTATION DEVICE | Non-Final OA | CONTEMPORARY AMPEREX TECHNOLOGY CO., LIMITED |
| 18845195 | CONTROL DEVICE FOR AC ROTATING MACHINE AND ELECTRIC POWER STEERING DEVICE | Non-Final OA | Mitsubishi Electric Corporation |
| 19209537 | PNEUMATIC VALVE ARRANGEMENT AND METHOD OF OPERATING A PNEUMATIC VALVE ARRANGEMENT | Final Rejection | ZF CV Systems Europe BV |
| 18872369 | METHOD FOR OPERATING A MOTOR VEHICLE, MOTOR VEHICLE, AND COMPUTER PROGRAM PRODUCT | Final Rejection | AUDI AG |
| 19069574 | VEHICLE NAVIGATION METHOD, METHOD FOR OBTAINING DRIVING REFERENCE INFORMATION, APPARATUS, AND VEHICLE | Final Rejection | Yinwang Intelligent Technologies Co., Ltd. |
| 18953425 | PUMP ASSEMBLIES WITH BARREL GUIDING FEATURES | Non-Final OA | Cummins Inc. |
| 18926652 | GASEOUS INJECTOR PREPARATION METHOD FOR COLD ENGINE START | Non-Final OA | Cummins Inc. |
| 19040286 | WHEEL SLIP CONTROLS AND RESPONSE TO TIRE PRESSURE | Final Rejection | Ford Global Technologies, LLC |
| 18088162 | ENVIRONMENTAL BARRIER COATING | Final Rejection | RAYTHEON TECHNOLOGIES CORPORATION |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy81.7% of resolved applications examined by Charles Joseph Brauch were allowed (1,221 resolved cases), compared with 69.1% across Art Unit 3747 over the last five years.
This examiner's interview lift is +13.5 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Charles Joseph Brauch took 756 days on average from filing to allowance.
Charles Joseph Brauch examines applications in Art Unit 3747 in Tech Center 3700 (Medical Devices & Mechanical Engineering).