Listed by the USPTO as WORKU, KIDEST
Tech Center 3700 • Art Units: 1758 2119 2122 2123 2127 3625 3722 3761
This examiner grants 85% of resolved cases
WORKU, KIDEST works in Tech Center 3700 and Art Unit 1758. The record includes 1218 resolved cases, an 84.9% allowance rate, a 2.8% interview lift, and a median of 1603 days to allowance. The large record supports a stable reading of the allowance outcome. The modest positive interview measure suggests that interviews may help with clarification, but the profile does not indicate a large interview-related change in results.
The leading companies are Mitsubishi Electric Corporation, Rockwell Automation Technologies Inc., and Nicoventures Trading Limited. The leading firms are BCF LLP (Misc.), BUCHANAN, INGERSOLL & ROONEY PC, and Burr & Forman LLP (Primary Customer Number). The extended median pendency makes docket management particularly important. Practitioners should prepare complete written responses and use interviews selectively, with clear follow-up documentation.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18004984 | AEROSOL PROVISION SYSTEM | Final Rejection | NICOVENTURES TRADING LIMITED |
| 18961911 | AIR CONDITIONER AND METHOD FOR OPERATING AIR CONDITIONER | Non-Final OA | LG ELECTRONICS INC. |
| 18754970 | ELECTRONIC DEVICE AND OPERATION METHOD THEREOF | Non-Final OA | Samsung Electronics Co., Ltd. |
| 18492915 | LONG-TERM TREND ANALYSIS FOR EQUIPMENT FOR WELL SYSTEMS | Final Rejection | HALLIBURTON ENERGY SERVICES, INC. |
| 18810082 | CONTROL REDIRECTION AND IMAGE PORTING BETWEEN SURGICAL SYSTEMS | Non-Final OA | Cilag GmbH International |
| 18653819 | IN SITU DEFECT DETECTION OF ADDITIVELY-MANUFACTURED ARTICLES USING GRAPH NEURAL NETWORKS | Final Rejection | The Boeing Company |
| 18832587 | OPERATING A PLANT DURING LOW NATURAL POWER | Non-Final OA | Siemens Gamesa Renewable Energy A/S |
| 18863425 | PROCESS PLAN PREPARATION ASSISTANCE APPARATUS, PROCESS PLAN PREPARATION ASSISTANCE SYSTEM, AND PROCESS PLAN PREPARATION ASSISTANCE METHOD | Non-Final OA | Mitsubishi Electric Corporation |
| 18712315 | CONTROL DEVICE, CONTROL METHOD AND AIR CONDITIONING SYSTEM | Non-Final OA | Mitsubishi Electric Corporation |
| 18819974 | ANALYSIS SYSTEM WITH MACHINE LEARNING BASED INTERPRETATION | Non-Final OA | Tyco Fire & Security GmbH |
| 18291839 | NUMERICAL CONTROL APPARATUS | Non-Final OA | FANUC CORPORATION |
| 18323602 | METHOD AND SYSTEM FOR A VEHICLE TO BUILDING THERMAL CONTROL SYSTEM | Non-Final OA | FORD GLOBAL TECHNOLOGIES, LLC |
| 18807944 | CONFIGURATION METHOD FOR A POWER SUPPLY CONTROLLER AND A CONTROLLER EMPLOYING SAME | Non-Final OA | ROHM CO., LTD. |
| 18788108 | METHOD AND SYSTEM FOR REDUCING WORK-IN-PROCESS | Non-Final OA | Taiwan Semiconductor Manufacturing Company, Ltd. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy84.9% of resolved applications examined by Kidest Worku were allowed (1,218 resolved cases), compared with 38.8% across Art Unit 1758 over the last five years.
This examiner's interview lift is +2.8 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Kidest Worku took 1,603 days on average from filing to allowance.
Kidest Worku examines applications in Art Unit 1758 in Tech Center 3700 (Medical Devices & Mechanical Engineering).