Prosecution Insights
Last updated: May 29, 2026

Westinghouse Electric Company LLC

17 pending office actions • 5 art units • 9 examiners • 0 of 17 (0%) have an AI response strategy ready • 23 patents granted in the last 365 days

Portfolio Summary

17
Total Pending OAs
12
Non-Final OAs
3
Final Rejections
2
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 17 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

8
Overdue
0
Due this week
6
Due this month
3
Due in next 60 days
0
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 17 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (8)Due ≤ 30 days (6)Due ≤ 60 days (3)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

0
Hard (0%)
15
Medium (88%)
1
Easy (6%)
1
Unknown (6%)

Rejection Statute Mix

BucketCases
§103 only15 (88%)
§112 only1 (6%)
No statute on record1 (6%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

2
Life Sciences
12% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
1
Semiconductors
6% of docket
14
Mechanical / Eng
82% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

170 h
Manual time on pending OAs
34 h
Time saved (low, 20%)
59 h
Time saved (mid, 35%)
1.5 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
WASIL, DANIEL D 6 79.8% +24.8%
KIL, JINNEY 3 46.4% +53.1%
DAVIS, SHARON M 2 68.0% +27.4%
MAUPIN, HUGH H 1 87.5% +6.3%
MORALES, RICARDO D 1 81.4% +16.7%
LING, FOR K. 1 53.6% +19.1%
KEITH, JACK W 1 16.3% +8.0%
GARNER, LILY CRABTREE 1 68.1% +15.2%
SMITH, CATHERINE P 1 16.1% +12.3%

Quick Wins (2)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
18509127 RECOVERY OF URANIUM METAL USING EUTECTIC COMPOSITIONS MORALES, RICARDO D 10d overdue
18780102 FIXED IN-CORE DETECTOR DESIGN USING SIC SCHOTTKY DIODES CONFIGURED WITH A HIGH AXIAL AND RADIAL SENSOR DENSITY AND ENHANCED FISSION GAMMA MEASUREMENT SENSITIVITY MAUPIN, HUGH H 15d

Hard Cases (2)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.

App #TitleExaminerDue in
18049343 PRODUCTION OF RADIOISOTOPES WITH HIGHLY ENRICHED TARGET ENCLOSURE MATERIAL KEITH, JACK W 171d overdue
17594803 IMPROVED CORROSION RESISTANCE OF ADDITIVELY-MANUFACTURED ZIRCONIUM ALLOYS SMITH, CATHERINE P 50d overdue

Interview Candidates (15)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18049351 IRRADIATION TARGET ASSEMBLY GARNER, LILY CRABTREE 139d overdue
17597454 USE OF ENDOTHERMIC MATERIALS IN ICE CONDENSER CONTAINMENTS WASIL, DANIEL D 112d overdue
18253982 CHROMIUM ALLOYS FOR COATING NUCLEAR FUEL RODS DAVIS, SHARON M 50d overdue
17594803 IMPROVED CORROSION RESISTANCE OF ADDITIVELY-MANUFACTURED ZIRCONIUM ALLOYS SMITH, CATHERINE P 50d overdue
18509127 RECOVERY OF URANIUM METAL USING EUTECTIC COMPOSITIONS MORALES, RICARDO D 10d overdue
18623824 SEGMENTED FUEL ASSEMBLY FOR USE IN A NUCLEAR REACTOR DAVIS, SHARON M 5d overdue
18299588 USE OF BURNABLE ABSORBERS IN GRAPHITE MATRIX OF TRISO-FUELED COMPACTS IN NUCLEAR CORES WASIL, DANIEL D 3d overdue
18403870 Core Component Rodlet for Irradiating Isotope Targets in Pressurized Water Reactor Conditions WASIL, DANIEL D 12d

Top Art Units

Art UnitApps
3646 13
2884 1
1738 1
3763 1
1735 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
18780102 FIXED IN-CORE DETECTOR DESIGN USING SIC SCHOTTKY DIODES CONFIGURED WITH A HIGH AXIAL AND RADIAL SENSOR DENSITY AND ENHANCED FISSION GAMMA MEASUREMENT SENSITIVITY MAUPIN, HUGH H 2884 §103 Non-Final OA 15d Pending Jul 22, 2024
18623667 HEAT PIPE HAVING A WICK BETWEEN CONCENTRIC INNER AND OUTER HOUSINGS, FOR USE IN HEAT REMOVAL FROM A NUCLEAR REACTOR CORE WASIL, DANIEL D 3646 §103 Non-Final OA 22d Pending Apr 01, 2024
18623824 SEGMENTED FUEL ASSEMBLY FOR USE IN A NUCLEAR REACTOR DAVIS, SHARON M 3646 §103 Non-Final OA 5d overdue Pending Apr 01, 2024
18403870 Core Component Rodlet for Irradiating Isotope Targets in Pressurized Water Reactor Conditions WASIL, DANIEL D 3646 §112 Non-Final OA 12d Pending Jan 04, 2024
18509127 RECOVERY OF URANIUM METAL USING EUTECTIC COMPOSITIONS MORALES, RICARDO D 1738 §103 Non-Final OA 10d overdue Pending Nov 14, 2023
18487360 METHOD FOR CONTINUALLY MONITORING THE CONDITION OF NUCLEAR REACTOR INTERNALS KIL, JINNEY 3646 §103 Non-Final OA 55d Pending Oct 16, 2023
18467395 MULTI-MATERIAL PRINTED HEAT EXCHANGER PRODUCED BY DIFFUSION BONDING LING, FOR K. 3763 §103 Final Rejection 53d Pending Sep 14, 2023
18346132 TEMPERATURE CONTROL DEVICE SURROUNDING EQUIPMENT PENETRATING A PRESSURIZED VESSEL WASIL, DANIEL D 3646 §103 Non-Final OA 21d Pending Jun 30, 2023
18253982 CHROMIUM ALLOYS FOR COATING NUCLEAR FUEL RODS DAVIS, SHARON M 3646 §103 Non-Final OA 50d overdue Pending May 23, 2023
18299588 USE OF BURNABLE ABSORBERS IN GRAPHITE MATRIX OF TRISO-FUELED COMPACTS IN NUCLEAR CORES WASIL, DANIEL D 3646 §103 Non-Final OA 3d overdue Pending Apr 12, 2023
18051925 USE OF OXIDATION RESISTANT COATINGS TO INCREASE THIN WALLED CLADDING TENSILE STRENGTH TO INCREASE URANIUM LOADINGS WASIL, DANIEL D 3646 §103 Final Rejection 14d Pending Nov 02, 2022
18049343 PRODUCTION OF RADIOISOTOPES WITH HIGHLY ENRICHED TARGET ENCLOSURE MATERIAL KEITH, JACK W 3646 Non-Final OA 171d overdue Pending Oct 25, 2022
18049351 IRRADIATION TARGET ASSEMBLY GARNER, LILY CRABTREE 3646 §103 Non-Final OA 139d overdue Pending Oct 25, 2022
17905704 HIGH TEMPERATURE HYDRIDE MODERATOR ENABLING COMPACT AND HIGHER POWER DENSITY CORES IN NUCLEAR MICRO-REACTORS KIL, JINNEY 3646 §103 Non-Final OA 49d Pending Sep 06, 2022
17756955 METHOD AND APPARATUS EMPLOYING VANADIUM NEUTRON DETECTORS KIL, JINNEY 3646 §103 Non-Final OA 14d Pending Jun 06, 2022
17597454 USE OF ENDOTHERMIC MATERIALS IN ICE CONDENSER CONTAINMENTS WASIL, DANIEL D 3646 §103 Final Rejection 112d overdue Pending Jan 06, 2022
17594803 IMPROVED CORROSION RESISTANCE OF ADDITIVELY-MANUFACTURED ZIRCONIUM ALLOYS SMITH, CATHERINE P 1735 §103 Non-Final OA 50d overdue Pending Oct 29, 2021

Managing Westinghouse Electric Company LLC's Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month