Technology area: Chemistry & Materials
758 pending office actions • 94 art units • 342 examiners • 0 of 758 (0%) have an AI response strategy ready • 1,061 patents granted in the last 365 days
LG Energy Solution Ltd. has 781 pending office actions in Chemistry & Materials. The portfolio spans 353 distinct examiners and 94 distinct art units, combining a large prosecution workload with meaningful dispersion across examination personnel and technical groups. This structure creates a need for consistent claim language, coordinated prior-art analysis, and reliable transfer of knowledge between related matters.
D'ANIELLO, NICHOLAS P is the busiest named examiner, with 9 pending matters. Even this examiner-specific cluster sits within a much broader distribution, so focused examiner review should be integrated with art-unit and technology tracking. Counsel can use the data to identify related cases, align amendment positions, and avoid duplicating analysis across separate examination teams.
Based on the USPTO statutory response window for each pending office action. 157 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 157 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 10 (1%) |
| §101 + other | 19 (3%) |
| §103 only | 343 (45%) |
| §102 only | 37 (5%) |
| §112 only | 11 (1%) |
| Double-patenting only | 5 (1%) |
| Double-patenting + other | 18 (2%) |
| Multi-statute (no §101) | 315 (42%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| MARROQUIN, DOUGLAS C | 10 | 46.7% | +68.8% |
| CULLEN, SEAN P | 9 | 69.2% | +28.0% |
| D'ANIELLO, NICHOLAS P | 8 | 68.2% | +41.4% |
| BILLIET, AMANDA JUNE | 8 | 54.9% | +19.0% |
| RIDLEY, BASIA ANNA | 8 | 13.5% | +1.7% |
| BERNATZ, KEVIN M | 7 | 87.9% | +12.3% |
| DOVE, TRACY MAE | 7 | 68.7% | +9.3% |
| HA, STEVEN S | 7 | 70.4% | +29.5% |
| ESTES, JONATHAN WILLIAM | 7 | 68.2% | +7.9% |
| DISNEY, CHRISTINE CONLON | 7 | 22.2% | +25.8% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19045407 | SEPARATOR FOR ELECTROCHEMICAL DEVICE, MANUFACTURING METHOD THEREOF, AND ELECTROCHEMICAL DEVICE INCLUDING SAME | BERNATZ, KEVIN M | — |
| 18290530 | METHOD FOR MANUFACTURING SEPARATOR FOR LITHIUM SECONDARY BATTERY, SEPARATOR FOR LITHIUM SECONDARY BATTERY MANUFACTURED THEREFROM, AND LITHIUM SECONDARY BATTERY HAVING SAME | BERNATZ, KEVIN M | — |
| 18290492 | ANODE MANUFACTURING METHOD, ANODE, AND SECONDARY BATTERY COMPRISING SAME | BERNATZ, KEVIN M | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18574833 | Vehicle, Computing System, Operating Method of Computing System and Computer Program | VON VOLKENBURG, KEITH ALLEN | 73d overdue |
| 17780298 | Apparatus and Method for Bending Electrode Tab | LUO, KAN | 67d overdue |
| 18273339 | Electrode Assembly and Battery Cell Including the Same | GARCIA, BETHANY CLAIRE | 46d overdue |
| 18269524 | BATTERY PACK AND DEVICE INCLUDING THE SAME | AKRAM, IMRAN | 45d overdue |
| 17795315 | Battery Module, Battery Pack Including the Same and Manufacturing Method of the Same | KERNS, KEVIN P | 44d overdue |
| 18028880 | Electrode Lead for Secondary Battery Having Gas Release Portion and Secondary Battery Including the Same | LI, AIQUN | 36d overdue |
| 17917107 | POSITIVE ELECTRODE FOR LITHIUM SECONDARY BATTERY, AND LITHIUM SECONDARY BATTERY | CASERTO, JULIA SHARON | 36d overdue |
| 17786131 | MEMBRANE FOR ELECTROCHEMICAL DEVICE, ELECTROCHEMICAL DEVICE INCLUDING MEMBRANE, AND METHOD FOR MANUFACTURING ELECTROCHEMICAL DEVICE | RIDLEY, BASIA ANNA | 24d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17944672 | BATTERY PACK AND VEHICLE INCLUDING THE SAME | BILLIET, AMANDA JUNE | 8d overdue |
| 17630265 | Electrode and Secondary Battery Including Same | DISNEY, CHRISTINE CONLON | 8d overdue |
| 17625018 | Electrode and Secondary Battery Including Same | DISNEY, CHRISTINE CONLON | 8d overdue |
| 17615982 | Electrode and Secondary Battery Including the Same | DISNEY, CHRISTINE CONLON | 8d overdue |
| 18198711 | LITHIUM ION SECONDARY BATTERY AND SEPARATION MEMBRANE | CULLEN, SEAN P | 12d |
| 18272004 | Secondary Battery | MARROQUIN, DOUGLAS C | 20d |
| 17608894 | Electrode and Secondary Battery Including the Same | DISNEY, CHRISTINE CONLON | 21d |
| 18022706 | BATTERY MODULE AND BATTERY PACK INCLUDING THE SAME | BILLIET, AMANDA JUNE | 29d |
| Art Unit | Apps |
|---|---|
| 1725 | 91 |
| 1723 | 68 |
| 1752 | 48 |
| 1751 | 46 |
| 1729 | 43 |
| 1727 | 40 |
| 1728 | 32 |
| 1721 | 28 |
| 1724 | 26 |
| 1726 | 25 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19701080 | Pouch For Secondary Battery And Lithium Secondary Battery Comprising The Same | ORJI, CALEB UCHECHUKWU | 1713 | §103§112Other | Non-Final OA | — | Pending | Jun 08, 2026 |
| 19464042 | Lithium Secondary Battery | ENGLE, PATRICIA LYNN | 3991 | §103 | Final Rejection | — | Pending | Jan 29, 2026 |
| 19453852 | MULTILAYER NANOPOROUS SEPARATOR | PARK, LISA S | 1729 | §112Other | Final Rejection | — | Pending | Jan 20, 2026 |
| 19436755 | Electrode for Lithium Secondary Battery, Method of Preparing the Same and Lithium Secondary Battery Including the Same | MARTIN, ANGELA J | 1727 | §103 | Final Rejection | — | Pending | Dec 30, 2025 |
| 18708141 | Immersion-Cooled Battery Module, and Battery Pack and Vehicle Including the Same | MENDOZA, KENT GREGORY | 1754 | §103§112DP | Non-Final OA | — | Pending | Nov 21, 2025 |
| 19481686 | Cutting Device and Powder Input Equipment Including the Same | KOTIS, JOSHUA G | 3731 | §102§103§112 | Non-Final OA | — | Pending | Nov 05, 2025 |
| 19370242 | Secondary Battery | FEHR, JULIA MARIE | 1725 | §103 | Final Rejection | — | Pending | Oct 27, 2025 |
| 19365024 | SEPARATOR, MANUFACTURING METHOD THEREOF, AND ELECTROCHEMICAL DEVICE INCLUDING THE SAME | FRANCIS, ADAM JOSEPH | 1728 | §103 | Final Rejection | — | Pending | Oct 21, 2025 |
| 19345223 | Positive Electrode Active Material, Positive Electrode Comprising the Same, and Lithium Secondary Battery | WEINER, LAURA S | 1723 | §102§103Other | Final Rejection | — | Pending | Sep 30, 2025 |
| 19344359 | SEPARATOR FOR ELECTROCHEMICAL DEVICE AND ELECTROCHEMICAL DEVICE INCLUDING THE SAME | ORTIZ, ARYANA YASMINE | 1751 | §103 | Non-Final OA | — | Pending | Sep 29, 2025 |
| 19334312 | COMPOSITION FOR FORMING COATING LAYER AND METHOD FOR MANUFACTURING SEPARATOR FOR ELECTROCHEMICAL DEVICE USING THE SAME | KASS-MULLET, BENJAMIN ELI | 1752 | §103 | Non-Final OA | — | Pending | Sep 19, 2025 |
| 19332345 | Positive Electrode and Lithium Secondary Battery Including the Same | ZEMUI, NATHANAEL T | 1727 | §103 | Final Rejection | 48d | Pending | Sep 18, 2025 |
| 19327516 | Secondary Battery | MELFI, OLIVIA MASON | 1729 | §103§112 | Non-Final OA | 43d | Pending | Sep 12, 2025 |
| 19164126 | SECONDARY BATTERY PACKAGING INTERLEAF AND SECONDARY BATTERY PACKAGING BOX | BUI, LUAN KIM | 3736 | §102§103§112 | Non-Final OA | — | Pending | Sep 10, 2025 |
| 19164032 | Electrode Transfer System | SANDERS, HOWARD J | 3653 | §102§103§112 | Non-Final OA | — | Pending | Sep 10, 2025 |
| 19317534 | SEPARATOR FOR ELECTROCHEMICAL DEVICE AND ELECTROCHEMICAL DEVICE INCLUDING THE SAME | BOYD, JENNIFER A | 1786 | §103 | Non-Final OA | — | Pending | Sep 03, 2025 |
| 19308646 | Positive Electrode Material for Lithium Secondary Battery, and Positive Electrode for Lithium Secondary Battery and Lithium Secondary Battery Including the Same | HILTON, ALBERT MICHAEL | 1723 | §103 | Non-Final OA | — | Pending | Aug 25, 2025 |
| 19299178 | BATTERY MODULE, BATTERY PACK INCLUDING BATTERY MODULE, AND VEHICLE INCLUDING BATTERY PACK | SANDERSON, LEE E | 3991 | DPOther | Non-Final OA | — | Pending | Aug 13, 2025 |
| 19152084 | Relay Control Apparatus and Method | WILLOUGHBY, TERRENCE RONIQUE | 2836 | §102 | Non-Final OA | — | Pending | Jul 30, 2025 |
| 18861423 | Power Supply Device, Device for Manufacturing Electrode Assembly Using Same, Electrode Supply Method, and Method for Manufacturing Electrode Assembly Using Same | GOFF II, JOHN L | 1746 | §102§103§112 | Non-Final OA | — | Pending | Jul 25, 2025 |
| 19145766 | BATTERY SYSTEM CONTROL APPARATUS AND OPERATING METHOD THEREOF | GREENE, JOSEPH L | 2443 | §103 | Non-Final OA | — | Pending | Jul 03, 2025 |
| 19141487 | Positive Electrode Active Material, Positive Electrode Comprising the Same, and Lithium Secondary Battery | WEINER, LAURA S | 1723 | §102§103Other | Final Rejection | — | Pending | Jun 20, 2025 |
| 19199566 | NANOPOROUS SEPARATORS FOR BATTERIES AND RELATED MANUFACTURING METHODS | RAYMOND, BRITTANY L | 1722 | §103 | Non-Final OA | — | Pending | May 06, 2025 |
| 19124500 | HEAT SINK ASSEMBLY | DUONG, THO V | 3763 | §103§112 | Non-Final OA | — | Pending | Apr 25, 2025 |
| 19176514 | SYSTEMS AND METHODS FOR GENERATING ROLL MAP AND MANUFACTURING BATTERY USING ROLL MAP | CHMIELECKI, SCOTT J | 1729 | §103 | Final Rejection | — | Pending | Apr 11, 2025 |
| 19113846 | FDC (FAULT DETECTION COUNTER) INFORMATION ABOUT DTC (DIAGNOSTIC TROUBLE CODE) TRANSCEIVING METHOD AND BATTERY SYSTEM USING THE METHOD | PETTIEGREW, TOYA R | 3662 | §101§103 | Non-Final OA | — | Pending | Mar 20, 2025 |
| 19080500 | BATTERY COOLING ARRANGEMENT IN AN UNDERBODY OF A VEHICLE | TRIGGS, JAMES J | 3615 | §102§103§112 | Non-Final OA | — | Pending | Mar 14, 2025 |
| 19110691 | Heat Sink Assembly | HINCAPIE SERNA, GUSTAVO A | 3763 | §103 | Non-Final OA | 34d | Pending | Mar 11, 2025 |
| 19110616 | BATTERY STATE INFORMATION PROVIDING APPARATUS AND OPERATION METHOD THEREOF | MARUNDA II, TORRENCE S | 3663 | §101§102§103 | Non-Final OA | — | Pending | Mar 11, 2025 |
| 19076317 | Battery Diagnosing Apparatus and Method | SANGHERA, JAS A | 2852 | §112Other | Non-Final OA | — | Pending | Mar 11, 2025 |
| 19110373 | BMS GROUNDING ASSEMBLY | MORRISON, RASHEN E | 2841 | §102 | Non-Final OA | — | Pending | Mar 10, 2025 |
| 19074863 | Battery Classification Apparatus and Method | ALEJNIKOV JR, ROBERT P | 2857 | §101 | Non-Final OA | — | Pending | Mar 10, 2025 |
| 19108960 | Battery Pack Voltage Measurement Circuit | LE, THANG XUAN | 2858 | §102§103 | Non-Final OA | — | Pending | Mar 05, 2025 |
| 19060347 | APPARATUS AND METHOD FOR ESTIMATING CAPACITY OF BATTERY | RIOS RUSSO, RAUL J | 2858 | §103§112 | Non-Final OA | — | Pending | Feb 21, 2025 |
| 19105568 | Heat Sink Assembly | LING, FOR K | 3763 | §103§112 | Non-Final OA | — | Pending | Feb 21, 2025 |
| 19056507 | BATTERY SYSTEM DIAGNOSING APPARATUS AND METHOD | NGUYEN, TRUNG Q | 2858 | §103§112 | Non-Final OA | — | Pending | Feb 18, 2025 |
| 19054420 | Battery Diagnosis Apparatus and Method for Leakage Current Detection | SANGHERA, JAS A | 2852 | DP | Non-Final OA | — | Pending | Feb 14, 2025 |
| 19052842 | Electrode, Secondary Battery Comprising the Same, and Method for Manufacturing the Same | CARRICO, ROBERT SCOTT | 1727 | §102§103 | Non-Final OA | 54d | Pending | Feb 13, 2025 |
| 19103763 | VEHICLE | SHELTON, IAN BRYCE | 3613 | §103 | Non-Final OA | — | Pending | Feb 13, 2025 |
| 19045407 | SEPARATOR FOR ELECTROCHEMICAL DEVICE, MANUFACTURING METHOD THEREOF, AND ELECTROCHEMICAL DEVICE INCLUDING SAME | BERNATZ, KEVIN M | 1725 | §103Other | Non-Final OA | — | Pending | Feb 04, 2025 |
| 19100830 | Electrode Supply Device, Electrode Assembly Manufacturing Device Using Same, Electrode Supply Method, and Electrode Assembly Manufacturing Method Using Same | KONVES, ADRIANNA N | 1748 | §103 | Non-Final OA | — | Pending | Feb 03, 2025 |
| 19100782 | MANUFACTURING APPARATUS OF SECONDARY BATTERY | TEMPLETON, CHRISTOPHER L | 3725 | §103§112 | Non-Final OA | — | Pending | Feb 03, 2025 |
| 19041040 | Electrode for Electrochemical Device Comprising Dry Electrode Film and Method for Manufacturing the Same | MARTIN, ANGELA J | 1727 | §103 | Non-Final OA | — | Pending | Jan 30, 2025 |
| 18998194 | Secondary Battery Manufacturing Device | MICHALSKI, SEAN M | 3724 | §102§103§112 | Non-Final OA | — | Pending | Jan 24, 2025 |
| 18997831 | Knife and Secondary Battery Manufacturing Device Including the Same | CORNETT, ROBERT D | 3724 | §102§103 | Non-Final OA | — | Pending | Jan 23, 2025 |
| 18995131 | SYSTEM FOR CUTTING LITHIUM METAL FOR NEGATIVE ELECTRODES | DAVIES, SAMUEL ALLEN | 3724 | §102§103§112 | Non-Final OA | — | Pending | Jan 15, 2025 |
| 18834691 | Battery Diagnosing Apparatus, Battery Diagnosing Method, Battery Pack and Electric Vehicle | ASTACIO-OQUENDO, GIOVANNI | 2858 | §101 | Non-Final OA | — | Pending | Jan 15, 2025 |
| 18994308 | Welding and Welding Jig Monitoring System | PATEL, JIGNESHKUMAR C | 2116 | §103§112 | Non-Final OA | — | Pending | Jan 14, 2025 |
| 19016662 | APPARATUS AND METHOD OF MANUFACTURING BATTERY MODULE | CANTELMO, GREGG | 1725 | §103§112 | Non-Final OA | — | Pending | Jan 10, 2025 |
| 19010605 | Method of Preparing Positive Electrode | MURATA, AUSTIN | 1712 | §103 | Final Rejection | 15d | Pending | Jan 06, 2025 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialLG Energy Solution Ltd. has 758 pending office actions as of November 2026, spread across 94 art units and 342 examiners.
Douglas C Marroquin has the most, with 10 of LG Energy Solution Ltd.'s pending office actions.
Mostly Chemistry & Materials (USPTO Tech Center 1700), based on where its pending office actions are examined.