Prosecution Insights
Last updated: October 26, 2026

Rheem Manufacturing Company

Technology area: Medical Devices & Mechanical Engineering

34 pending office actions • 13 art units • 31 examiners • 0 of 34 (0%) have an AI response strategy ready • 36 patents granted in the last 365 days

Analysis

Rheem Manufacturing Company has 34 pending office actions in Medical Devices & Mechanical Engineering. The matters involve 31 distinct examiners and 13 distinct art units, combining substantial examiner dispersion with repeated activity across the art-unit structure.

ZERPHEY, CHRISTOPHER R is the busiest examiner, with 3 pending matters. That assignment is the clearest examiner-level concentration, while 31 examiners overall require a broad prosecution management system. Counsel can coordinate recurring technical issues through the 13 art units, but should preserve examiner-specific positions for the matters assigned outside that concentration.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Portfolio Summary

34
Total Pending OAs
19
Non-Final OAs
12
Final Rejections
3
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 6 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

2
Overdue
0
Due this week
2
Due this month
0
Due in next 60 days
2
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 6 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (2)Due ≤ 30 days (2)Due later (2)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

17
Hard (50%)
14
Medium (41%)
3
Easy (9%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§101 + other1 (3%)
§103 only14 (41%)
§112 only3 (9%)
Multi-statute (no §101)16 (47%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

1
Life Sciences
3% of docket
6
Information Tech
18% of docket
0
Communications
0% of docket
2
Semiconductors
6% of docket
24
Mechanical / Eng
71% of docket
1
Business / Other
3% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

340 h
Manual time on pending OAs
68 h
Time saved (low, 20%)
119 h
Time saved (mid, 35%)
3.0 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
ZERPHEY, CHRISTOPHER R 3 48.8% +19.2%
SAVANI, AVINASH A 2 74.7% +20.7%
DUKE, EMMANUEL E 1 68.9% +27.4%
DIAZ, MIGUEL ANGEL 1 79.8% +11.8%
TAVAKOLDAVANI, KAMRAN 1 81.5% +6.8%
SAN MARTIN, EDGARDO 1 76.0% +6.6%
COMINGS, DANIEL C 1 63.8% +37.2%
CHOI, MICHAEL W 1 77.3% +30.0%
LU, JIONG-PING 1 83.6% +7.9%
PEREIRO, JORGE ANDRES 1 63.8% +20.6%

Hard Cases (17)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18731657 Systems and Methods for Heating and Removing Condensation from Air Conditioning Units BANKS, KEONA LAUREN 31d overdue
18805258 SYSTEMS AND METHODS FOR HVAC OUTDOOR UNIT WITH GRILL FORMING A SUPPORT STRUCTURE HINCAPIE SERNA, GUSTAVO A 9d overdue
18543858 Drain Systems and Methods for Heater Assemblies KOSANOVIC, HELENA 22d
19224501 AIR HANDLER DUKE, EMMANUEL E —
18984593 APPARATUS AND METHODS FOR HEATING WATER WITH REFRIGERANT FROM AIR CONDITIONING SYSTEM ZERPHEY, CHRISTOPHER R —
18979246 LOUVERED FIN TAVAKOLDAVANI, KAMRAN —
18950413 SOUND ATTENUATING COMPRESSOR JACKET SAN MARTIN, EDGARDO —
18933174 Heat Pump Noise Cancelling Systems and Methods COMINGS, DANIEL C —

Interview Candidates (10)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
19224501 AIR HANDLER DUKE, EMMANUEL E —
19014721 AIR-TO-WATER HEAT PUMP WITH WATER-TO-WATER ALTERNATIVE AND ASSOCIATED METHODS DIAZ, MIGUEL ANGEL —
18984593 APPARATUS AND METHODS FOR HEATING WATER WITH REFRIGERANT FROM AIR CONDITIONING SYSTEM ZERPHEY, CHRISTOPHER R —
18933174 Heat Pump Noise Cancelling Systems and Methods COMINGS, DANIEL C —
18907417 SYSTEMS AND METHODS FOR REDUCING TEMPERATURE OVERSHOOT OF A HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM CHOI, MICHAEL W —
18889927 Submerged Condensers and Heat Pump Water Heaters Including Same ZERPHEY, CHRISTOPHER R —
18847580 Condensate Transfer Systems for Self-Contained Heat Pump Room Conditioning Units ZERPHEY, CHRISTOPHER R —
18820005 Dynamic Furnace Control PEREIRO, JORGE ANDRES —

Top Art Units

Art UnitApps
3763 12
3762 5
3799 4
2116 2
2119 2
2837 1
1713 1
3745 1
2118 1
3736 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19224501 AIR HANDLER DUKE, EMMANUEL E — §103§112 Non-Final OA — Pending May 30, 2025
19014721 AIR-TO-WATER HEAT PUMP WITH WATER-TO-WATER ALTERNATIVE AND ASSOCIATED METHODS DIAZ, MIGUEL ANGEL 3763 §112 Non-Final OA — Pending Jan 09, 2025
18984593 APPARATUS AND METHODS FOR HEATING WATER WITH REFRIGERANT FROM AIR CONDITIONING SYSTEM ZERPHEY, CHRISTOPHER R 3799 §102§103§112Other Non-Final OA — Pending Dec 17, 2024
18979246 LOUVERED FIN TAVAKOLDAVANI, KAMRAN 3763 §103§112 Non-Final OA — Pending Dec 12, 2024
18950413 SOUND ATTENUATING COMPRESSOR JACKET SAN MARTIN, EDGARDO 2837 §102§103 Non-Final OA — Pending Nov 18, 2024
18933174 Heat Pump Noise Cancelling Systems and Methods COMINGS, DANIEL C 3763 §102§103 Final Rejection — Pending Oct 31, 2024
18907417 SYSTEMS AND METHODS FOR REDUCING TEMPERATURE OVERSHOOT OF A HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM CHOI, MICHAEL W 2116 §101§103§112Other Non-Final OA — Pending Oct 04, 2024
18889927 Submerged Condensers and Heat Pump Water Heaters Including Same ZERPHEY, CHRISTOPHER R 3799 §103Other Final Rejection — Pending Sep 19, 2024
18847580 Condensate Transfer Systems for Self-Contained Heat Pump Room Conditioning Units ZERPHEY, CHRISTOPHER R 3799 §103 Non-Final OA — Pending Sep 16, 2024
18821589 SYSTEMS AND METHODS FOR IMPROVING THE BOILING HEAT TRANSFER OF A HEAT TRANSFER COIL LU, JIONG-PING 1713 §102§103§112 Non-Final OA — Pending Aug 30, 2024
18820005 Dynamic Furnace Control PEREIRO, JORGE ANDRES 3799 §102§103 Non-Final OA — Pending Aug 29, 2024
18812152 Folded Double Wall Heat Exchanger Tubes and Methods of Manufacture PHAN, AN BACH 3763 §103 Final Rejection 69d Pending Aug 22, 2024
18805258 SYSTEMS AND METHODS FOR HVAC OUTDOOR UNIT WITH GRILL FORMING A SUPPORT STRUCTURE HINCAPIE SERNA, GUSTAVO A 3763 §102§103§112 Non-Final OA 9d overdue Pending Aug 14, 2024
18799885 Systems and Methods for Detecting Pressure in a Gas Furnace SAVANI, AVINASH A 3762 §103 Non-Final OA — Pending Aug 09, 2024
18833341 FAN MOUNTING DECK FOR AN AIR HANDLING UNIT FISHER, WESLEY LE 3745 §103§112 Non-Final OA — Pending Jul 25, 2024
18780820 Heat Pump with Multiple Mini-Compressors NIEVES, NELSON J 3763 §103 Final Rejection — Pending Jul 23, 2024
18779376 CONDENSATE MANAGEMENT SYSTEMS AND METHODS WILSON, GREGORY A 3762 §102§103 Non-Final OA — Pending Jul 22, 2024
18767434 HEAT PUMP WITH MULTIPLE EXPANSION VALVES GAYE, SAMBA NMN 3763 §103§112 Final Rejection — Pending Jul 09, 2024
18760569 REMOVABLE DRIP PAN HEAT SHIELD FOR HEAT EXCHANGER COIL SAVANI, AVINASH A 3763 §103 Non-Final OA — Pending Jul 01, 2024
18753245 SYSTEMS AND METHODS FOR AIR CONDITIONER SUBCOOLING CIRIC, LJILJANA V 3763 §112 Non-Final OA — Pending Jun 25, 2024
18731657 Systems and Methods for Heating and Removing Condensation from Air Conditioning Units BANKS, KEONA LAUREN 3763 §103§112 Final Rejection 31d overdue Pending Jun 03, 2024
18713071 DEFROST SYSTEM FOR HEAT PUMP POOL HEATER FURDGE, LARRY L 3763 §103 Non-Final OA — Pending May 23, 2024
18619007 AIR MOVER REFRIGERANT LEAK DETECTION AND RISK MITIGATION TADESSE, MARTHA 3763 §103 Final Rejection — Pending Mar 27, 2024
18441362 Systems and Methods for Providing Retroactive Wireless Connectivity to HVAC Systems KARIM, ZIAUL 2119 §102§103 Final Rejection — Pending Feb 14, 2024
18437461 Systems and Methods for Bypass Operation of Variable-Speed Drive MERCADO VARGAS, ARIEL 2118 §103 Non-Final OA — Pending Feb 09, 2024
18435808 Tankless Water Heating Systems and Methods that Include a First Energy Source and a Battery KABIR, SAAD M 2119 §102§103 Non-Final OA — Pending Feb 07, 2024
18418758 CONDUIT AND JUNCTION BOX ASSEMBLIES AND METHODS FOR WATER HEATERS ELOSHWAY, NIKI MARINA 3736 §103 Non-Final OA — Pending Jan 22, 2024
18407591 Systems Configured to Operate with Multiple Different Voltages LOPEZ ALVAREZ, OLVIN 2117 §103 Final Rejection 71d Pending Jan 09, 2024
18543858 Drain Systems and Methods for Heater Assemblies KOSANOVIC, HELENA 3762 §102§103§112 Non-Final OA 22d Pending Dec 18, 2023
18471535 Remote Monitoring of Heating, Ventilation, and Air Conditioning Devices ERDMAN, CHAD G 2116 §103 Non-Final OA 23d Pending Sep 21, 2023
18461258 Hot Water Re-Circulation Isolator System in Combination with Water Heater/Hydronic Heating System BARGERO, JOHN E 3762 §103 Final Rejection — Pending Sep 05, 2023
18446817 Systems and Methods for Balancing an Electric Load of a Three-Phase Water Heater BACHNER, ROBERT G 2898 §112 Non-Final OA — Pending Aug 09, 2023
18342416 SYSTEMS AND METHODS FOR AUTOMATED POOL HEATING UNIT CONFIGURATIONS DEEAN, DEEPAK A 3762 §103 Final Rejection — Pending Jun 27, 2023
18321444 ELECTRIC HEATING ELEMENTS AND WATER HEATERS INCLUDING SAME KERR, ELIZABETH M 3761 §102§103 Final Rejection — Pending May 22, 2023

Managing Rheem Manufacturing Company's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

How many pending USPTO office actions does Rheem Manufacturing Company have?

Rheem Manufacturing Company has 34 pending office actions as of October 2026, spread across 13 art units and 31 examiners.

Which USPTO examiner handles the most Rheem Manufacturing Company applications?

Christopher R Zerphey has the most, with 3 of Rheem Manufacturing Company's pending office actions.

What technology area are Rheem Manufacturing Company's patent applications in?

Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month