Listed by the USPTO as MAWARI, REDHWAN K
Tech Center 3600 • Art Units: 2462 3652 3662 3663 3664 3665 3667
This examiner grants 73% of resolved cases
MAWARI, REDHWAN K works in Tech Center 3600 and Art Unit 2462. His record includes 716 resolved cases, a 72.6% allowance rate, and a 1230-day median to allowance. The allowance rate indicates that a substantial share of resolved matters reached allowance, while the median points to extended prosecution timing.
The interview lift is 26.8%, showing a substantial association between interviews and allowance outcomes. Recurring companies include Robert Bosch GmbH, JPMorgan Chase Bank, N.A., and Kia Corporation. The listed firms are BANNER & WITCOFF, LTD., MAGINOT, MOORE & BECK, LLP, and MATTINGLY & MALUR, PC. Counsel may benefit from preparing interviews around precise claim distinctions.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18683550 | METHOD AND DEVICE FOR DETERMINING AND CHARACTERIZING ROAD UNEVENNESS | Final Rejection | Robert Bosch GmbH |
| 18646535 | Method for Generating and Outputting an Operating Signal in a Vehicle as well as Computer Program Product | Non-Final OA | Bayerische Motoren Werke Aktiengesellschaft |
| 18951931 | VEHICLE COMPONENT MOUNTING SYSTEM | Non-Final OA | Kia Corporation |
| 19265760 | METHOD AND APPARATUS FOR PLANNING VEHICLE TRAJECTORY, INTELLIGENT DRIVING DOMAIN CONTROLLER, AND INTELLIGENT VEHICLE | Non-Final OA | YINWANG INTELLIGENT TECHNOLOGIES CO., LTD. |
| 18346306 | VOLTAGE DISCHARGE IN REFRIGERATION SYSTEM | Non-Final OA | Carrier Corporation |
| 18853574 | WORK MACHINE | Final Rejection | HITACHI CONSTRUCTION MACHINERY CO., LTD. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy72.6% of resolved applications examined by Redhwan K Mawari were allowed (716 resolved cases), compared with 72.8% across Art Unit 2462 over the last five years.
This examiner's interview lift is +26.8 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Redhwan K Mawari took 1,230 days on average from filing to allowance.
Redhwan K Mawari examines applications in Art Unit 2462 in Tech Center 3600 (Transportation, E-Commerce & Mechanical Systems).