Listed by the USPTO as GEHMAN, BRYON P
Tech Center 4100 • Art Units: 3728 3731 3735 3736 4100
This examiner grants 74% of resolved cases
GEHMAN, BRYON P has resolved 1992 cases in Tech Center 4100 and Art Unit 3728. The allowance rate is 73.7%, while the median time to allowance is 713 days. An interview is associated with a 30.6% lift in allowance rate, making interview preparation a potentially important part of prosecution strategy for matters before this examiner.
The recorded company docket includes The Procter & Gamble Company, Westrock Packaging Systems LLC, and Pratt Corrugated Holdings Inc. The leading firms are BACON & THOMAS, PLLC, BALLARD SPAHR LLP, and BIRCH STEWART KOLASCH & BIRCH, LLP. These records identify packaging-related applicants and counsel with experience appearing in this docket.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18925629 | METHOD OF USING DOUBLE-HANDLE BOX | Non-Final OA | Pratt Corrugated Holdings, Inc. |
| 19134856 | PACKAGING FOR A WINDSCREEN WIPER BLADE | Non-Final OA | VALEO SYSTEMES D'ESSUYAGE |
| 19335035 | DIGITAL ARRAYS COMPRISING SUSTAINABLE SANITARY TISSUE PRODUCTS | Non-Final OA | The Procter & Gamble Company |
| 19314005 | SANITARY TISSUE PRODUCT PACKAGES CONVEYING SUSTAINABILITY | Non-Final OA | The Procter & Gamble Company |
| 19133467 | CONTAINER FOR STORING ADDITION-CURING LIQUID SILICONE COMPOSITION | Non-Final OA | SHIN-ETSU CHEMICAL CO., LTD. |
| 18577491 | Compact batch of grouped containers and method for packaging same | Final Rejection | SIDEL PARTICIPATIONS |
| 19205981 | WAFER CONTAINER PURGE PORT ASSEMBLY | Final Rejection | ENTEGRIS, INC. |
| 19046589 | FLEXIBLE FLUID RESERVOIR SYSTEM | Final Rejection | Appalachia Design |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy73.7% of resolved applications examined by Bryon P Gehman were allowed (1,992 resolved cases), compared with 0.0% across Art Unit 3728 over the last five years.
This examiner's interview lift is +30.6 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Bryon P Gehman took 713 days on average from filing to allowance.
Bryon P Gehman examines applications in Art Unit 3728 in Tech Center 4100.