Listed by the USPTO as DAVIS, CHRISTOPHER RYAN
Tech Center 2400 • Art Units: 2476
This examiner grants 78% of resolved cases
Christopher Ryan Davis serves as an examiner in Art Unit 2476 within Tech Center 2400. The examiner has reached a final disposition in 54 resolved cases, maintaining an allowance rate of 77.8%. For applications that successfully reach allowance, the median time to allowance is 1173 days. This 1173 days timeline suggests that practitioners should prepare for a prosecution period of approximately three years to reach a final grant.
Direct engagement with the examiner appears to be a productive strategy, as the data reflects an interview lift of 20.4%. This increase suggests that verbal discussion can effectively resolve rejections, providing a higher probability of success than the 77.8% baseline allowance rate. The 20.4% lift is a key metric for applicants deciding whether to request a formal interview in Art Unit 2476. Practitioners should use this lift to justify direct communication.
The examiner’s docket includes prominent companies such as Qualcomm Incorporated, Huawei Technologies Co., Ltd., and LG Electronics Inc. Legal representation is frequently provided by AMPACC Law Group, PLLC, Harrity & Harrity, LLP, and Barta Jones, PLLC. These firms have managed the 54 resolved cases in Tech Center 2400. The 77.8% allowance rate and 20.4% interview lift provide a clear statistical foundation for developing a successful prosecution strategy.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18714709 | Versatile Access Point Cooperation Setup | Final Rejection | Telefonaktiebolaget LM Ericsson (publ) |
| 18836552 | METHOD AND APPARATUS FOR TRANSMITTING MAC PDU INCLUDING AT LEAST ONE MAC CE IN WIRELESS COMMUNICATION SYSTEM | Non-Final OA | LG ELECTRONICS INC. |
| 18759097 | COMMUNICATION METHOD AND COMMUNICATION APPARATUS | Non-Final OA | Huawei Technologies Co., Ltd. |
| 17959511 | SECOND SERVING CELL DRX CONTROL METHOD AND APPARATUS USING INFORMATION IN FIRST SERVING CELL | Non-Final OA | HUAWEI TECHNOLOGIES CO., LTD. |
| 18649364 | UE CAPABILITY AND SRS CONFIGURATION FOR CLOSED-LOOP ANTENNA SELECTION | Final Rejection | QUALCOMM Incorporated |
| 18417782 | SUBBAND FULL-DUPLEX AWARE USER EQUIPMENT | Non-Final OA | QUALCOMM Incorporated |
| 18505618 | PEAK-TO-AVERAGE POWER RATIO BASED FREQUENCY INTERLEAVING | Non-Final OA | QUALCOMM Incorporated |
| 18366524 | TECHNIQUES FOR JOINT COMMUNICATION AND SENSING USING GUARD SYMBOLS IN SIDELINK | Final Rejection | QUALCOMM Incorporated |
| 18074434 | SPACE-FREQUENCY PRECODING FOR HYBRID FREQUENCY MULTI-HOP LINKS WITH LINE-OF-SIGHT MULTIPLE-INPUT AND MULTIPLE-OUTPUT ON AN INTERMEDIATE HOP | Non-Final OA | QUALCOMM Incorporated |
| 17813502 | SYNCHRONIZED LONG RANGE SIDELINK COMMUNICATION | Non-Final OA | QUALCOMM Incorporated |
| 18722092 | METHODS AND APPARATUSES FOR SIDELINK POSITIONING | Non-Final OA | LENOVO (BEIJING) LIMITED |
| 18833703 | MEASUREMENTS IN A COMMUNICATION SYSTEM | Non-Final OA | NOKIA TECHNOLOGIES OY |
| 18104496 | METHOD, DEVICE AND COMPUTER PROGRAM PRODUCT FOR WIRELESS COMMUNICATION | Final Rejection | ZTE CORPORATION |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy77.8% of resolved applications examined by Christopher Ryan Davis were allowed (54 resolved cases), compared with 78.1% across Art Unit 2476 over the last five years.
This examiner's interview lift is +20.4 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Christopher Ryan Davis took 1,173 days on average from filing to allowance.
Christopher Ryan Davis examines applications in Art Unit 2476 in Tech Center 2400 (Networking & Security).