Listed by the USPTO as PEACH, POLINA G
Tech Center 4100 • Art Units: 2165 4100
This examiner grants 50% of resolved cases
Peach, Polina G is assigned to Tech Center 4100 and Art Unit 2165, with 479 resolved cases. The allowance rate is 50.3%, the interview lift is 23.8%, and the median time to allowance is 1390 days. The allowance rate is higher than the interview measure, while the positive lift suggests that interviews can support prosecution in a docket with extended timing.
The listed companies are KPN Innovations LLC, Halliburton Energy Services Inc., and Emerson Electric Co. The leading firms are CALDWELL LLC, AMIN, TUROCY & WATSON, LLP, and BROADVIEW IP LAW, PC. Practitioners should combine focused interview requests with carefully structured written responses and early planning for a longer prosecution cycle.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18476149 | AUTOMATICALLY LOCATING AND TRACKING A TRANSIENT OBJECT IN A HYDROCARBON WELL CONDUIT | Non-Final OA | Halliburton Energy Services, Inc. |
| 18205076 | AUGMENTING SOURCE CODE REPRESENTATION MODELS WITH ABSTRACT SYNTAX TREES USING TREE TRAVERSAL ALGORITHMS | Non-Final OA | Oracle International Corporation |
| 17992305 | SYSTEM AND METHOD FOR PROVIDING BOTTOM-UP AGGREGATION IN A MULTIDIMENSIONAL DATABASE ENVIRONMENT | Non-Final OA | ORACLE INTERNATIONAL CORPORATION |
| 18575259 | DATA CLASSIFICATION METHOD FEASIBLE ON NISQ COMPUTER AND APPARATUS THEREOF | Final Rejection | KOREA ADVANCED INSTITUTE OF SCIENCE AND TECHNOLOGY |
| 18237585 | SYSTEMS AND METHODS FOR PROCESSING EMOJIS IN A SEARCH AND RECOMMENDATION ENVIRONMENT | Final Rejection | Adeia Guides Inc. |
| 14843323 | METHOD AND APPARATUS FOR CONTROLLING A PROCESS PLANT WITH WEARABLE MOBILE CONTROL DEVICES | Final Rejection | FISHER-ROSEMOUNT SYSTEMS, INC. |
| 18654144 | INFECTIOUS DISEASE PROLIFERATION PREVENTION SYSTEM AND METHOD | Non-Final OA | KT Corporation |
| 19338561 | MULTI-AGENT PROCESSING FRAMEWORK FOR AUTOMATED QUERY RESOLUTION | Non-Final OA | ADP, Inc. |
| 18645255 | GENERALIZABLE ENTITY RESOLUTION BASED ON ONTOLOGY STRUCTURES | Non-Final OA | Palantir Technologies Inc. |
| 18388010 | USING A CURRICULUM FOR REINFORCEMENT LEARNING TO TRAIN AN LLM-BASED NETWORK TROUBLESHOOTING AGENT | Final Rejection | Cisco Technology, Inc. |
| 18965478 | ORGANIZING HETEROGENEOUS TYPES OF PROMPTS IN A METADATA MODEL FOR EASIER INPUT | Non-Final OA | SAP SE |
| 18889497 | METHOD FOR INFORMATION PROCESSING BASED ON LARGE LANGUAGE MODEL | Final Rejection | BEIJING BAIDU NETCOM SCIENCE TECHNOLOGY CO., LTD. |
| 18456509 | INFORMATION PROCESSING SYSTEM, NON-TRANSITORY COMPUTER READABLE MEDIUM STORING PROGRAM, AND INFORMATION PROCESSING METHOD | Non-Final OA | FUJIFILM Business Innovation Corp. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy50.3% of resolved applications examined by Polina G Peach were allowed (479 resolved cases), compared with 69.0% across Art Unit 2165 over the last five years.
This examiner's interview lift is +23.8 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Polina G Peach took 1,390 days on average from filing to allowance.
Polina G Peach examines applications in Art Unit 2165 in Tech Center 4100.