19 pending office actions • 3 clients
| Client (Assignee) | Pending OAs |
|---|---|
| Westinghouse Electric Company LLC | 17 |
| UNIVERSITY OF PITTSBURGH - OF THE COMMONWEALTH SYSTEM OF HIGHER EDUCATION | 1 |
| ETH ZÜRICH | 1 |
| App # | Title | Client | Examiner | Art Unit | Status | Filed |
|---|---|---|---|---|---|---|
| 18827710 | Untitled | Westinghouse Electric Company LLC | DUONG, THO V | 3763 | Non-Final OA | |
| 18827701 | Untitled | Westinghouse Electric Company LLC | KIM, YUNJU | 1742 | Non-Final OA | |
| 18780102 | FIXED IN-CORE DETECTOR DESIGN USING SIC SCHOTTKY DIODES CONFIGURED WITH A HIGH AXIAL AND RADIAL SENSOR DENSITY AND ENHANCED FISSION GAMMA MEASUREMENT SENSITIVITY | Westinghouse Electric Company LLC | MAUPIN, HUGH H | 2884 | Non-Final OA | Jul 22, 2024 |
| 18709397 | PRODUCING AC-225 USING GAMMA RADIATION | UNIVERSITY OF PITTSBURGH - OF THE COMMONWEALTH SYSTEM OF HIGHER EDUCATION | DAVIS, SHARON M | 3646 | Non-Final OA | May 10, 2024 |
| 18623824 | SEGMENTED FUEL ASSEMBLY FOR USE IN A NUCLEAR REACTOR | Westinghouse Electric Company LLC | DAVIS, SHARON M | 3646 | Non-Final OA | Apr 01, 2024 |
| 18623667 | HEAT PIPE HAVING A WICK BETWEEN CONCENTRIC INNER AND OUTER HOUSINGS, FOR USE IN HEAT REMOVAL FROM A NUCLEAR REACTOR CORE | Westinghouse Electric Company LLC | WASIL, DANIEL D | 3646 | Non-Final OA | Apr 01, 2024 |
| 18438427 | RADIOISOTOPE PRODUCTION TARGET FOR PRODUCING RADIOISOTOPES USING PHOTONEUTRON PRODUCTION PROCESS | Westinghouse Electric Company LLC | WASIL, DANIEL D | 3646 | Non-Final OA | Feb 10, 2024 |
| 18403897 | CORE COMPONENT RODLET WITH REATTACHMENT CAPABILITY | Westinghouse Electric Company LLC | KIL, JINNEY | 3646 | Non-Final OA | Jan 04, 2024 |
| 18403870 | Core Component Rodlet for Irradiating Isotope Targets in Pressurized Water Reactor Conditions | Westinghouse Electric Company LLC | WASIL, DANIEL D | 3646 | Non-Final OA | Jan 04, 2024 |
| 18397435 | MODULAR THERMAL AND RADIATION SHIELDING WITH PASSIVE HEAT REMOVAL | Westinghouse Electric Company LLC | WASIL, DANIEL D | 3646 | Non-Final OA | Dec 27, 2023 |
| 18509127 | RECOVERY OF URANIUM METAL USING EUTECTIC COMPOSITIONS | Westinghouse Electric Company LLC | MORALES, RICARDO D | 1738 | Non-Final OA | Nov 14, 2023 |
| 18346132 | TEMPERATURE CONTROL DEVICE SURROUNDING EQUIPMENT PENETRATING A PRESSURIZED VESSEL | Westinghouse Electric Company LLC | WASIL, DANIEL D | 3646 | Non-Final OA | Jun 30, 2023 |
| 18299588 | USE OF BURNABLE ABSORBERS IN GRAPHITE MATRIX OF TRISO-FUELED COMPACTS IN NUCLEAR CORES | Westinghouse Electric Company LLC | WASIL, DANIEL D | 3646 | Non-Final OA | Apr 12, 2023 |
| 18051925 | USE OF OXIDATION RESISTANT COATINGS TO INCREASE THIN WALLED CLADDING TENSILE STRENGTH TO INCREASE URANIUM LOADINGS | Westinghouse Electric Company LLC | WASIL, DANIEL D | 3646 | Final Rejection | Nov 02, 2022 |
| 18049343 | PRODUCTION OF RADIOISOTOPES WITH HIGHLY ENRICHED TARGET ENCLOSURE MATERIAL | Westinghouse Electric Company LLC | KEITH, JACK W | 3646 | Non-Final OA | Oct 25, 2022 |
| 17918462 | Computer-Based Simulation Methods for Boiling Water Reactors (BWR) | ETH ZÜRICH | KIL, JINNEY | 3646 | Final Rejection | Oct 12, 2022 |
| 18045562 | DEVICES, SYSTEMS, AND METHODS FOR THE ENHANCED OPERATION OF HYDRAULIC CONTROL UNITS OF A CONTROL ROD DRIVE MECHANISM TO REGULATE NUCLEAR FLUX IN A REACTOR CORE | Westinghouse Electric Company LLC | GARNER, LILY CRABTREE | 3646 | Final Rejection | Oct 11, 2022 |
| 17756955 | METHOD AND APPARATUS EMPLOYING VANADIUM NEUTRON DETECTORS | Westinghouse Electric Company LLC | KIL, JINNEY | 3646 | Non-Final OA | Jun 06, 2022 |
| 17597454 | USE OF ENDOTHERMIC MATERIALS IN ICE CONDENSER CONTAINMENTS | Westinghouse Electric Company LLC | WASIL, DANIEL D | 3646 | Final Rejection | Jan 06, 2022 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial