Listed by the USPTO as HERNANDEZ, MANUEL J
Tech Center 2800 • Art Units: 2835 2858 2859
This examiner grants 49% of resolved cases
HERNANDEZ, MANUEL J has resolved 687 cases in tech center 2800 and art unit 2835. The allowance rate is 49.3%, and the interview lift is 44.2%. The median time to allowance is 1283 days. The figures describe a demanding prosecution profile in which interviews are associated with a substantial lift and allowance may require sustained effort.
Toyota Motor Corporation, Ads-Tec Energy GmbH, and MILWAUKEE ELECTRIC TOOL Corporation are the leading companies. CARTER, DELUCA & FARRELL LLP, MICHAEL BEST & FRIEDRICH LLP (Mke), and Sheridan Ross PC are the listed firms. Practitioners may wish to emphasize interview preparation and durable claim strategy for matters in this portfolio.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18704032 | Smart Power Tool Battery Charger Based on a Charging State | Non-Final OA | Milwaukee Electric Tool Corporation |
| 18474409 | PORTABLE CHARGING STATION | Non-Final OA | MILWAUKEE ELECTRIC TOOL CORPORATION |
| 18306089 | ROBOTIC TOOL AND CHARGING STATION | Non-Final OA | TECHTRONIC CORDLESS GP |
| 18345953 | POWER SUPPLY MAT, POWER SUPPLY VEHICLE, AND NONCONTACT POWER SUPPLY SYSTEM | Final Rejection | TOYOTA JIDOSHA KABUSHIKI KAISHA |
| 17987919 | CHARGING SYSTEM, SAFETY MANAGEMENT PROGRAM FOR CHARGING SYSTEM AND SAFETY MANAGEMENT METHOD FOR CHARGING SYSTEM INCLUDING CHARGING CABLE PREDETERMINED SAFETY CONDITIONS | Final Rejection | TOYOTA JIDOSHA KABUSHIKI KAISHA |
| 17590431 | TIMER CHARGE SETTING TEMPORARY CANCELLATION | Non-Final OA | TOYOTA MOTOR ENGINEERING & MANUFACTURING NORTH AMERICA, INC. |
| 18097475 | MANAGING AVAILABILITY OF LIMITED CHARGING STATIONS | Non-Final OA | TOYOTA MOTOR NORTH AMERICA, INC. |
| 17932969 | INTELLIGENT BATTERY CELL SYSTEM INCLUDING SELECTIVELY DISTRIBUTING RESPONSIBILITY FOR FEEDBACK CONTROL | Non-Final OA | Volvo Car Corporation |
| 17919274 | WEARABLE DEVICE AND WEARABLE SYSTEM INCLUDING A FIRST COIL AND A MAGNETIC ISOLATION SHEET | Final Rejection | HONOR DEVICE CO., LTD. |
| 18187955 | PULSE CURRENT PARALLEL CHARGER | Final Rejection | QUALCOMM Incorporated |
| 18548353 | METHOD FOR CHARGING SECONDARY BATTERY | Non-Final OA | SEMICONDUCTOR ENERGY LABORATORY CO., LTD. |
| 18049387 | CHARGING SYSTEM AND CHARGING STATION INCLUDING REDUCING A FUTURE ELECTRIC POWER CHARGE AMOUNT FOR SOME VEHICLES TO BE ALLOCATED TO A VEHICLE REQUESTING EARLY START OF CHARGING | Final Rejection | IHI CORPORATION |
| 17322696 | METHOD AND SYSTEM FOR QUANTITATIVE ENERGY VERIFICATION OF AN ELECTRIC CHARGING PROCESS AND SERVER DEVICE FOR THE SYSTEM | Final Rejection | AUDI AG |
| 18344469 | SMART ELECTRIC CHARGING SCHEDULER FOR ELECTRIC VEHICLES | Final Rejection | International Business Machines Corporation |
| 17405674 | ELECTRIC VEHICLE SUPPLY EQUIPMENT DETECTION AND MANAGEMENT VIA CONTROL PILOT SIGNAL | Final Rejection | Ford Global Technologies, LLC |
| 18338256 | STORAGE BATTERY CONTROL DEVICE, POWER STORAGE SYSTEM, AND STORAGE BATTERY CONTROL METHOD | Final Rejection | YAZAKI CORPORATION |
| 18299350 | ADAPTATION OF ELECTRIC VEHICLE CHARGING COMMUNICATION PARAMETERS | Non-Final OA | GM GLOBAL TECHNOLOGY OPERATIONS LLC |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy49.3% of resolved applications examined by Manuel J Hernandez were allowed (687 resolved cases), compared with 56.2% across Art Unit 2835 over the last five years.
This examiner's interview lift is +44.2 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Manuel J Hernandez took 1,283 days on average from filing to allowance.
Manuel J Hernandez examines applications in Art Unit 2835 in Tech Center 2800 (Semiconductors, Circuits & Optics).