Prosecution Insights
Last updated: October 27, 2026

Halliburton Energy Services Inc.

Technology areas: Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems

178 pending office actions • 49 art units • 118 examiners • 0 of 178 (0%) have an AI response strategy ready • 527 patents granted in the last 365 days

Analysis

Halliburton Energy Services Inc. has 189 pending office actions in Transportation, E-Commerce & Mechanical Systems. The matters span 124 distinct examiners and 52 distinct art units, indicating a large portfolio distributed across numerous examination channels.

HALL, KRISTYN A is the busiest examiner, with 6 pending matters. That docket represents one recurring assignment within the larger workload. Counsel should use centralized issue and deadline tracking while maintaining examiner-specific strategies for the recurring matters.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

178
Total Pending OAs
103
Non-Final OAs
65
Final Rejections
10
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 50 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

20
Overdue
2
Due this week
16
Due this month
7
Due in next 60 days
5
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 50 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (20)Due ≤ 7 days (2)Due ≤ 30 days (16)Due ≤ 60 days (7)Due later (5)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

107
Hard (60%)
63
Medium (35%)
8
Easy (4%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§101 only11 (6%)
§101 + other33 (19%)
§103 only52 (29%)
§102 only8 (4%)
§112 only7 (4%)
Double-patenting only1 (1%)
Double-patenting + other3 (2%)
Multi-statute (no §101)63 (35%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

11
Life Sciences
6% of docket
30
Information Tech
17% of docket
5
Communications
3% of docket
45
Semiconductors
25% of docket
87
Mechanical / Eng
49% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

1,780 h
Manual time on pending OAs
356 h
Time saved (low, 20%)
623 h
Time saved (mid, 35%)
15.6 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
PATEL, NEEL G 6 62.1% +34.6%
ANDREWS, DAVID L 5 71.6% +16.3%
CARROLL, DAVID P. 5 80.1% +14.3%
HALL, KRISTYN A 5 82.1% -5.9%
WALLACE, KIPP CHARLES 4 78.3% +25.5%
BOMAR, THOMAS S 4 83.1% +0.1%
MACDONALD, STEVEN A 4 80.3% +13.0%
CULLER, JILL E 3 57.2% +13.9%
YAO, THEODORE N 3 66.7% +39.0%
SUE-AKO, ANDREW B. 3 71.5% +27.7%

Quick Wins (10)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
19423108 DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY HAVING A WIDTH (WEM) THAT IS NO MORE THAN 200% OF A STROKE DISTANCE (D) AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE BOMAR, THOMAS S —
19423141 DOWNHOLE DEVICE EMPLOYING (N) ELECTROMAGNET ASSEMBLIES AND (M) FERROMAGNET ASSEMBLIES TO ACTUATE A MOVABLE FEATURE, WHEREIN (N) IS GREATER THAN (M) CARROLL, DAVID P. —
19422983 DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE BOMAR, THOMAS S —
19379591 FLOW CONTROL VALVE EMPLOYING AN ELECTRIC ACTUATOR AND METAL-TO-METAL SEAL MACDONALD, STEVEN A —
19379641 FLOW CONTROL VALVE EMPLOYING FIRST AND SECOND SEPARATELY OPERABLE ACTUATORS CARROLL, DAVID P. —
19379604 FLOW CONTROL VALVE EMPLOYING AT LEAST A 1.5 KSI PRESSURE DIFFERENTIAL MACDONALD, STEVEN A —
19347217 MODULAR POLYMER COMPOSITE LIFT TUBE IN A WELLBORE BOMAR, THOMAS S —
19210156 DOWNHOLE TOOL WITH CRACK COMPLIANT SEAL AND HIGH YIELD STRENGTH WELD POSITIONED AT A JOINT THEREOF MACDONALD, STEVEN A —

Hard Cases (107)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
17471345 Core Data Augmentation Methods For Developing Data Driven Based Petrophysical Interpretation Models JONES, CHARLES JEFFREY 150d overdue
17831192 COUPLINGS AND COUPLING SYSTEMS BINDA, GREGORY JOHN 145d overdue
17958178 Autonomous Uncertainty-Aware Engine For Pressure Gradient Identification Using A Discrete Optimization Framework CHAVEZ, ANTHONY RAY 77d overdue
18492915 LONG-TERM TREND ANALYSIS FOR EQUIPMENT FOR WELL SYSTEMS WORKU, KIDEST 53d overdue
17944818 DESIGNING SMART ENVIRONMENTAL EFFICIENCY FLUIDS COCCHI, MICHAEL EDWARD 36d overdue
19286667 INTERNAL SLIP INCLUDING ONE OR MORE SYMMETRICAL TEETH ANDREWS, DAVID L 35d overdue
18508813 MULTI-SENSOR DOWNHOLE GAUGE FULLER, ROBERT EDWARD 22d overdue
18807707 STEERABILITY OF DOWNHOLE RANGING TOOLS USING ROTARY MAGNETS WLODARSKI, NICHOLAS NMN 18d overdue

Interview Candidates (33)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
19286667 INTERNAL SLIP INCLUDING ONE OR MORE SYMMETRICAL TEETH ANDREWS, DAVID L 35d overdue
18494395 SEALING ASSEMBLY EMPLOYING A CYLINDRICAL EXTRUSION LIMITER ANDREWS, DAVID L 8d overdue
19232491 VOLTAGE TO ACCELERATE/DECELERATE EXPANDABLE METAL YAO, THEODORE N 26d
19210415 NON-REACTIVE COLLOID PARTICLES TO STOP GAS MIGRATION IN EXPANDABLE METAL APPLICATIONS SUE-AKO, ANDREW B. 26d
18365000 CUTTINGS MAGNETIC SUSCEPTIBILITY AND ASSOCIATED DEVICE CULLER, JILL E 28d
19050284 BALL-TYPE FLOW STOPPER INCLUDING A PRESSURE ACTIVATED CANTILEVER FEATURE PATEL, NEEL G 79d
19546026 SONDE CENTRALIZATION INSIDE A COLLAR WALLACE, KIPP CHARLES —
19546048 SONDE CENTRALIZATION INSIDE A COLLAR WALLACE, KIPP CHARLES —

Top Art Units

Art UnitApps
3676 30
3674 25
2857 25
3672 16
2188 6
2853 5
2186 5
2858 4
2688 4
2119 4

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19631712 DOWNHOLE TOOL INCLUDING A SACRIFICIAL CONDUCTIVE PROTECTION LAYER POSITIONED ABOUT A MATERIAL TO BE PROTECTED STEPHENSON, DANIEL P 3676 §102§103 Non-Final OA — Pending Mar 27, 2026
19546026 SONDE CENTRALIZATION INSIDE A COLLAR WALLACE, KIPP CHARLES 3674 §102§103Other Non-Final OA — Pending Feb 20, 2026
19546048 SONDE CENTRALIZATION INSIDE A COLLAR WALLACE, KIPP CHARLES 3674 §102§103 Non-Final OA — Pending Feb 20, 2026
19543603 FORMATION FLUID SAMPLING USING PROBE WITH INFLATABLE PAD BOMAR, THOMAS S 3674 §102§103 Non-Final OA — Pending Feb 18, 2026
19542300 DOWNHOLE ELECTRICAL CONDUCTOR MOVEMENT ARRESTOR ANDREWS, DAVID L 3672 §102§103§112 Non-Final OA — Pending Feb 17, 2026
19536486 DEVICES, SYSTEMS, AND METHODS FOR WELLBORE OPERATIONS CARROLL, DAVID P. 3674 §103§112 Non-Final OA — Pending Feb 11, 2026
19423108 DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY HAVING A WIDTH (WEM) THAT IS NO MORE THAN 200% OF A STROKE DISTANCE (D) AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE BOMAR, THOMAS S 3674 §102Other Non-Final OA — Pending Dec 17, 2025
19423141 DOWNHOLE DEVICE EMPLOYING (N) ELECTROMAGNET ASSEMBLIES AND (M) FERROMAGNET ASSEMBLIES TO ACTUATE A MOVABLE FEATURE, WHEREIN (N) IS GREATER THAN (M) CARROLL, DAVID P. 3674 §112Other Non-Final OA — Pending Dec 17, 2025
19422983 DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE BOMAR, THOMAS S 3674 §102Other Non-Final OA — Pending Dec 17, 2025
19407655 EXPANDABLE METAL SLIP RING FOR USE WITH A SEALING ASSEMBLY GAY, JENNIFER HAWKINS 3619 §101§103§112 Non-Final OA — Pending Dec 03, 2025
19400023 WHIPSTOCK FOR USE WITH A MILL BIT INCLUDING VARYING MATERIAL REMOVAL RATES GAY, JENNIFER HAWKINS 3619 §102§103DP Non-Final OA — Pending Nov 25, 2025
19388734 MILLING ASSEMBLY FOR DRILLING A MULTILATERAL WELLBORE WALLACE, KIPP CHARLES 3674 §103 Non-Final OA — Pending Nov 13, 2025
19379632 FLOW CONTROL VALVE EMPLOYING AN ELECTRIC ACTUATOR AND A RESISTIVITY BASED POSITION SENSOR CARROLL, DAVID P. 3674 §103§112Other Non-Final OA — Pending Nov 04, 2025
19379591 FLOW CONTROL VALVE EMPLOYING AN ELECTRIC ACTUATOR AND METAL-TO-METAL SEAL MACDONALD, STEVEN A 3674 §103 Non-Final OA — Pending Nov 04, 2025
19379641 FLOW CONTROL VALVE EMPLOYING FIRST AND SECOND SEPARATELY OPERABLE ACTUATORS CARROLL, DAVID P. 3674 §103DP Non-Final OA — Pending Nov 04, 2025
19379604 FLOW CONTROL VALVE EMPLOYING AT LEAST A 1.5 KSI PRESSURE DIFFERENTIAL MACDONALD, STEVEN A 3674 §103 Non-Final OA — Pending Nov 04, 2025
19371271 FLUID FLOW CONTROL SYSTEM EMPLOYING A FLUIDIC DIODE FOR CONTROL PRESSURE CARROLL, DAVID P. 3674 §101§102§112Other Non-Final OA — Pending Oct 28, 2025
19358048 OFFSET WELL ANALYSIS FOR DERIVING NEXT WELL DRILLING PARAMETERS NORRIS, URSULA LEE 3676 §103§112 Non-Final OA — Pending Oct 14, 2025
19347217 MODULAR POLYMER COMPOSITE LIFT TUBE IN A WELLBORE BOMAR, THOMAS S 3674 §103 Non-Final OA — Pending Oct 01, 2025
19317582 A DOWNHOLE TOOL EMPLOYING A PRESSURE INTENSIFIER ANDREWS, DAVID L 3672 §102§112Other Non-Final OA — Pending Sep 03, 2025
19306927 OPEN HOLE GRAVEL PACK SYSTEM FOR MANAGED PRESSURE DRILLING (MPD) APPLICATIONS STEPHENSON, DANIEL P 3676 §103 Final Rejection — Pending Aug 21, 2025
19286911 WELLBORE EXCLUSION FLUID METHOD AND APPARATUS FOR DOWNHOLE LOGGING CULLER, JILL E 2853 §102 Non-Final OA — Pending Jul 31, 2025
19286667 INTERNAL SLIP INCLUDING ONE OR MORE SYMMETRICAL TEETH ANDREWS, DAVID L 3672 §102§103§112 Final Rejection 35d overdue Pending Jul 31, 2025
19240304 ACTUATOR WITH MOVABLE CYLINDER FOR ROTARY STEERABLE SYSTEM WALLACE, KIPP CHARLES 3674 §102§103 Final Rejection — Pending Jun 17, 2025
19233124 HEATERS TO ACCELERATE SETTING OF EXPANDABLE METAL YAO, THEODORE N 3676 §103§112 Final Rejection — Pending Jun 10, 2025
19232491 VOLTAGE TO ACCELERATE/DECELERATE EXPANDABLE METAL YAO, THEODORE N 3676 §102§103§112 Final Rejection 26d Pending Jun 09, 2025
19215695 DOWNHOLE TOOL INCLUDING RELATED LUG SLOTS AND LUGS FOR COUPLING A MILLING TOOL AND WHIPSTOCK ASSEMBLY THOMPSON, KENNETH L 3676 §102 Final Rejection 25d overdue Pending May 22, 2025
19210530 METHOD FOR PLACING NON-REACTIVE COLLOID PARTICLES TO STOP GAS MIGRATION IN EXPANDABLE METAL APPLICATIONS SUE-AKO, ANDREW B. 3674 §112 Final Rejection — Pending May 16, 2025
19210415 NON-REACTIVE COLLOID PARTICLES TO STOP GAS MIGRATION IN EXPANDABLE METAL APPLICATIONS SUE-AKO, ANDREW B. 3674 §112 Final Rejection 26d Pending May 16, 2025
19210156 DOWNHOLE TOOL WITH CRACK COMPLIANT SEAL AND HIGH YIELD STRENGTH WELD POSITIONED AT A JOINT THEREOF MACDONALD, STEVEN A 3674 §103 Final Rejection — Pending May 16, 2025
19210231 DOWNHOLE TOOL WITH CRACK COMPLIANT SEAL AND MECHANICAL STRENGTHENING FEATURE AT A JOINT THEREOF MACDONALD, STEVEN A 3674 §103 Final Rejection — Pending May 16, 2025
19210820 TWO-PART DRILLING AND RUNNING TOOL INCLUDING A ONE WAY MECHANISM THOMPSON, KENNETH L 3676 §102 Final Rejection 25d overdue Pending May 16, 2025
19205002 TWO-PART DRILLING AND RUNNING TOOL HALL, KRISTYN A 3672 §103 Final Rejection — Pending May 12, 2025
19202467 INTERNAL SLIP DESIGN WITH MINIMUM BACKLASH FOR PACKERS SEAL ENHANCEMENT LOIKITH, CATHERINE A 3674 §101§102§103Other Non-Final OA — Pending May 08, 2025
19198323 ESTIMATION OF ROCK ABRASIVENESS AND ROCK STRENGTH USING BIT RESPONSE DATA HALL, KRISTYN A 3672 §101 Non-Final OA — Pending May 05, 2025
19198377 CUTTER FORCES AND WEAR SEVERITY DETERMINATION FOR A DRILL BIT FOR DRILLING A WELLBORE HALL, KRISTYN A 3672 §101§103§112 Non-Final OA 33d Pending May 05, 2025
19191825 CRYOGENIC COOLANT FLOW MANAGEMENT FOR DOWNHOLE SUPERCONDUCTING CABLE WLODARSKI, NICHOLAS NMN 3672 §103§112Other Final Rejection — Pending Apr 28, 2025
19191425 WELLBORE SERVICES SYSTEM WITH ANYTIME ACCESS FOR PUMP MAINTENANCE FULLER, ROBERT EDWARD 3676 §103 Non-Final OA 9d Pending Apr 28, 2025
19187195 DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A FLOW CONTROL DEVICE, THE SENSOR CONFIGURED TO SENSE FOR A CHANGE IN NOISE EMANATING FROM THE FLOW CONTROL DEVICE JELLETT, MATTHEW WILLIAM 3753 §103§112 Non-Final OA — Pending Apr 23, 2025
19187505 DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A SIGNAL NOISE SOURCE POWERED BY A DOWNHOLE POWER SOURCE, THE SENSOR CONFIGURED TO SENSE FOR NOISE AND SEND UPHOLE OPERATIONAL DATA EMBEDDED WITHIN THE NOISE AKARAGWE, YANICK A 3672 §103 Final Rejection 28d overdue Pending Apr 23, 2025
19071168 COILED TUBING DEPLOYMENT/RETRIEVAL APPARATUS EMPLOYING MULTIPLE TUBING GUIDES AND A METHOD OF USE THEREOF BUCK, MATTHEW R 3672 §102§103 Non-Final OA — Pending Mar 05, 2025
19063643 MOTION HYPERPARAMETER CORRELATION AND SELECTION FOR NUCLEAR MAGNETIC RESONANCE (NMR) MOTION CORRECTION IN WELL SYSTEMS PATEL, RISHI R 2858 §112 Non-Final OA — Pending Feb 26, 2025
19062310 SAFETY VALVE EMPLOYING A MECHANICAL CONNECTING APPARATUS HAVING ONE OR MORE MAGNETIC TARGETS ANDREWS, DAVID L 3672 §103 Final Rejection — Pending Feb 25, 2025
19050284 BALL-TYPE FLOW STOPPER INCLUDING A PRESSURE ACTIVATED CANTILEVER FEATURE PATEL, NEEL G 3676 §102§112 Non-Final OA 79d Pending Feb 11, 2025
19047821 DIGITALLY RECONFIGURABLE ANALOG COMPUTATIONS FOR SOLVING OPTIMIZATION PROBLEMS NGUYEN, KHAI M 2845 DP Non-Final OA — Pending Feb 07, 2025
19042531 LAYERED TARGET FOR NEUTRON GENERATOR GARNER, LILY CRABTREE 3646 §101§102§112Other Non-Final OA — Pending Jan 31, 2025
19040059 DOWNHOLE TOOL EMPLOYING A WHIPSTOCK ASSEMBLY, PACKER ASSEMBLY AND DOWNHOLE POWER UNIT WLODARSKI, NICHOLAS NMN 3672 §102§103 Non-Final OA — Pending Jan 29, 2025
19039680 EVALUATING SUBSURFACE CONDITIONS BREIER, KRYSTINE E 3645 §102§103 Non-Final OA — Pending Jan 28, 2025
19038144 FRICTION REDUCER PERFORMANCE ANALYSIS IN WELL SYSTEMS BEMKO, TARAS P 3672 §101§102§103§112 Non-Final OA — Pending Jan 27, 2025
19033849 MULTIPLE PIPES DEFORMATION DETECTION USING ELECTROMAGNETIC TECHNIQUES MURSHED, OSAMAH 2858 §103§112 Non-Final OA — Pending Jan 22, 2025

View all 178 →

Managing Halliburton Energy Services Inc.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does Halliburton Energy Services Inc. have?

Halliburton Energy Services Inc. has 178 pending office actions as of October 2026, spread across 49 art units and 118 examiners.

Which USPTO examiner handles the most Halliburton Energy Services Inc. applications?

Neel G Patel has the most, with 6 of Halliburton Energy Services Inc.'s pending office actions.

What technology area are Halliburton Energy Services Inc.'s patent applications in?

Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month