Listed by the USPTO as WILSON, GREGORY A
Tech Center 3700 • Art Units: 3743 3749 3762
This examiner grants 82% of resolved cases
WILSON, GREGORY A has resolved 1216 cases in tech center 3700 and art unit 3743. The allowance rate is 81.9%, and the median time to allowance is 1021 days. The interview lift is 6.9%, a positive but smaller signal than the overall allowance result.
The listed companies are Illinois Tool Works Inc., Kyungdong Navien Co., Ltd., and ASM IP Holding B.V. The listed firms are Muncy, Geissler, Olds & Lowe, P.C., MCDONALD HOPKINS LLC, and ALIX, YALE & RISTAS, LLP. The large resolved-case base supports using the profile as a meaningful reference point, while the median timeline supports attention to pendency expectations.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18806906 | LOAD LOCK ARRANGEMENTS, SEMICONDUCTOR PROCESSING SYSTEMS INCLUDING LOAD LOCK ARRANGEMENTS, AND ASSOCIATED METHODS FOR REGULATING THE TEMPERATURE OF SUBSTRATES WITHIN LOAD LOCK ARRANGEMENTS | Non-Final OA | ASM IP Holding B.V. |
| 18844723 | TEMPERATURE MEASURING DEVICE AND FURNACE INCLUDING THE SAME | Non-Final OA | Illinois Tool Works Inc. |
| 18734873 | SYSTEM AND METHOD FOR DETERMINING WHETHER TO CLEAN A REFLOW OVEN | Non-Final OA | Illinois Tool Works Inc. |
| 18731575 | HEAT TREATMENT SYSTEM | Non-Final OA | NGK INSULATORS, LTD. |
| 18725157 | WATER HEATER | Non-Final OA | KYUNGDONG NAVIEN CO., LTD. |
| 18752073 | HEAT EXCHANGER UNIT AND METHOD FOR MANUFACTURING THE SAME | Non-Final OA | Kyungdong Navien Co., LTD |
| 18719499 | LIQUID RADIOACTIVE WASTE INPUT SYSTEM | Non-Final OA | KOREA HYDRO & NUCLEAR POWER CO., LTD |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy81.9% of resolved applications examined by Gregory A Wilson were allowed (1,216 resolved cases), compared with 0.0% across Art Unit 3743 over the last five years.
This examiner's interview lift is +6.9 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Gregory A Wilson took 1,021 days on average from filing to allowance.
Gregory A Wilson examines applications in Art Unit 3743 in Tech Center 3700 (Medical Devices & Mechanical Engineering).