Listed by the USPTO as GEISS, BRIAN BUTLER
Tech Center 2800 • Art Units: 2855 2857 2863
This examiner grants 70% of resolved cases
GEISS, BRIAN BUTLER has resolved 73 cases in Tech Center 2800 and Art Unit 2855. The allowance rate is 69.9%, and the median time to allowance is 1162 days. The interview lift is 27.5%, indicating that interviews may be relevant when developing a prosecution approach before this examiner.
The listed companies are Schlumberger Technology Corporation, Halliburton Energy Services Inc., and Samsung Electronics Co., Ltd. The listed firms are BACHMAN & LAPOINTE, P.C., C. Tumey Law Group PLLC - HES, and DUFT & BORNSEN, PC. The resolved-case volume is limited, so the statistics should inform rather than determine application strategy.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18207510 | METHODS AND SYSTEMS OF DETECTING DEFECTS OF WAFER | Non-Final OA | SAMSUNG ELECTRONICS CO., LTD. |
| 18720793 | OFFSET WELL IDENTIFICATION AND PARAMETER SELECTION | Non-Final OA | Schlumberger Technology Corporation |
| 17968628 | Fast Proxy Model For Well Casing Integrity Evaluation | Final Rejection | Halliburton Energy Services, Inc. |
| 18401552 | EXTERNAL ENVIRONMENT RECOGNITION APPARATUS | Non-Final OA | Honda Motor Co., Ltd. |
| 18708345 | SIGNAL LINEARIZATION IN A MEASUREMENT DEVICE | Non-Final OA | KONINKLIJKE PHILIPS N.V. |
| 18563537 | PLANT MONITORING DEVICE, PLANT MONITORING METHOD, AND PROGRAM | Final Rejection | MITSUBISHI HEAVY INDUSTRIES, LTD. |
| 17781508 | Method and Apparatus for Sensor Measurements Processing | Non-Final OA | Siemens Aktiengesellschaft |
| 18623274 | STORAGE SYSTEM CONFIGURED FOR USE WITH AN ENERGY MANAGEMENT SYSTEM | Non-Final OA | Enphase Energy, Inc. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy69.9% of resolved applications examined by Brian Butler Geiss were allowed (73 resolved cases), compared with 76.8% across Art Unit 2855 over the last five years.
This examiner's interview lift is +27.5 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Brian Butler Geiss took 1,162 days on average from filing to allowance.
Brian Butler Geiss examines applications in Art Unit 2855 in Tech Center 2800 (Semiconductors, Circuits & Optics).