Technology areas: Chemistry & Materials • Transportation, E-Commerce & Mechanical Systems
208 pending office actions • 111 art units • 189 examiners • 0 of 208 (0%) have an AI response strategy ready • 751 patents granted in the last 365 days
The Boeing Company has 217 pending office actions in Transportation, E-Commerce & Mechanical Systems. The docket spans 198 distinct examiners and 115 distinct art units, creating broad distribution across the examination organization. The difference between examiner and art-unit coverage indicates that some art units contain matters handled by more than one examiner.
PAGE, HANA C is the busiest examiner, with 4 pending matters. That concentration is limited relative to the overall docket, so prosecution management likely requires portfolio-level coordination rather than reliance on a small number of examiner relationships. The art-unit spread also supports using technology-specific issue tracking alongside individual matter review.
Based on the USPTO statutory response window for each pending office action. 49 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 49 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 11 (5%) |
| §101 + other | 32 (15%) |
| §103 only | 68 (33%) |
| §102 only | 8 (4%) |
| §112 only | 8 (4%) |
| Double-patenting only | 2 (1%) |
| Double-patenting + other | 3 (1%) |
| Multi-statute (no §101) | 75 (36%) |
| No statute on record | 1 (0%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| PAGE, HANA C | 4 | 60.3% | +32.7% |
| YOO, REGINA M | 3 | 63.8% | +5.8% |
| TROCHE, EDGAREDMANUE | 2 | 58.0% | +34.5% |
| YANKEY, RYAN ANDREW | 2 | 77.8% | +14.3% |
| RIVERA-MARTINEZ, GUILLERMO M | 2 | 78.1% | +3.2% |
| SANTOS, AARRON EDUARDO | 2 | 45.6% | +16.8% |
| BROSH, BENJAMIN J | 2 | 71.3% | +27.2% |
| SCHATZ, CHRISTOPHER T | 2 | 62.6% | +27.3% |
| MARUNDA II, TORRENCE S | 2 | 25.8% | +30.5% |
| JONES, GORDON A | 2 | 60.8% | +38.6% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18528391 | ELECTROPHORETIC CAPSULES ENABLING BLOCKING OF VISIBLE AND NON-VISIBLE WAVELENGTHS | NGUYEN, DUNG T | 86d overdue |
| 17541137 | MACHINE LEARNING BASED FASTENER DESIGN | MIRABITO, MICHAEL PAUL | 49d overdue |
| 18741088 | Thrust Reverser Mounting Assembly | HARRINGTON, ALYSON JOAN | 45d overdue |
| 17660276 | TOOLS AND METHODS FOR FORMING A HOLE WITH COUNTERSINK IN STACKED COMPONENTS | SNYDER, ALAN W | 38d overdue |
| 17352075 | COLLISION AVOIDANCE BASED ON CENTRALIZED COORDINATION OF VEHICLE OPERATIONS | SANTOS, AARRON EDUARDO | 16d overdue |
| 18354274 | SYSTEM AND METHOD FOR OPTIMIZING AIRPORT OPERATIONS | GILLS, KURTIS | 15d overdue |
| 18467547 | INTERACTIVE VISUALIZATION OF PREDICTED INFORMATION ALONG ACTIVE FLIGHT PATH ON NAVIGATION DISPLAYS | INSERRA, MADISON RENEE | 8d overdue |
| 18655761 | SYSTEMS AND METHODS FOR CURING COMPOSITE STRUCTURES | SCHATZ, CHRISTOPHER T | 3d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17352075 | COLLISION AVOIDANCE BASED ON CENTRALIZED COORDINATION OF VEHICLE OPERATIONS | SANTOS, AARRON EDUARDO | 16d overdue |
| 18655761 | SYSTEMS AND METHODS FOR CURING COMPOSITE STRUCTURES | SCHATZ, CHRISTOPHER T | 3d overdue |
| 18892800 | CERAMIC MATRIX COMPOSITE STRUCTURES AND METHODS FOR MANUFACTURE THEREOF | TROCHE, EDGAREDMANUE | 12d |
| 18787509 | SPACE-BASED MONITORING OF AIRCRAFT | SANTOS, AARRON EDUARDO | 27d |
| 18491222 | Double Vacuum Debulk Processing | SCHATZ, CHRISTOPHER T | 29d |
| 18460420 | SYSTEMS AND METHODS FOR MANUFACTURING STIFFENED COMPOSITE STRUCTURES | PAGE, HANA C | 41d |
| 18314948 | TOOLING SETS, SYSTEMS AND METHODS FOR STAMP FORMING A WORKPIECE | PAGE, HANA C | 41d |
| 18301066 | THERMAL CONTROL SYSTEMS FOR REDUCING ICE FORMATION | JONES, GORDON A | 56d |
| Art Unit | Apps |
|---|---|
| 3663 | 8 |
| 3642 | 7 |
| 1758 | 7 |
| 1745 | 6 |
| 3669 | 5 |
| 3675 | 5 |
| 2187 | 5 |
| 3629 | 4 |
| 3665 | 4 |
| 3666 | 4 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19423726 | METHODS AND APPARATUS TO REPAIR COMPOSITE AIRFOIL STRUCTURES | HOLLY, LEE A | 3726 | §102§103 | Non-Final OA | — | Pending | Dec 17, 2025 |
| 19422030 | APPARATUS AND METHODS FOR TRANSONIC TRUSS-BRACED WING AIRCRAFT | KREINER, MICHAEL B | 3642 | §102 | Non-Final OA | — | Pending | Dec 16, 2025 |
| 19348336 | DETERMINING MAINTENANCE INTERVALS USING A COMBINATION OF MODELS | SITTNER, MATTHEW T | 3629 | §101§103 | Non-Final OA | — | Pending | Oct 02, 2025 |
| 19339588 | Scheduled Maintenance Credit User Interface | BRUSHABER, FREDERICK M | 3665 | §101§102§103 | Non-Final OA | — | Pending | Sep 25, 2025 |
| 19311414 | IDENTITY AND ACCESS MANAGEMENT USING A DECENTRALIZED GATEWAY COMPUTING SYSTEM | POPHAM, JEFFREY D | 2432 | §103§112Other | Non-Final OA | — | Pending | Aug 27, 2025 |
| 19277219 | APPARATUSES COMPRSING SEAL COMPONENTS AND METHODS COMPRISING SEAL COMPONENTS | CARY, KELSEY E | 3753 | §103§112 | Non-Final OA | — | Pending | Jul 22, 2025 |
| 19275810 | SYSTEM, METHOD, AND APPARATUS FOR MINIMIZING AIRCRAFT CRUISE OPERATIONAL COSTS | RAMESH, KRISHNAN | 3663 | §102§103 | Non-Final OA | — | Pending | Jul 21, 2025 |
| 19269665 | SYSTEM AND METHOD FOR TAXIING OPERATIONS IN MULTI-ENGINE AIRCRAFT | KHATIB, RAMI | 3669 | §101Other | Non-Final OA | — | Pending | Jul 15, 2025 |
| 19244705 | METHOD OF FORMING A COMPOSITE PREFORM | SULTANA, NAHIDA | 1743 | §102 | Non-Final OA | — | Pending | Jun 20, 2025 |
| 19234450 | EMERGENCY OXYGEN SYSTEMS FOR INTERNAL CABINS OF AIRCRAFT | GORDON, ANNA L | 3642 | §103 | Final Rejection | — | Pending | Jun 11, 2025 |
| 19222113 | Transfer Assembly to Transfer Mechanical Power During Operation of a Turbine Engine | SUNG, GERALD LUTHER | 3741 | §103 | Non-Final OA | — | Pending | May 29, 2025 |
| 19197085 | MACHINE AND PROCESS FOR VEHICLE TRAJECTORY CONTROL | GORDON, MATHEW FRANKLIN | 3665 | §102§103 | Final Rejection | — | Pending | May 02, 2025 |
| 19184254 | APPARATUS AND METHOD FOR MANUFACTURING A COMPOSITE PART TO PROVIDE SMOOTH JOIN SURFACES OF THE COMPOSITE PART | GROSSO, GREGORY CHAD | 1748 | §102§103 | Non-Final OA | — | Pending | Apr 21, 2025 |
| 19097025 | MISSION MANAGEMENT SYSTEM ARCHITECTURE | NGUYEN, THUY-VI THI | 3656 | §102 | Final Rejection | — | Pending | Apr 01, 2025 |
| 19088398 | SYSTEM AND METHOD FOR MONITORING AND CONTROLLING AUTONOMOUS SYSTEM OPERATIONS | INGRAM, THOMAS P | 3668 | §102 | Non-Final OA | — | Pending | Mar 24, 2025 |
| 19081696 | COMPUTING DEVICE AND METHOD FOR TRACKING MOVEMENT OF OBJECTS | MUELLER, SARAH ALEXANDRA | 3669 | §102§103Other | Non-Final OA | — | Pending | Mar 17, 2025 |
| 19075998 | Inspection Reliability Evaluation System | BAINS, SARJIT S | 3623 | §101§102§103 | Non-Final OA | — | Pending | Mar 11, 2025 |
| 19068240 | SYSTEMS AND METHODS FOR AUTOMATICALLY HYPERLINKING TECHNICAL DOCUMENTATION FOR WORK INSTRUCTIONS | HATCH, ANGELA MAIDA | 3626 | §101§103 | Final Rejection | — | Pending | Mar 03, 2025 |
| 19068166 | SYSTEMS AND METHODS FOR DETERMINING BORE CHARACTERISTICS OF A HOLE | LUU, THANH X | 2878 | §102§103 | Non-Final OA | — | Pending | Mar 03, 2025 |
| 19062573 | Cargo Monitoring Using a Three-Dimensional Vision System | SAFAIPOUR, BOBBAK | 2665 | §103 | Non-Final OA | — | Pending | Feb 25, 2025 |
| 19058819 | Automatic Tray Table Disinfection for Tray Tables in an Aircraft | CHEN, JOSE V | 3637 | §102§103 | Non-Final OA | — | Pending | Feb 20, 2025 |
| 19048728 | MEASURING FEATURES ON A PART UTILIZING DEPTH DATA | DESIRE, GREGORY M | 2676 | §102§103 | Non-Final OA | — | Pending | Feb 07, 2025 |
| 19048599 | SYSTEMS AND METHODS FOR VALIDATING REAL-TIME CONTROL OF AUTONOMOUS VEHICLES | MERINO, JOHN CHIANG | 3669 | §101§102§103§112 | Non-Final OA | — | Pending | Feb 07, 2025 |
| 19048734 | SCANNER SYSTEM FOR AUTOMATED MEASUREMENTS OF PARTS | ROMANO, ASHLEY K | 3652 | §102§103 | Non-Final OA | — | Pending | Feb 07, 2025 |
| 19048706 | SOLAR CELLS HAVING THERMALLY CONDUCTIVE MULTILAYERED STRUCTURES | CANNON, RYAN SMITH | 1726 | §103§112 | Non-Final OA | — | Pending | Feb 07, 2025 |
| 19036322 | Sustainability Assessment Tool | MAZUMDER, TAPAS | 2615 | §103 | Non-Final OA | — | Pending | Jan 24, 2025 |
| 19036852 | BEACON DETECTION SYSTEM | SHUI, MING | 2663 | §102 | Non-Final OA | — | Pending | Jan 24, 2025 |
| 19027428 | SYSTEMS AND METHODS FOR PROCESSING MATERIALS USING EXPANDABLE TOOLING | HUSON, MONICA ANNE | 1742 | §112 | Non-Final OA | — | Pending | Jan 17, 2025 |
| 19027851 | PORTABLE FABRICATION SYSTEMS AND METHODS USING EXPANDABLE TOOLING | NGUON, VIRAK | 1741 | §102§103 | Non-Final OA | — | Pending | Jan 17, 2025 |
| 19016138 | REAL TIME MULTIPLE AGENT ENGAGEMENT DECISION SYSTEM | MINOR, AYANNA YVETTE | 3624 | §101 | Final Rejection | — | Pending | Jan 10, 2025 |
| 19003785 | ELASTOMER COMPONENTS AND APPARATUSES AND METHODS COMPRISING ELASTOMER COMPONENTS | COLLISTER, ELIZABETH A | 1784 | §102§103 | Non-Final OA | — | Pending | Dec 27, 2024 |
| 18962288 | METHODS OF MODELING AVIATION SUSTAINABILITY STRATEGIES | SENSENIG, SHAUN D | 3629 | §101§103 | Final Rejection | — | Pending | Nov 27, 2024 |
| 18961104 | MULTI-AGENT ARTIFICIAL INTELLIGENCE SYSTEM FOR TECHNICAL PUBLICATION AND MAINTENANCE HISTORY RETRIEVAL | REN, ZHUBING | 2658 | §101§103 | Final Rejection | — | Pending | Nov 26, 2024 |
| 18958447 | Aircraft Monitoring Using Sensed Motion and Predictive Motion | WANG, JINGLI | 3666 | §103 | Non-Final OA | — | Pending | Nov 25, 2024 |
| 18956708 | SYSTEMS AND METHODS FOR NON-DESTRUCTIVELY INSPECTING COMPONENTS | TROOST, AARON L | 3666 | §102§103 | Final Rejection | — | Pending | Nov 22, 2024 |
| 18956580 | SYSTEMS AND METHODS FOR DETERMINING WEATHER CONDITIONS WITHIN AN AIRSPACE | BEDEWI, RAMI NABIH | 3666 | §101§103 | Non-Final OA | — | Pending | Nov 22, 2024 |
| 18949388 | TEMPORALLY CONSISTENT POSITION ESTIMATION REFINEMENT FOR AERIAL REFUELING | AHMED, SAMIR ANWAR | 2665 | §102§103§112DP | Non-Final OA | — | Pending | Nov 15, 2024 |
| 18948164 | DETERMINING A CURRENT POSE ESTIMATE OF AN AIRCRAFT RELATIVE TO A RUNWAY TO SUPPORT THE AIRCRAFT ON APPROACH | HONG, DUNG | 2643 | DP | Non-Final OA | — | Pending | Nov 14, 2024 |
| 18936280 | OVER-PRESSURE VENT SYSTEM FOR AN AIRCRAFT FUEL TANK | ARUNDALE, ROBERT K | 3753 | §112 | Non-Final OA | 19d | Pending | Nov 04, 2024 |
| 18923319 | PRESCRIPTIVE ALERTING FOR AIRCRAFT COMPONENT FAULT PREDICTIONS | SLOWIK, ELIZABETH J | 3662 | §101§103 | Final Rejection | — | Pending | Oct 22, 2024 |
| 18919992 | TAIL-ROTOR VIBRATION DAMPENER SYSTEM | OSTERHOUT, SHELLEY MARIE | 3669 | §103§112 | Non-Final OA | — | Pending | Oct 18, 2024 |
| 18892800 | CERAMIC MATRIX COMPOSITE STRUCTURES AND METHODS FOR MANUFACTURE THEREOF | TROCHE, EDGAREDMANUE | 1744 | §103 | Final Rejection | 12d | Pending | Sep 23, 2024 |
| 18889181 | AIRCRAFT LANDING SITE DETERMINATION FOR AUTOMATED EMERGENCY LANDING CONTROL | CAIN, AARON G | 3656 | §103 | Non-Final OA | — | Pending | Sep 18, 2024 |
| 18816922 | METAL TO COMPOSITE JOINTS | GAITONDE, MEGHA MEHTA | 1781 | §102§103 | Non-Final OA | — | Pending | Aug 27, 2024 |
| 18816931 | COMPOSITE PANELS WITH TITANIUM ENDS | YANKEY, RYAN ANDREW | 3642 | §103§112 | Final Rejection | — | Pending | Aug 27, 2024 |
| 18810272 | BALANCED TRAINING DATASETS FOR PREDICTING AIRCRAFT COMPONENT FAULTS | MULDER, DOMINICK ANTHONY CHIR | 3661 | §101§103 | Non-Final OA | — | Pending | Aug 20, 2024 |
| 18806820 | SYSTEMS AND METHODS FOR A DETERMINATION OF A LOCATION OF AN AERIAL REFUELING DROGUE USING ACTIVE ILLUMINATION | RIVERA-MARTINEZ, GUILLERMO M | — | §103 | Final Rejection | — | Pending | Aug 16, 2024 |
| 18806314 | DOOR LATCHING APPARATUS | NEUBAUER, THOMAS L | 3675 | §112Other | Non-Final OA | — | Pending | Aug 15, 2024 |
| 18802820 | THERMAL IMAGE-BASED TRACKING TO MATE CONNECTORS OF VEHICLES | CAI, PHUONG HAU | 2673 | §102§103 | Final Rejection | — | Pending | Aug 13, 2024 |
| 18791793 | PROVIDING CONFIDENCE INFORMATION ASSOCIATED WITH DETECTED STATE TRANSITIONS FOR DYNAMIC SYSTEMS | LINDSAY, BERNARD G | 2119 | §101 | Final Rejection | — | Pending | Aug 01, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialThe Boeing Company has 208 pending office actions as of October 2026, spread across 111 art units and 189 examiners.
Hana C Page has the most, with 4 of The Boeing Company's pending office actions.
Mostly Transportation, E-Commerce & Mechanical Systems (USPTO Tech Center 3600), based on where its pending office actions are examined.