Prosecution Insights
Last updated: November 12, 2026

Halliburton Energy Services Inc.

Technology areas: Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems

174 pending office actions • 53 art units • 122 examiners • 0 of 174 (0%) have an AI response strategy ready • 533 patents granted in the last 365 days

Analysis

Halliburton Energy Services Inc. has 174 pending office actions in Transportation, E-Commerce & Mechanical Systems. The portfolio spans 122 distinct examiners and 53 distinct art units, demonstrating substantial distribution across examination channels. This profile supports a coordinated prosecution program that can identify related technologies while retaining matter-specific control over amendments and arguments.

HALL, KRISTYN A is the busiest examiner, with 5 pending matters. That examiner is a meaningful focal point for preparation, but the broad examiner coverage means it cannot serve as the sole basis for portfolio strategy. Counsel can combine repeat-assignment insight with consistent technical disclosure practices and separate art-unit analysis.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

174
Total Pending OAs
105
Non-Final OAs
63
Final Rejections
6
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 39 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

14
Overdue
0
Due this week
14
Due this month
8
Due in next 60 days
3
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 39 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (14)Due ≤ 30 days (14)Due ≤ 60 days (8)Due later (3)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

103
Hard (59%)
60
Medium (34%)
11
Easy (6%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§101 only11 (6%)
§101 + other30 (17%)
§103 only48 (28%)
§102 only8 (5%)
§112 only10 (6%)
Double-patenting only1 (1%)
Double-patenting + other4 (2%)
Multi-statute (no §101)62 (36%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

13
Life Sciences
7% of docket
30
Information Tech
17% of docket
6
Communications
3% of docket
43
Semiconductors
25% of docket
82
Mechanical / Eng
47% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

1,740 h
Manual time on pending OAs
348 h
Time saved (low, 20%)
609 h
Time saved (mid, 35%)
15.2 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
HALL, KRISTYN A 5 82.0% -5.7%
WALLACE, KIPP CHARLES 4 78.3% +25.5%
BOMAR, THOMAS S 4 83.1% +0.1%
MACDONALD, STEVEN A 4 80.5% +12.9%
PATEL, NEEL G 4 62.6% +34.4%
ANDREWS, DAVID L 3 71.6% +16.4%
CARROLL, DAVID P. 3 80.3% +13.9%
GAY, JENNIFER HAWKINS 3 85.2% +8.5%
GRAY, GEORGE STERLING 3 75.4% +9.9%
CULLER, JILL E 3 57.3% +13.9%

Quick Wins (11)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
19422983 DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE BOMAR, THOMAS S —
19423108 DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY HAVING A WIDTH (WEM) THAT IS NO MORE THAN 200% OF A STROKE DISTANCE (D) AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE BOMAR, THOMAS S —
19423141 DOWNHOLE DEVICE EMPLOYING (N) ELECTROMAGNET ASSEMBLIES AND (M) FERROMAGNET ASSEMBLIES TO ACTUATE A MOVABLE FEATURE, WHEREIN (N) IS GREATER THAN (M) CARROLL, DAVID P. —
19400023 WHIPSTOCK FOR USE WITH A MILL BIT INCLUDING VARYING MATERIAL REMOVAL RATES GAY, JENNIFER HAWKINS —
19379604 FLOW CONTROL VALVE EMPLOYING AT LEAST A 1.5 KSI PRESSURE DIFFERENTIAL MACDONALD, STEVEN A —
19379591 FLOW CONTROL VALVE EMPLOYING AN ELECTRIC ACTUATOR AND METAL-TO-METAL SEAL MACDONALD, STEVEN A —
19379641 FLOW CONTROL VALVE EMPLOYING FIRST AND SECOND SEPARATELY OPERABLE ACTUATORS CARROLL, DAVID P. —
19347217 MODULAR POLYMER COMPOSITE LIFT TUBE IN A WELLBORE BOMAR, THOMAS S —

Hard Cases (103)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
17831192 COUPLINGS AND COUPLING SYSTEMS BINDA, GREGORY JOHN 145d overdue
18492915 LONG-TERM TREND ANALYSIS FOR EQUIPMENT FOR WELL SYSTEMS WORKU, KIDEST 53d overdue
17944818 DESIGNING SMART ENVIRONMENTAL EFFICIENCY FLUIDS COCCHI, MICHAEL EDWARD 36d overdue
18508813 MULTI-SENSOR DOWNHOLE GAUGE FULLER, ROBERT EDWARD 22d overdue
18807707 STEERABILITY OF DOWNHOLE RANGING TOOLS USING ROTARY MAGNETS WLODARSKI, NICHOLAS NMN 18d overdue
18494395 SEALING ASSEMBLY EMPLOYING A CYLINDRICAL EXTRUSION LIMITER ANDREWS, DAVID L 8d overdue
18241176 METHODS TO PERFORM NUCLEAR MAGNETIC RESONANCE MEASUREMENTS, AND NUCLEAR MAGNETIC RESONANCE TOOLS CLARKE, ADAM S 3d overdue
18481734 DOWNHOLE TOOL INCLUDING A PACKER ASSEMBLY, A COMPLETION ASSEMBLY, AND A FIXEDLY COUPLED WHIPSTOCK ASSEMBLY CRAIG, DANIEL THOMAS 9d

Interview Candidates (21)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18494395 SEALING ASSEMBLY EMPLOYING A CYLINDRICAL EXTRUSION LIMITER ANDREWS, DAVID L 8d overdue
18365000 CUTTINGS MAGNETIC SUSCEPTIBILITY AND ASSOCIATED DEVICE CULLER, JILL E 28d
18829715 SPRING ASSEMBLY INCLUDING TWO SEPARATE INDEPENDENT WAVE SPRINGS PATEL, NEEL G 41d
19546048 SONDE CENTRALIZATION INSIDE A COLLAR WALLACE, KIPP CHARLES —
19546026 SONDE CENTRALIZATION INSIDE A COLLAR WALLACE, KIPP CHARLES —
19542300 DOWNHOLE ELECTRICAL CONDUCTOR MOVEMENT ARRESTOR ANDREWS, DAVID L —
19536486 DEVICES, SYSTEMS, AND METHODS FOR WELLBORE OPERATIONS CARROLL, DAVID P. —
19423141 DOWNHOLE DEVICE EMPLOYING (N) ELECTROMAGNET ASSEMBLIES AND (M) FERROMAGNET ASSEMBLIES TO ACTUATE A MOVABLE FEATURE, WHEREIN (N) IS GREATER THAN (M) CARROLL, DAVID P. —

Top Art Units

Art UnitApps
3676 30
2857 22
3674 21
3672 16
2188 7
2853 5
2858 5
2855 4
2688 4
2119 4

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19631712 DOWNHOLE TOOL INCLUDING A SACRIFICIAL CONDUCTIVE PROTECTION LAYER POSITIONED ABOUT A MATERIAL TO BE PROTECTED STEPHENSON, DANIEL P 3676 §102§103 Non-Final OA — Pending Mar 27, 2026
19546048 SONDE CENTRALIZATION INSIDE A COLLAR WALLACE, KIPP CHARLES 3674 §102§103 Non-Final OA — Pending Feb 20, 2026
19546026 SONDE CENTRALIZATION INSIDE A COLLAR WALLACE, KIPP CHARLES 3674 §102§103Other Non-Final OA — Pending Feb 20, 2026
19543603 FORMATION FLUID SAMPLING USING PROBE WITH INFLATABLE PAD BOMAR, THOMAS S 3674 §102§103 Non-Final OA — Pending Feb 18, 2026
19542300 DOWNHOLE ELECTRICAL CONDUCTOR MOVEMENT ARRESTOR ANDREWS, DAVID L 3672 §102§103§112 Non-Final OA — Pending Feb 17, 2026
19536486 DEVICES, SYSTEMS, AND METHODS FOR WELLBORE OPERATIONS CARROLL, DAVID P. 3674 §103§112 Non-Final OA — Pending Feb 11, 2026
19422983 DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE BOMAR, THOMAS S 3674 §102Other Non-Final OA — Pending Dec 17, 2025
19423108 DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY HAVING A WIDTH (WEM) THAT IS NO MORE THAN 200% OF A STROKE DISTANCE (D) AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE BOMAR, THOMAS S 3674 §102Other Non-Final OA — Pending Dec 17, 2025
19423141 DOWNHOLE DEVICE EMPLOYING (N) ELECTROMAGNET ASSEMBLIES AND (M) FERROMAGNET ASSEMBLIES TO ACTUATE A MOVABLE FEATURE, WHEREIN (N) IS GREATER THAN (M) CARROLL, DAVID P. 3674 §112Other Non-Final OA — Pending Dec 17, 2025
19407655 EXPANDABLE METAL SLIP RING FOR USE WITH A SEALING ASSEMBLY GAY, JENNIFER HAWKINS 3619 §101§103§112 Non-Final OA — Pending Dec 03, 2025
19406805 MONITORING CEMENT INTEGRITY FOR HYDROGEN LEAKAGE GAY, JENNIFER HAWKINS 3619 §102§103§112 Non-Final OA — Pending Dec 02, 2025
19400023 WHIPSTOCK FOR USE WITH A MILL BIT INCLUDING VARYING MATERIAL REMOVAL RATES GAY, JENNIFER HAWKINS 3619 §102§103DP Non-Final OA — Pending Nov 25, 2025
19388734 MILLING ASSEMBLY FOR DRILLING A MULTILATERAL WELLBORE WALLACE, KIPP CHARLES 3674 §103 Non-Final OA — Pending Nov 13, 2025
19384757 SUMMARY OF DRILLING AND OPERATION REPORTS BASED ON A USER PROMPT ALAM, SHAHID AL 2161 §101§103 Non-Final OA — Pending Nov 10, 2025
19379604 FLOW CONTROL VALVE EMPLOYING AT LEAST A 1.5 KSI PRESSURE DIFFERENTIAL MACDONALD, STEVEN A 3674 §103 Non-Final OA — Pending Nov 04, 2025
19379591 FLOW CONTROL VALVE EMPLOYING AN ELECTRIC ACTUATOR AND METAL-TO-METAL SEAL MACDONALD, STEVEN A 3674 §103 Non-Final OA — Pending Nov 04, 2025
19379641 FLOW CONTROL VALVE EMPLOYING FIRST AND SECOND SEPARATELY OPERABLE ACTUATORS CARROLL, DAVID P. 3674 §103DP Non-Final OA — Pending Nov 04, 2025
19358048 OFFSET WELL ANALYSIS FOR DERIVING NEXT WELL DRILLING PARAMETERS NORRIS, URSULA LEE 3676 §103§112 Non-Final OA — Pending Oct 14, 2025
19347217 MODULAR POLYMER COMPOSITE LIFT TUBE IN A WELLBORE BOMAR, THOMAS S 3674 §103 Non-Final OA — Pending Oct 01, 2025
19339850 METHOD TO REDUCE PEAK TREATMENT CONSTITUENTS IN SIMULTANEOUS TREATMENT OF MULTIPLE WELLS WOOD, DOUGLAS S 3672 §101§102§112Other Non-Final OA — Pending Sep 25, 2025
19317582 A DOWNHOLE TOOL EMPLOYING A PRESSURE INTENSIFIER ANDREWS, DAVID L 3672 §102§112Other Non-Final OA — Pending Sep 03, 2025
19316903 VOLUMETRIC COMPENSATION FOR SEALING PERFORMANCE UNDER LARGE TEMPERATURE SWING CONDITIONS GRAY, GEORGE STERLING 3676 §103§112 Non-Final OA — Pending Sep 02, 2025
19306927 OPEN HOLE GRAVEL PACK SYSTEM FOR MANAGED PRESSURE DRILLING (MPD) APPLICATIONS STEPHENSON, DANIEL P 3676 §103 Final Rejection — Pending Aug 21, 2025
19286911 WELLBORE EXCLUSION FLUID METHOD AND APPARATUS FOR DOWNHOLE LOGGING CULLER, JILL E 2853 §102 Non-Final OA — Pending Jul 31, 2025
19149001 COMPLETIONS-BASED WELL CLEANOUT USING MAGNETIC CLEANOUT TOOL MICHENER, BLAKE E 3676 §102§103§112 Final Rejection — Pending Jul 17, 2025
19240304 ACTUATOR WITH MOVABLE CYLINDER FOR ROTARY STEERABLE SYSTEM WALLACE, KIPP CHARLES 3674 §102§103 Final Rejection — Pending Jun 17, 2025
19233124 HEATERS TO ACCELERATE SETTING OF EXPANDABLE METAL YAO, THEODORE N 3676 §103§112 Final Rejection — Pending Jun 10, 2025
19232491 VOLTAGE TO ACCELERATE/DECELERATE EXPANDABLE METAL YAO, THEODORE N 3676 §102§103§112 Final Rejection 26d Pending Jun 09, 2025
19215695 DOWNHOLE TOOL INCLUDING RELATED LUG SLOTS AND LUGS FOR COUPLING A MILLING TOOL AND WHIPSTOCK ASSEMBLY THOMPSON, KENNETH L 3676 §102 Final Rejection 25d overdue Pending May 22, 2025
19210156 DOWNHOLE TOOL WITH CRACK COMPLIANT SEAL AND HIGH YIELD STRENGTH WELD POSITIONED AT A JOINT THEREOF MACDONALD, STEVEN A 3674 §103 Final Rejection — Pending May 16, 2025
19210530 METHOD FOR PLACING NON-REACTIVE COLLOID PARTICLES TO STOP GAS MIGRATION IN EXPANDABLE METAL APPLICATIONS SUE-AKO, ANDREW B. 3674 §112 Final Rejection — Pending May 16, 2025
19210415 NON-REACTIVE COLLOID PARTICLES TO STOP GAS MIGRATION IN EXPANDABLE METAL APPLICATIONS SUE-AKO, ANDREW B. 3674 §112 Final Rejection 26d Pending May 16, 2025
19210820 TWO-PART DRILLING AND RUNNING TOOL INCLUDING A ONE WAY MECHANISM THOMPSON, KENNETH L 3676 §102 Final Rejection 25d overdue Pending May 16, 2025
19210231 DOWNHOLE TOOL WITH CRACK COMPLIANT SEAL AND MECHANICAL STRENGTHENING FEATURE AT A JOINT THEREOF MACDONALD, STEVEN A 3674 §103 Final Rejection — Pending May 16, 2025
19205002 TWO-PART DRILLING AND RUNNING TOOL HALL, KRISTYN A 3672 §103 Final Rejection — Pending May 12, 2025
19202467 INTERNAL SLIP DESIGN WITH MINIMUM BACKLASH FOR PACKERS SEAL ENHANCEMENT LOIKITH, CATHERINE A 3674 §101§102§103Other Non-Final OA — Pending May 08, 2025
19198323 ESTIMATION OF ROCK ABRASIVENESS AND ROCK STRENGTH USING BIT RESPONSE DATA HALL, KRISTYN A 3672 §101 Non-Final OA — Pending May 05, 2025
19198377 CUTTER FORCES AND WEAR SEVERITY DETERMINATION FOR A DRILL BIT FOR DRILLING A WELLBORE HALL, KRISTYN A 3672 §101§103§112 Non-Final OA 33d Pending May 05, 2025
19197239 COIL OF REFERENCE FIBER FOR DOWNHOLE FIBER SENSING MEASUREMENT JAGAN, MIRELLYS 2855 §102§103§112 Non-Final OA — Pending May 02, 2025
19191425 WELLBORE SERVICES SYSTEM WITH ANYTIME ACCESS FOR PUMP MAINTENANCE FULLER, ROBERT EDWARD 3676 §103 Non-Final OA 9d Pending Apr 28, 2025
19191825 CRYOGENIC COOLANT FLOW MANAGEMENT FOR DOWNHOLE SUPERCONDUCTING CABLE WLODARSKI, NICHOLAS NMN 3672 §103§112Other Final Rejection — Pending Apr 28, 2025
19187505 DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A SIGNAL NOISE SOURCE POWERED BY A DOWNHOLE POWER SOURCE, THE SENSOR CONFIGURED TO SENSE FOR NOISE AND SEND UPHOLE OPERATIONAL DATA EMBEDDED WITHIN THE NOISE AKARAGWE, YANICK A 3672 §103 Final Rejection 28d overdue Pending Apr 23, 2025
19187195 DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A FLOW CONTROL DEVICE, THE SENSOR CONFIGURED TO SENSE FOR A CHANGE IN NOISE EMANATING FROM THE FLOW CONTROL DEVICE JELLETT, MATTHEW WILLIAM 3753 §103§112 Non-Final OA — Pending Apr 23, 2025
19071168 COILED TUBING DEPLOYMENT/RETRIEVAL APPARATUS EMPLOYING MULTIPLE TUBING GUIDES AND A METHOD OF USE THEREOF BUCK, MATTHEW R 3672 §102§103 Non-Final OA — Pending Mar 05, 2025
19063643 MOTION HYPERPARAMETER CORRELATION AND SELECTION FOR NUCLEAR MAGNETIC RESONANCE (NMR) MOTION CORRECTION IN WELL SYSTEMS PATEL, RISHI R 2858 §112 Non-Final OA — Pending Feb 26, 2025
19047821 DIGITALLY RECONFIGURABLE ANALOG COMPUTATIONS FOR SOLVING OPTIMIZATION PROBLEMS NGUYEN, KHAI M 2845 DP Non-Final OA — Pending Feb 07, 2025
19042531 LAYERED TARGET FOR NEUTRON GENERATOR GARNER, LILY CRABTREE 3646 §101§102§112Other Non-Final OA — Pending Jan 31, 2025
19041902 RAPID ROCK PETROPHYSICAL QUALITY ANALYSIS WITH ELASTOMERIC SENSOR BASED IMAGES SOFRONIOU, MICHAEL MARIO 2661 §103 Non-Final OA — Pending Jan 30, 2025
19041571 METHOD AND APPARATUS FOR MAKING IMAGING MEASUREMENTS OF A FORMATION CORE HAWKINS, DOMINIC E 2858 §103 Non-Final OA — Pending Jan 30, 2025
19040059 DOWNHOLE TOOL EMPLOYING A WHIPSTOCK ASSEMBLY, PACKER ASSEMBLY AND DOWNHOLE POWER UNIT WLODARSKI, NICHOLAS NMN 3672 §102§103 Non-Final OA — Pending Jan 29, 2025

View all 174 →

Managing Halliburton Energy Services Inc.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does Halliburton Energy Services Inc. have?

Halliburton Energy Services Inc. has 174 pending office actions as of November 2026, spread across 53 art units and 122 examiners.

Which USPTO examiner handles the most Halliburton Energy Services Inc. applications?

Kristyn A Hall has the most, with 5 of Halliburton Energy Services Inc.'s pending office actions.

What technology area are Halliburton Energy Services Inc.'s patent applications in?

Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month