Tech Center 2100 • Art Units: 2118 2142 2144
This examiner grants 76% of resolved cases
Mong-Shune Chung works in Art Unit 2118 within Tech Center 2100. The examiner has 410 resolved cases and an allowance rate of 76.3 percent. This rate suggests a favorable outlook for patent applicants, with a majority of cases reaching a successful conclusion.
The interview lift is 22.5 percent, showing that interviews provide a boost to the probability of success over the 76.3 percent base rate. While the base allowance rate is already high, engaging in an interview further improves the chances of securing a grant. This suggests the examiner is open to discussing and resolving issues through direct communication.
The median days to allowance is 974. This timeline indicates the prosecution speed for allowed applications. Practitioners can use this 974 day figure to estimate the time required to move from filing to a patent grant when working with this examiner. These figures provide a data-grounded foundation for practitioners to develop an effective prosecution strategy when working with this examiner.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18908262 | CONTROLLING A DEVICE BASED ON PROCESSING OF IMAGE DATA THAT CAPTURES THE DEVICE AND/OR AN INSTALLATION ENVIRONMENT OF THE DEVICE | Non-Final OA | GOOGLE LLC |
| 18861160 | METHOD, APPARATUS, DEVICE AND STORAGE MEDIUM FOR CONTENT SHARING | Non-Final OA | Beijing Zitiao Network Technology Co., Ltd. |
| 18744394 | IMPROVED AIR-COOLING FOR RESOURCE COMPONENTS OF DATA CENTER DEVICES | Non-Final OA | Microsoft Technology Licensing, LLC |
| 18219002 | CONTEXTUALIZED TERMINOLOGY REPLACEMENT | Non-Final OA | International Business Machines Corporation |
| 18592761 | SYSTEMS AND METHODS FOR WORKSITE DYNAMIC CHARGING | Final Rejection | Caterpillar Inc. |
| 18817832 | BUILDING CHILLER/HEAT PUMP SYSTEM CARBON EMISSION REDUCTION BY SHIFTING TEMPERATURE SETPOINT | Non-Final OA | CARRIER CORPORATION |
| 18727082 | METHOD FOR CONFIGURING A CONTROL NETWORK, AND CONTROL NETWORK, COMPUTER PROGRAM AND COMPUTER-READABLE MEDIUM | Non-Final OA | Siemens Energy Global GmbH & Co. KG |
| 18731672 | EMERGENCY RESPONSE SYSTEM | Non-Final OA | Taiwan Semiconductor Manufacturing Company Limited |
| 18750173 | POWER GRID SYSTEMS AND METHODS WITH ZONAL AUTONOMOUS CONTROL | Non-Final OA | GE Infrastructure Technology LLC |
| 18626653 | LEARNING CLOSED-LOOP CONTROL POLICIES FOR MANUFACTURING | Non-Final OA | Universita Della Svizzera Italiana |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy