Listed by the USPTO as MAGAR, DIL KUMAR
Tech Center 3600 • Art Units: 2688 3675 3677 3678
This examiner grants 56% of resolved cases
| App # | Title | Status | Assignee |
|---|---|---|---|
| 19103687 | INSTRUMENTED ASSEMBLY SCREW | Non-Final OA | SAFRAN AIRCRAFT ENGINES |
| 17412916 | BLIND FASTENERS | Final Rejection | AIRBUS OPERATIONS LIMITED |
| 16794332 | CAST-IN PLACE ANCHOR WITH MULTI-USE JAWS AND REMOVABLE NOSE-PIECE | Final Rejection | BLACK & DECKER INC. |
| 18137218 | Compression Limiter | Non-Final OA | Illinois Tool Works Inc. |
| 17705652 | Fastener with Integral Seal | Final Rejection | Illinois Tool Works Inc. |
| 17456319 | COUPLING ASSEMBLY INCLUDING A SCRIVET FASTENER | Non-Final OA | THE BOEING COMPANY |
| 18175647 | ORTHOPEDIC BONE FASTENERS | Non-Final OA | GLOBUS MEDICAL, INC. |
| 18285804 | SYSTEM FOR FASTENING STRUCTURES TO A VEHICLE | Final Rejection | Caterpillar SARL |
| 18860306 | HOLLOW STRUCTURE ANCHOR | Non-Final OA | Siemens Aktiengesellschaft |
| 18428113 | Fastener With Polygonal Counterbore Cutters | Non-Final OA | OMG Building Products LLC |
| 17786026 | ANCHOR ASSEMBLY | Final Rejection | THREE SMITH GROUP LIMITED |
| 18716367 | FASTENING SYSTEM AND METHOD FOR MOUNTING IN A SUBSTRATE | Non-Final OA | EJOT SE & Co. KG |
| 18577223 | SPACING FASTENER | Final Rejection | EJOT SE & Co. KG |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy56.3% of resolved applications examined by Dil Kumar Magar were allowed (96 resolved cases), compared with 70.3% across Art Unit 2688 over the last five years.
This examiner's interview lift is +15.8 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Dil Kumar Magar took 1,233 days on average from filing to allowance.
Dil Kumar Magar examines applications in Art Unit 2688 in Tech Center 3600 (Transportation, E-Commerce & Mechanical Systems).