Technology areas: Chemistry & Materials • Medical Devices & Mechanical Engineering
10 pending office actions • 3 clients • 10 examiners • 7 art units • 0 of 10 (0%) have an AI response strategy ready • 40 patents granted in the last 365 days
Hoffman Warnick - GE Vernova has 10 pending office actions in Chemistry & Materials. The profile records 10662 career applications, giving the current chemistry and materials docket context within a broad prosecution history. The active matters require current examination management despite the wider historical filing base.
The resolved allowance rate is 87.11%, and allowed matters have involved an average of 2.94 office actions. The rate supplies a resolved-outcome measure, while the action average indicates the examination activity associated with allowance. Practitioners can use these figures to frame both portfolio expectations and the response resources needed for prosecution.
Based on the USPTO statutory response window for each pending office action. 6 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 6 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 6 (60%) |
| §112 only | 1 (10%) |
| Multi-statute (no §101) | 3 (30%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| STONER, KILEY SHAWN | 1 | 80.8% | +15.4% |
| HASAN, SABBIR | 1 | 88.1% | +15.4% |
| REITZ, MICHAEL K. | 1 | 69.1% | +5.1% |
| STILES, JACOB BENJAMIN | 1 | 0.0% | +0.0% |
| KRASNOW, NICHOLAS R | 1 | 66.4% | +12.9% |
| KANG, EDWIN G | 1 | 64.1% | +66.6% |
| SCHLEIS, DANIEL J | 1 | 71.9% | +5.3% |
| WU, JENNY R | 1 | 63.6% | +15.9% |
| JANSSEN, REBECCA | 1 | 60.7% | +27.5% |
| WANG, NICHOLAS A | 1 | 53.5% | +22.1% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19144301 | TURBOMACHINE COMPRESSOR EXIT REGION SEAL FLOW CIRCUIT | HASAN, SABBIR | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 3 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18495814 | METHOD OF USING METAL COUPON WITH POROUS REGION FOR COMPONENT | WU, JENNY R | 68d |
| 19450121 | POROUS METAL COUPON WITH BRAZE MATERIAL INFILTRATION BARRIER FOR REPAIRING COMPONENT, COMPONENT WITH SAME AND RELATED METHOD | STONER, KILEY SHAWN | — |
| 18658035 | BUILD PLATFORM FOR ADDITIVE MANUFACTURING AND RELATED METHOD | STILES, JACOB BENJAMIN | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18399849 | COMBUSTOR WITH ADJUSTABLE AIR FLOW FOR AXIAL FUEL STAGE INJECTOR AND HEAD END FUEL NOZZLE ASSEMBLY | KANG, EDWIN G | 14d |
| 18118478 | CORROSION PITTING RESISTANT MARTENSITIC STAINLESS STEEL AND METHOD FOR MAKING SAME | WANG, NICHOLAS A | 54d |
| 18578197 | ADDITIVE MANUFACTURING SYSTEM WITH PARTIALLY FLEXIBLE BUILD PLATFORM | KRASNOW, NICHOLAS R | 62d |
| 18495814 | METHOD OF USING METAL COUPON WITH POROUS REGION FOR COMPONENT | WU, JENNY R | 68d |
| 19450121 | POROUS METAL COUPON WITH BRAZE MATERIAL INFILTRATION BARRIER FOR REPAIRING COMPONENT, COMPONENT WITH SAME AND RELATED METHOD | STONER, KILEY SHAWN | — |
| 19144301 | TURBOMACHINE COMPRESSOR EXIT REGION SEAL FLOW CIRCUIT | HASAN, SABBIR | — |
| 18495816 | METAL POROUS REGION FOR COMPONENT PRINTED ON REPLACEMENT REGION OR BASE REGION OF COMPONENT | JANSSEN, REBECCA | — |
| Client (Assignee) | Pending OAs |
|---|---|
| GE | 8 |
| GE Vernova | 1 |
| General Electric | 1 |
| Art Unit | Apps |
|---|---|
| 1733 | 3 |
| 3745 | 2 |
| 1735 | 1 |
| 1744 | 1 |
| 3741 | 1 |
| 1784 | 1 |
| 1734 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19450121 | POROUS METAL COUPON WITH BRAZE MATERIAL INFILTRATION BARRIER FOR REPAIRING COMPONENT, COMPONENT WITH SAME AND RELATED METHOD | GE Vernova Infrastructure Technology LLC | STONER, KILEY SHAWN | 1735 | §102§112 | Non-Final OA | — | Pending | Jan 15, 2026 |
| 19144301 | TURBOMACHINE COMPRESSOR EXIT REGION SEAL FLOW CIRCUIT | GE Infrastructure Technology LLC | HASAN, SABBIR | 3745 | §112 | Non-Final OA | — | Pending | Jun 27, 2025 |
| 19227934 | TURBINE BLADE UNDER-PLATFORM STRUCTURE AND POCKET | GE Infrastructure Technology LLC | REITZ, MICHAEL K. | 3745 | §103 | Final Rejection | 4d overdue | Pending | Jun 04, 2025 |
| 18658035 | BUILD PLATFORM FOR ADDITIVE MANUFACTURING AND RELATED METHOD | GE Infrastructure Technology LLC | STILES, JACOB BENJAMIN | 1733 | §103§112 | Non-Final OA | — | Pending | May 08, 2024 |
| 18578197 | ADDITIVE MANUFACTURING SYSTEM WITH PARTIALLY FLEXIBLE BUILD PLATFORM | GE Infrastructure Technology LLC | KRASNOW, NICHOLAS R | 1744 | §103 | Final Rejection | 62d | Pending | Jan 10, 2024 |
| 18399849 | COMBUSTOR WITH ADJUSTABLE AIR FLOW FOR AXIAL FUEL STAGE INJECTOR AND HEAD END FUEL NOZZLE ASSEMBLY | GE Infrastructure Technology LLC | KANG, EDWIN G | 3741 | §103 | Final Rejection | 14d | Pending | Dec 29, 2023 |
| 18495811 | METAL POROUS COUPON WITH ANCHOR FOR COMPONENT AND COMPONENT WITH SAME | GE Infrastructure Technology LLC | SCHLEIS, DANIEL J | 1784 | §103 | Final Rejection | 41d | Pending | Oct 27, 2023 |
| 18495814 | METHOD OF USING METAL COUPON WITH POROUS REGION FOR COMPONENT | GE Infrastructure Technology LLC | WU, JENNY R | 1733 | §103§112 | Final Rejection | 68d | Pending | Oct 27, 2023 |
| 18495816 | METAL POROUS REGION FOR COMPONENT PRINTED ON REPLACEMENT REGION OR BASE REGION OF COMPONENT | GE Infrastructure Technology LLC | JANSSEN, REBECCA | 1733 | §103 | Final Rejection | — | Pending | Oct 27, 2023 |
| 18118478 | CORROSION PITTING RESISTANT MARTENSITIC STAINLESS STEEL AND METHOD FOR MAKING SAME | General Electric Company | WANG, NICHOLAS A | 1734 | §103 | Non-Final OA | 54d | Pending | Mar 07, 2023 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial87.1% of resolved applications prosecuted by Hoffman Warnick - GE Vernova were allowed, across 10,662 applications in USPTO records.
2.94 office actions per allowed application on average.
10 pending office actions as of October 2026, for 3 clients, before 10 examiners in 7 art units.