Tech Center 2600 • Art Units: 2618 2647 2649
This examiner grants 58% of resolved cases
Fatuma G. Sherif works in Tech Center 2600 and Art Unit 2618, where she has 383 resolved cases. The allowance rate pct is 58.0. The median days to allowance is 1147, which is a key figure for planning the prosecution timeline. These metrics are derived from the 383 resolved cases that form the basis of this examiner's profile.
The interview lift pct is 16.0, suggesting that interviews provide a meaningful increase in the likelihood of allowance compared to the 58.0 allowance rate pct. With 383 resolved cases, this lift is a reliable indicator that direct communication can help move an application toward allowance. The 1147 median days to allowance should be used to set realistic expectations for the duration of the process. Practitioners can use the 16.0 interview lift pct as a strategic tool to improve their chances of success. Overall, the 58.0 allowance rate pct indicates a moderate level of difficulty that can be mitigated through active engagement with the examiner.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18205779 | Two-Piece Exoskeleton for a Mobile Computing Device | Final Rejection | ZEBRA TECHNOLOGIES CORPORATION |
| 18781608 | POWER CLASS SWITCHING MODES | Non-Final OA | QUALCOMM Incorporated |
| 18758601 | DEVICE CONNECTION METHOD, DEVICE, AND STORAGE MEDIUM | Non-Final OA | GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. |
| 18462083 | BANDWIDTH TUNING USING SINGLE-INPUT MULTIPLE-OUTPUT LOW-NOISE AMPLIFIER | Final Rejection | TEXAS INSTRUMENTS INCORPORATED |
| 18812838 | ACOUSTIC WAVE FILTER MODULES WITH INTEGRATED PHASE SHIFT CIRCUITS | Non-Final OA | Skyworks Solutions, Inc. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy