Technology areas: Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems
174 pending office actions • 53 art units • 122 examiners • 0 of 174 (0%) have an AI response strategy ready • 533 patents granted in the last 365 days
Halliburton Energy Services Inc. has 174 pending office actions in Transportation, E-Commerce & Mechanical Systems. The portfolio spans 122 distinct examiners and 53 distinct art units, demonstrating substantial distribution across examination channels. This profile supports a coordinated prosecution program that can identify related technologies while retaining matter-specific control over amendments and arguments.
HALL, KRISTYN A is the busiest examiner, with 5 pending matters. That examiner is a meaningful focal point for preparation, but the broad examiner coverage means it cannot serve as the sole basis for portfolio strategy. Counsel can combine repeat-assignment insight with consistent technical disclosure practices and separate art-unit analysis.
Based on the USPTO statutory response window for each pending office action. 39 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 39 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 11 (6%) |
| §101 + other | 30 (17%) |
| §103 only | 48 (28%) |
| §102 only | 8 (5%) |
| §112 only | 10 (6%) |
| Double-patenting only | 1 (1%) |
| Double-patenting + other | 4 (2%) |
| Multi-statute (no §101) | 62 (36%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| HALL, KRISTYN A | 5 | 82.0% | -5.7% |
| WALLACE, KIPP CHARLES | 4 | 78.3% | +25.5% |
| BOMAR, THOMAS S | 4 | 83.1% | +0.1% |
| MACDONALD, STEVEN A | 4 | 80.5% | +12.9% |
| PATEL, NEEL G | 4 | 62.6% | +34.4% |
| ANDREWS, DAVID L | 3 | 71.6% | +16.4% |
| CARROLL, DAVID P. | 3 | 80.3% | +13.9% |
| GAY, JENNIFER HAWKINS | 3 | 85.2% | +8.5% |
| GRAY, GEORGE STERLING | 3 | 75.4% | +9.9% |
| CULLER, JILL E | 3 | 57.3% | +13.9% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19422983 | DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE | BOMAR, THOMAS S | — |
| 19423108 | DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY HAVING A WIDTH (WEM) THAT IS NO MORE THAN 200% OF A STROKE DISTANCE (D) AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE | BOMAR, THOMAS S | — |
| 19423141 | DOWNHOLE DEVICE EMPLOYING (N) ELECTROMAGNET ASSEMBLIES AND (M) FERROMAGNET ASSEMBLIES TO ACTUATE A MOVABLE FEATURE, WHEREIN (N) IS GREATER THAN (M) | CARROLL, DAVID P. | — |
| 19400023 | WHIPSTOCK FOR USE WITH A MILL BIT INCLUDING VARYING MATERIAL REMOVAL RATES | GAY, JENNIFER HAWKINS | — |
| 19379604 | FLOW CONTROL VALVE EMPLOYING AT LEAST A 1.5 KSI PRESSURE DIFFERENTIAL | MACDONALD, STEVEN A | — |
| 19379591 | FLOW CONTROL VALVE EMPLOYING AN ELECTRIC ACTUATOR AND METAL-TO-METAL SEAL | MACDONALD, STEVEN A | — |
| 19379641 | FLOW CONTROL VALVE EMPLOYING FIRST AND SECOND SEPARATELY OPERABLE ACTUATORS | CARROLL, DAVID P. | — |
| 19347217 | MODULAR POLYMER COMPOSITE LIFT TUBE IN A WELLBORE | BOMAR, THOMAS S | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17831192 | COUPLINGS AND COUPLING SYSTEMS | BINDA, GREGORY JOHN | 145d overdue |
| 18492915 | LONG-TERM TREND ANALYSIS FOR EQUIPMENT FOR WELL SYSTEMS | WORKU, KIDEST | 53d overdue |
| 17944818 | DESIGNING SMART ENVIRONMENTAL EFFICIENCY FLUIDS | COCCHI, MICHAEL EDWARD | 36d overdue |
| 18508813 | MULTI-SENSOR DOWNHOLE GAUGE | FULLER, ROBERT EDWARD | 22d overdue |
| 18807707 | STEERABILITY OF DOWNHOLE RANGING TOOLS USING ROTARY MAGNETS | WLODARSKI, NICHOLAS NMN | 18d overdue |
| 18494395 | SEALING ASSEMBLY EMPLOYING A CYLINDRICAL EXTRUSION LIMITER | ANDREWS, DAVID L | 8d overdue |
| 18241176 | METHODS TO PERFORM NUCLEAR MAGNETIC RESONANCE MEASUREMENTS, AND NUCLEAR MAGNETIC RESONANCE TOOLS | CLARKE, ADAM S | 3d overdue |
| 18481734 | DOWNHOLE TOOL INCLUDING A PACKER ASSEMBLY, A COMPLETION ASSEMBLY, AND A FIXEDLY COUPLED WHIPSTOCK ASSEMBLY | CRAIG, DANIEL THOMAS | 9d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18494395 | SEALING ASSEMBLY EMPLOYING A CYLINDRICAL EXTRUSION LIMITER | ANDREWS, DAVID L | 8d overdue |
| 18365000 | CUTTINGS MAGNETIC SUSCEPTIBILITY AND ASSOCIATED DEVICE | CULLER, JILL E | 28d |
| 18829715 | SPRING ASSEMBLY INCLUDING TWO SEPARATE INDEPENDENT WAVE SPRINGS | PATEL, NEEL G | 41d |
| 19546048 | SONDE CENTRALIZATION INSIDE A COLLAR | WALLACE, KIPP CHARLES | — |
| 19546026 | SONDE CENTRALIZATION INSIDE A COLLAR | WALLACE, KIPP CHARLES | — |
| 19542300 | DOWNHOLE ELECTRICAL CONDUCTOR MOVEMENT ARRESTOR | ANDREWS, DAVID L | — |
| 19536486 | DEVICES, SYSTEMS, AND METHODS FOR WELLBORE OPERATIONS | CARROLL, DAVID P. | — |
| 19423141 | DOWNHOLE DEVICE EMPLOYING (N) ELECTROMAGNET ASSEMBLIES AND (M) FERROMAGNET ASSEMBLIES TO ACTUATE A MOVABLE FEATURE, WHEREIN (N) IS GREATER THAN (M) | CARROLL, DAVID P. | — |
| Art Unit | Apps |
|---|---|
| 3676 | 30 |
| 2857 | 22 |
| 3674 | 21 |
| 3672 | 16 |
| 2188 | 7 |
| 2853 | 5 |
| 2858 | 5 |
| 2855 | 4 |
| 2688 | 4 |
| 2119 | 4 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19631712 | DOWNHOLE TOOL INCLUDING A SACRIFICIAL CONDUCTIVE PROTECTION LAYER POSITIONED ABOUT A MATERIAL TO BE PROTECTED | STEPHENSON, DANIEL P | 3676 | §102§103 | Non-Final OA | — | Pending | Mar 27, 2026 |
| 19546048 | SONDE CENTRALIZATION INSIDE A COLLAR | WALLACE, KIPP CHARLES | 3674 | §102§103 | Non-Final OA | — | Pending | Feb 20, 2026 |
| 19546026 | SONDE CENTRALIZATION INSIDE A COLLAR | WALLACE, KIPP CHARLES | 3674 | §102§103Other | Non-Final OA | — | Pending | Feb 20, 2026 |
| 19543603 | FORMATION FLUID SAMPLING USING PROBE WITH INFLATABLE PAD | BOMAR, THOMAS S | 3674 | §102§103 | Non-Final OA | — | Pending | Feb 18, 2026 |
| 19542300 | DOWNHOLE ELECTRICAL CONDUCTOR MOVEMENT ARRESTOR | ANDREWS, DAVID L | 3672 | §102§103§112 | Non-Final OA | — | Pending | Feb 17, 2026 |
| 19536486 | DEVICES, SYSTEMS, AND METHODS FOR WELLBORE OPERATIONS | CARROLL, DAVID P. | 3674 | §103§112 | Non-Final OA | — | Pending | Feb 11, 2026 |
| 19422983 | DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE | BOMAR, THOMAS S | 3674 | §102Other | Non-Final OA | — | Pending | Dec 17, 2025 |
| 19423108 | DOWNHOLE DEVICE EMPLOYING AN ELECTROMAGNET ASSEMBLY HAVING A WIDTH (WEM) THAT IS NO MORE THAN 200% OF A STROKE DISTANCE (D) AND FERROMAGNET ASSEMBLY TO ACTUATE A MOVABLE FEATURE | BOMAR, THOMAS S | 3674 | §102Other | Non-Final OA | — | Pending | Dec 17, 2025 |
| 19423141 | DOWNHOLE DEVICE EMPLOYING (N) ELECTROMAGNET ASSEMBLIES AND (M) FERROMAGNET ASSEMBLIES TO ACTUATE A MOVABLE FEATURE, WHEREIN (N) IS GREATER THAN (M) | CARROLL, DAVID P. | 3674 | §112Other | Non-Final OA | — | Pending | Dec 17, 2025 |
| 19407655 | EXPANDABLE METAL SLIP RING FOR USE WITH A SEALING ASSEMBLY | GAY, JENNIFER HAWKINS | 3619 | §101§103§112 | Non-Final OA | — | Pending | Dec 03, 2025 |
| 19406805 | MONITORING CEMENT INTEGRITY FOR HYDROGEN LEAKAGE | GAY, JENNIFER HAWKINS | 3619 | §102§103§112 | Non-Final OA | — | Pending | Dec 02, 2025 |
| 19400023 | WHIPSTOCK FOR USE WITH A MILL BIT INCLUDING VARYING MATERIAL REMOVAL RATES | GAY, JENNIFER HAWKINS | 3619 | §102§103DP | Non-Final OA | — | Pending | Nov 25, 2025 |
| 19388734 | MILLING ASSEMBLY FOR DRILLING A MULTILATERAL WELLBORE | WALLACE, KIPP CHARLES | 3674 | §103 | Non-Final OA | — | Pending | Nov 13, 2025 |
| 19384757 | SUMMARY OF DRILLING AND OPERATION REPORTS BASED ON A USER PROMPT | ALAM, SHAHID AL | 2161 | §101§103 | Non-Final OA | — | Pending | Nov 10, 2025 |
| 19379604 | FLOW CONTROL VALVE EMPLOYING AT LEAST A 1.5 KSI PRESSURE DIFFERENTIAL | MACDONALD, STEVEN A | 3674 | §103 | Non-Final OA | — | Pending | Nov 04, 2025 |
| 19379591 | FLOW CONTROL VALVE EMPLOYING AN ELECTRIC ACTUATOR AND METAL-TO-METAL SEAL | MACDONALD, STEVEN A | 3674 | §103 | Non-Final OA | — | Pending | Nov 04, 2025 |
| 19379641 | FLOW CONTROL VALVE EMPLOYING FIRST AND SECOND SEPARATELY OPERABLE ACTUATORS | CARROLL, DAVID P. | 3674 | §103DP | Non-Final OA | — | Pending | Nov 04, 2025 |
| 19358048 | OFFSET WELL ANALYSIS FOR DERIVING NEXT WELL DRILLING PARAMETERS | NORRIS, URSULA LEE | 3676 | §103§112 | Non-Final OA | — | Pending | Oct 14, 2025 |
| 19347217 | MODULAR POLYMER COMPOSITE LIFT TUBE IN A WELLBORE | BOMAR, THOMAS S | 3674 | §103 | Non-Final OA | — | Pending | Oct 01, 2025 |
| 19339850 | METHOD TO REDUCE PEAK TREATMENT CONSTITUENTS IN SIMULTANEOUS TREATMENT OF MULTIPLE WELLS | WOOD, DOUGLAS S | 3672 | §101§102§112Other | Non-Final OA | — | Pending | Sep 25, 2025 |
| 19317582 | A DOWNHOLE TOOL EMPLOYING A PRESSURE INTENSIFIER | ANDREWS, DAVID L | 3672 | §102§112Other | Non-Final OA | — | Pending | Sep 03, 2025 |
| 19316903 | VOLUMETRIC COMPENSATION FOR SEALING PERFORMANCE UNDER LARGE TEMPERATURE SWING CONDITIONS | GRAY, GEORGE STERLING | 3676 | §103§112 | Non-Final OA | — | Pending | Sep 02, 2025 |
| 19306927 | OPEN HOLE GRAVEL PACK SYSTEM FOR MANAGED PRESSURE DRILLING (MPD) APPLICATIONS | STEPHENSON, DANIEL P | 3676 | §103 | Final Rejection | — | Pending | Aug 21, 2025 |
| 19286911 | WELLBORE EXCLUSION FLUID METHOD AND APPARATUS FOR DOWNHOLE LOGGING | CULLER, JILL E | 2853 | §102 | Non-Final OA | — | Pending | Jul 31, 2025 |
| 19149001 | COMPLETIONS-BASED WELL CLEANOUT USING MAGNETIC CLEANOUT TOOL | MICHENER, BLAKE E | 3676 | §102§103§112 | Final Rejection | — | Pending | Jul 17, 2025 |
| 19240304 | ACTUATOR WITH MOVABLE CYLINDER FOR ROTARY STEERABLE SYSTEM | WALLACE, KIPP CHARLES | 3674 | §102§103 | Final Rejection | — | Pending | Jun 17, 2025 |
| 19233124 | HEATERS TO ACCELERATE SETTING OF EXPANDABLE METAL | YAO, THEODORE N | 3676 | §103§112 | Final Rejection | — | Pending | Jun 10, 2025 |
| 19232491 | VOLTAGE TO ACCELERATE/DECELERATE EXPANDABLE METAL | YAO, THEODORE N | 3676 | §102§103§112 | Final Rejection | 26d | Pending | Jun 09, 2025 |
| 19215695 | DOWNHOLE TOOL INCLUDING RELATED LUG SLOTS AND LUGS FOR COUPLING A MILLING TOOL AND WHIPSTOCK ASSEMBLY | THOMPSON, KENNETH L | 3676 | §102 | Final Rejection | 25d overdue | Pending | May 22, 2025 |
| 19210156 | DOWNHOLE TOOL WITH CRACK COMPLIANT SEAL AND HIGH YIELD STRENGTH WELD POSITIONED AT A JOINT THEREOF | MACDONALD, STEVEN A | 3674 | §103 | Final Rejection | — | Pending | May 16, 2025 |
| 19210530 | METHOD FOR PLACING NON-REACTIVE COLLOID PARTICLES TO STOP GAS MIGRATION IN EXPANDABLE METAL APPLICATIONS | SUE-AKO, ANDREW B. | 3674 | §112 | Final Rejection | — | Pending | May 16, 2025 |
| 19210415 | NON-REACTIVE COLLOID PARTICLES TO STOP GAS MIGRATION IN EXPANDABLE METAL APPLICATIONS | SUE-AKO, ANDREW B. | 3674 | §112 | Final Rejection | 26d | Pending | May 16, 2025 |
| 19210820 | TWO-PART DRILLING AND RUNNING TOOL INCLUDING A ONE WAY MECHANISM | THOMPSON, KENNETH L | 3676 | §102 | Final Rejection | 25d overdue | Pending | May 16, 2025 |
| 19210231 | DOWNHOLE TOOL WITH CRACK COMPLIANT SEAL AND MECHANICAL STRENGTHENING FEATURE AT A JOINT THEREOF | MACDONALD, STEVEN A | 3674 | §103 | Final Rejection | — | Pending | May 16, 2025 |
| 19205002 | TWO-PART DRILLING AND RUNNING TOOL | HALL, KRISTYN A | 3672 | §103 | Final Rejection | — | Pending | May 12, 2025 |
| 19202467 | INTERNAL SLIP DESIGN WITH MINIMUM BACKLASH FOR PACKERS SEAL ENHANCEMENT | LOIKITH, CATHERINE A | 3674 | §101§102§103Other | Non-Final OA | — | Pending | May 08, 2025 |
| 19198323 | ESTIMATION OF ROCK ABRASIVENESS AND ROCK STRENGTH USING BIT RESPONSE DATA | HALL, KRISTYN A | 3672 | §101 | Non-Final OA | — | Pending | May 05, 2025 |
| 19198377 | CUTTER FORCES AND WEAR SEVERITY DETERMINATION FOR A DRILL BIT FOR DRILLING A WELLBORE | HALL, KRISTYN A | 3672 | §101§103§112 | Non-Final OA | 33d | Pending | May 05, 2025 |
| 19197239 | COIL OF REFERENCE FIBER FOR DOWNHOLE FIBER SENSING MEASUREMENT | JAGAN, MIRELLYS | 2855 | §102§103§112 | Non-Final OA | — | Pending | May 02, 2025 |
| 19191425 | WELLBORE SERVICES SYSTEM WITH ANYTIME ACCESS FOR PUMP MAINTENANCE | FULLER, ROBERT EDWARD | 3676 | §103 | Non-Final OA | 9d | Pending | Apr 28, 2025 |
| 19191825 | CRYOGENIC COOLANT FLOW MANAGEMENT FOR DOWNHOLE SUPERCONDUCTING CABLE | WLODARSKI, NICHOLAS NMN | 3672 | §103§112Other | Final Rejection | — | Pending | Apr 28, 2025 |
| 19187505 | DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A SIGNAL NOISE SOURCE POWERED BY A DOWNHOLE POWER SOURCE, THE SENSOR CONFIGURED TO SENSE FOR NOISE AND SEND UPHOLE OPERATIONAL DATA EMBEDDED WITHIN THE NOISE | AKARAGWE, YANICK A | 3672 | §103 | Final Rejection | 28d overdue | Pending | Apr 23, 2025 |
| 19187195 | DOWNHOLE TOOL, WELL SYSTEM, AND METHOD EMPLOYING A SENSOR POSITIONED PROXIMATE A FLOW CONTROL DEVICE, THE SENSOR CONFIGURED TO SENSE FOR A CHANGE IN NOISE EMANATING FROM THE FLOW CONTROL DEVICE | JELLETT, MATTHEW WILLIAM | 3753 | §103§112 | Non-Final OA | — | Pending | Apr 23, 2025 |
| 19071168 | COILED TUBING DEPLOYMENT/RETRIEVAL APPARATUS EMPLOYING MULTIPLE TUBING GUIDES AND A METHOD OF USE THEREOF | BUCK, MATTHEW R | 3672 | §102§103 | Non-Final OA | — | Pending | Mar 05, 2025 |
| 19063643 | MOTION HYPERPARAMETER CORRELATION AND SELECTION FOR NUCLEAR MAGNETIC RESONANCE (NMR) MOTION CORRECTION IN WELL SYSTEMS | PATEL, RISHI R | 2858 | §112 | Non-Final OA | — | Pending | Feb 26, 2025 |
| 19047821 | DIGITALLY RECONFIGURABLE ANALOG COMPUTATIONS FOR SOLVING OPTIMIZATION PROBLEMS | NGUYEN, KHAI M | 2845 | DP | Non-Final OA | — | Pending | Feb 07, 2025 |
| 19042531 | LAYERED TARGET FOR NEUTRON GENERATOR | GARNER, LILY CRABTREE | 3646 | §101§102§112Other | Non-Final OA | — | Pending | Jan 31, 2025 |
| 19041902 | RAPID ROCK PETROPHYSICAL QUALITY ANALYSIS WITH ELASTOMERIC SENSOR BASED IMAGES | SOFRONIOU, MICHAEL MARIO | 2661 | §103 | Non-Final OA | — | Pending | Jan 30, 2025 |
| 19041571 | METHOD AND APPARATUS FOR MAKING IMAGING MEASUREMENTS OF A FORMATION CORE | HAWKINS, DOMINIC E | 2858 | §103 | Non-Final OA | — | Pending | Jan 30, 2025 |
| 19040059 | DOWNHOLE TOOL EMPLOYING A WHIPSTOCK ASSEMBLY, PACKER ASSEMBLY AND DOWNHOLE POWER UNIT | WLODARSKI, NICHOLAS NMN | 3672 | §102§103 | Non-Final OA | — | Pending | Jan 29, 2025 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialHalliburton Energy Services Inc. has 174 pending office actions as of November 2026, spread across 53 art units and 122 examiners.
Kristyn A Hall has the most, with 5 of Halliburton Energy Services Inc.'s pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.