6 pending office actions • 5 clients • 6 examiners • 5 art units • 0 of 6 (0%) have an AI response strategy ready • 15 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 6 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 6 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 3 (50%) |
| §112 only | 1 (17%) |
| No statute on record | 2 (33%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| BOBISH, CHRISTOPHER S | 1 | 62.2% | +29.3% |
| VARMA, ASHISH K | 1 | 74.5% | +32.6% |
| CARROLL, DAVID P. | 1 | 80.4% | +14.4% |
| BEMKO, TARAS P | 1 | 84.7% | +19.4% |
| MATTHEWS, TERRELL HOWARD | 1 | 83.8% | +11.0% |
| HILTUNEN, THOMAS J | 1 | 81.3% | +6.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19090584 | CHECK VALVE FOR DOWNHOLE GAS LINES | CARROLL, DAVID P. | 51d overdue |
| 18661665 | INTEGRATED BUILDING DESIGN, CONSTRUCTION, AND OPERATING SYSTEM USING FAULT MANAGED MICROGRID | HILTUNEN, THOMAS J | 7d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18916343 | Methods and Systems for Reducing Turbidity of Hydraulic Fracturing Sands | MATTHEWS, TERRELL HOWARD | 73d overdue |
| 19090584 | CHECK VALVE FOR DOWNHOLE GAS LINES | CARROLL, DAVID P. | 51d overdue |
| 19196604 | LINEARLY ACTUATED, PIVOTING, PUMPING UNIT | VARMA, ASHISH K | 46d overdue |
| 19223625 | High Temperature Pressure Washing System | BOBISH, CHRISTOPHER S | 2d overdue |
| 19068603 | Artificial Lift System With Under Pumping Mitigation | BEMKO, TARAS P | 9d |
| Client (Assignee) | Pending OAs |
|---|---|
| Ravdos Holdings Inc. | 2 |
| Horizon Industrial | 1 |
| Liberty Lift | 1 |
| Propflow, LLC | 1 |
| Sinclair Digital Services, Inc. | 1 |
| Art Unit | Apps |
|---|---|
| 3674 | 2 |
| 3746 | 1 |
| 3672 | 1 |
| 3653 | 1 |
| 2849 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19223625 | High Temperature Pressure Washing System | Horizon Industrial Technologies, Inc. | BOBISH, CHRISTOPHER S | 3746 | §103 | Non-Final OA | 2d overdue | Pending | May 30, 2025 |
| 19196604 | LINEARLY ACTUATED, PIVOTING, PUMPING UNIT | Ravdos Holdings, Inc. | VARMA, ASHISH K | 3674 | §103 | Non-Final OA | 46d overdue | Pending | May 01, 2025 |
| 19090584 | CHECK VALVE FOR DOWNHOLE GAS LINES | Liberty Lift Solutions, LLC | CARROLL, DAVID P. | 3674 | §112 | Non-Final OA | 51d overdue | Pending | Mar 26, 2025 |
| 19068603 | Artificial Lift System With Under Pumping Mitigation | Ravdos Holdings Inc. | BEMKO, TARAS P | 3672 | Other | Final Rejection | 9d | Pending | Mar 03, 2025 |
| 18916343 | Methods and Systems for Reducing Turbidity of Hydraulic Fracturing Sands | Propflow, LLC | MATTHEWS, TERRELL HOWARD | 3653 | Other | Final Rejection | 73d overdue | Pending | Oct 15, 2024 |
| 18661665 | INTEGRATED BUILDING DESIGN, CONSTRUCTION, AND OPERATING SYSTEM USING FAULT MANAGED MICROGRID | Sinclair Digital Services, Inc. | HILTUNEN, THOMAS J | 2849 | §103 | Final Rejection | 7d | Pending | May 12, 2024 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.