Tech Center 3600 • Art Units: 2878 3646
This examiner grants 47% of resolved cases
Jinney Kil, an examiner in Tech Center 3600 and Art Unit 2878, has handled 196 resolved cases with an allowance rate of 46.9. The median days to allowance is 1119, indicating the timeline for successful applications. The 1119-day figure is a benchmark for practitioners to use when setting expectations for the duration of the patent grant process.
The data highlights an interview lift of 53.2. This suggests that conducting an interview increases the likelihood of allowance compared to the 46.9 baseline rate. For the 196 resolved cases processed, the 53.2 lift is a critical strategic lever for practitioners to utilize. By prioritizing direct communication, applicants can improve their chances of success and more effectively navigate the 1119-day median path to allowance. The data indicates that verbal advocacy is a vital tool with this examiner.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18780238 | SYSTEMS FOR PERIODICALLY MEASURING THE TOTAL GAMMA RADIATION ACTIVITY OF A TARGET RADIOISOTOPE BEING PRODUCED INSIDE THE CORE OF A NUCLEAR REACTOR | Final Rejection | Westinghouse Electric Company LLC |
| 18403897 | CORE COMPONENT RODLET WITH REATTACHMENT CAPABILITY | Non-Final OA | Westinghouse Electric Company LLC |
| 18487360 | METHOD FOR CONTINUALLY MONITORING THE CONDITION OF NUCLEAR REACTOR INTERNALS | Final Rejection | Westinghouse Electric Company LLC |
| 17759415 | UNIVERSAL REACTOR VESSEL HEAD INSPECTION PLATFORM ASSEMBLY | Final Rejection | Westinghouse Electric Company LLC |
| 17756955 | METHOD AND APPARATUS EMPLOYING VANADIUM NEUTRON DETECTORS | Final Rejection | Westinghouse Electric Company LLC |
| 17918462 | Computer-Based Simulation Methods for Boiling Water Reactors (BWR) | Non-Final OA | ETH ZURICH |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy