Technology area: Semiconductors, Circuits & Optics
14 pending office actions • 6 art units • 13 examiners • 0 of 14 (0%) have an AI response strategy ready • 78 patents granted in the last 365 days
Delta Electronics (Shanghai) Co., Ltd. has 15 pending office actions in Semiconductors, Circuits & Optics. The matters are assigned to 14 distinct examiners across 7 distinct art units, indicating a dispersed examiner structure within a more concentrated art-unit environment. Counsel can use art-unit comparisons to identify recurring issues, while treating examiner interactions separately.
LIAN, MANG TIN BIK is the busiest examiner, with 2 pending actions. The limited examiner concentration does not support relying on one examiner relationship for portfolio-wide planning. A coordinated art-unit review, combined with application-specific response drafting, is better aligned with the available profile.
Based on the USPTO statutory response window for each pending office action. 1 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 2 (14%) |
| §102 only | 4 (29%) |
| Multi-statute (no §101) | 8 (57%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| LIAN, MANG TIN BIK | 2 | 70.4% | +26.0% |
| LAM, ALEX W | 1 | 91.7% | +2.1% |
| FINCH III, FRED E | 1 | 80.2% | +17.2% |
| CHOI, SEUNG HO | 1 | 100.0% | +0.0% |
| CORDOVA RODRIGUEZ, ULARISLAO | 1 | 88.0% | +13.6% |
| JACKSON, LAKAISHA | 1 | 85.3% | +12.1% |
| BEHM, HARRY RAYMOND | 1 | 79.6% | +7.3% |
| ROSARIO BENITEZ, GUSTAVO A | 1 | 81.5% | +24.8% |
| MIKELS, MATTHEW | 1 | 81.2% | +20.1% |
| TSO, STANLEY | 1 | 75.5% | +34.3% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18619056 | POWER CONVERSION SYSTEM AND CONTROL METHOD THEREOF | ROSARIO BENITEZ, GUSTAVO A | 79d |
| 19060468 | METHOD FOR CONTROLLING POWER CONVERTER AND POWER CONVERTER | CHOI, SEUNG HO | — |
| 19000580 | POWER CONTROL DEVICE AND POWER CONTROL METHOD | CORDOVA RODRIGUEZ, ULARISLAO | — |
| 18914332 | CONTROL METHOD FOR RESONANT CONVERTER AND RESONANT CONVERTER | JACKSON, LAKAISHA | — |
| 18613148 | BATTERY ENERGY STORAGE SYSTEM | MIKELS, MATTHEW | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19312504 | POWER SYSTEM, DC COUPLING DEVICE AND CONTROL METHOD THEREOF | LAM, ALEX W | — |
| 19243737 | NON-ISOLATED HYBRID RESONANCE CIRCUIT | FINCH III, FRED E | — |
| 18774955 | CHAIN-LINK CONVERTER | BEHM, HARRY RAYMOND | — |
| 18621061 | INTEGRATED MAGNETIC ELEMENT | LIAN, MANG TIN BIK | — |
| 18417914 | ON-BOARD CHARGER | TSO, STANLEY | — |
| 18487135 | TRANSFORMER MODULE AND POWER MODULE | TRINH, MINH N | — |
| 18360839 | PLANAR MAGNETIC ELEMENT AND MANUFACTURING METHOD THEREOF | LIAN, MANG TIN BIK | — |
| 18220798 | MAGNETIC ELEMENT AND MANUFACTURING METHOD THEREOF | LEGASPI, EUGENE REY DEVERA | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18619056 | POWER CONVERSION SYSTEM AND CONTROL METHOD THEREOF | ROSARIO BENITEZ, GUSTAVO A | 79d |
| 19243737 | NON-ISOLATED HYBRID RESONANCE CIRCUIT | FINCH III, FRED E | — |
| 19000580 | POWER CONTROL DEVICE AND POWER CONTROL METHOD | CORDOVA RODRIGUEZ, ULARISLAO | — |
| 18914332 | CONTROL METHOD FOR RESONANT CONVERTER AND RESONANT CONVERTER | JACKSON, LAKAISHA | — |
| 18621061 | INTEGRATED MAGNETIC ELEMENT | LIAN, MANG TIN BIK | — |
| 18613148 | BATTERY ENERGY STORAGE SYSTEM | MIKELS, MATTHEW | — |
| 18417914 | ON-BOARD CHARGER | TSO, STANLEY | — |
| 18360839 | PLANAR MAGNETIC ELEMENT AND MANUFACTURING METHOD THEREOF | LIAN, MANG TIN BIK | — |
| Art Unit | Apps |
|---|---|
| 2838 | 5 |
| 2837 | 3 |
| 2859 | 2 |
| 2836 | 1 |
| 2847 | 1 |
| 3729 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19312504 | POWER SYSTEM, DC COUPLING DEVICE AND CONTROL METHOD THEREOF | LAM, ALEX W | 2836 | §102§103 | Non-Final OA | — | Pending | Aug 28, 2025 |
| 19243737 | NON-ISOLATED HYBRID RESONANCE CIRCUIT | FINCH III, FRED E | 2838 | §102§103 | Non-Final OA | — | Pending | Jun 20, 2025 |
| 19060468 | METHOD FOR CONTROLLING POWER CONVERTER AND POWER CONVERTER | CHOI, SEUNG HO | 2838 | §102 | Non-Final OA | — | Pending | Feb 21, 2025 |
| 19000580 | POWER CONTROL DEVICE AND POWER CONTROL METHOD | CORDOVA RODRIGUEZ, ULARISLAO | 2838 | §103 | Non-Final OA | — | Pending | Dec 23, 2024 |
| 18914332 | CONTROL METHOD FOR RESONANT CONVERTER AND RESONANT CONVERTER | JACKSON, LAKAISHA | — | §102 | Non-Final OA | — | Pending | Oct 14, 2024 |
| 18774955 | CHAIN-LINK CONVERTER | BEHM, HARRY RAYMOND | 2838 | §102§103 | Non-Final OA | — | Pending | Jul 17, 2024 |
| 18621061 | INTEGRATED MAGNETIC ELEMENT | LIAN, MANG TIN BIK | 2837 | §102§103§112 | Final Rejection | — | Pending | Mar 28, 2024 |
| 18619056 | POWER CONVERSION SYSTEM AND CONTROL METHOD THEREOF | ROSARIO BENITEZ, GUSTAVO A | 2838 | §103 | Non-Final OA | 79d | Pending | Mar 27, 2024 |
| 18613148 | BATTERY ENERGY STORAGE SYSTEM | MIKELS, MATTHEW | 2859 | §102 | Non-Final OA | — | Pending | Mar 22, 2024 |
| 18417914 | ON-BOARD CHARGER | TSO, STANLEY | 2847 | §102§103 | Non-Final OA | — | Pending | Jan 19, 2024 |
| 18523788 | ENERGY STORAGE SYSTEM AND CONTROL METHOD THEREOF | FANTU, YALKEW | 2859 | §102 | Non-Final OA | — | Pending | Nov 29, 2023 |
| 18487135 | TRANSFORMER MODULE AND POWER MODULE | TRINH, MINH N | 3729 | §103§112 | Non-Final OA | — | Pending | Oct 16, 2023 |
| 18360839 | PLANAR MAGNETIC ELEMENT AND MANUFACTURING METHOD THEREOF | LIAN, MANG TIN BIK | 2837 | §102§103§112 | Non-Final OA | — | Pending | Jul 28, 2023 |
| 18220798 | MAGNETIC ELEMENT AND MANUFACTURING METHOD THEREOF | LEGASPI, EUGENE REY DEVERA | 2837 | §103§112 | Non-Final OA | — | Pending | Jul 11, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialDelta Electronics (Shanghai) Co., Ltd. has 14 pending office actions as of October 2026, spread across 6 art units and 13 examiners.
Mang Tin Bik Lian has the most, with 2 of Delta Electronics (Shanghai) Co., Ltd.'s pending office actions.
Mostly Semiconductors, Circuits & Optics (USPTO Tech Center 2800), based on where its pending office actions are examined.