Listed by the USPTO as VARMA, ASHISH K
Tech Center 3600 • Art Units: 3674
This examiner grants 74% of resolved cases
VARMA, ASHISH K has resolved 469 cases in technology center 3600 and art unit 3674. The allowance rate is 74.4%, and the median time to allowance is 940 days. Interviews are associated with a 32.4% lift in the allowance rate. These figures show an allowance rate above half of resolved cases and a notable interview association.
Schlumberger Technology Corporation, LG Energy Solution Ltd., and Petróleo Brasileiro S.A. - Petrobras are the listed leading companies. MCCARTER & ENGLISH, LLP BOSTON, BENESCH, FRIEDLANDER, COPLAN & ARONOFF LLP, and HSML P.C. are the listed leading firms. The participant lists can guide matter research, while the interview figure supports considering examiner discussions in prosecution strategy.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18291434 | Cell Gripper and Cell Transfer Device Including the Same | Non-Final OA | LG Energy Solution, Ltd. |
| 19389508 | System for Preventive Inhibition of Scaling in Oil Wells and Process for Preventive Inhibition of Scaling in Oil Wells | Non-Final OA | PETRÓLEO BRASILEIRO S.A. - PETROBRAS |
| 19308564 | IDENTIFYING DRILL CUTTINGS WITH TRACER PILLS | Final Rejection | Saudi Arabian Oil Company |
| 18832593 | CHEMICAL METHODS FOR CAVITATION INCEPTION IN DOWNHOLE ENVIRONMENTS | Non-Final OA | SAUDI ARABIAN OIL COMPANY |
| 19168177 | METHOD FOR LEACHING ROCK METAL COMPONENT, METHOD FOR STORING CARBON DIOXIDE UNDERGROUND, AND METHOD FOR FIXING CARBON DIOXIDE | Non-Final OA | TOHOKU UNIVERSITY |
| 19193762 | Method for Preventing Influx of Fluid During Fracturing of an Offset Well | Non-Final OA | Ely and Associates, LLC |
| 18441330 | REACHING AND GRASPING TOOL | Non-Final OA | Unger Marketing International, LLC |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy74.4% of resolved applications examined by Ashish K Varma were allowed (469 resolved cases), compared with 68.9% across Art Unit 3674 over the last five years.
This examiner's interview lift is +32.4 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Ashish K Varma took 940 days on average from filing to allowance.
Ashish K Varma examines applications in Art Unit 3674 in Tech Center 3600 (Transportation, E-Commerce & Mechanical Systems).