Listed by the USPTO as FINCH III, FRED E
Tech Center 2800 • Art Units: 2836 2838 2896
This examiner grants 80% of resolved cases
FINCH III, FRED E is assigned to Tech Center 2800 and Art Unit 2836. Across 924 resolved cases, the allowance rate is 80.2%, while the median time to allowance is 900 days. This record reflects substantial case volume and a generally favorable allowance outcome, with prosecution extending beyond a two-year period at the median.
Interviews correspond to a 17.2% lift in allowance outcomes, making interview preparation a material consideration in prosecution strategy. Huawei Technologies, NXP Semiconductors, and Mitsubishi Electric appear among the listed companies. The listed firms are Muncy, Geissler, Olds & Lowe, Ruggiero McAllister & McMahon, and CKC & Partners.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 19041750 | DIRECT CURRENT POWER CONVERTER AND DIRECT CURRENT POWER CONVERSION SYSTEM | Non-Final OA | Huawei Digital Power Technologies Co., Ltd. |
| 18632206 | POWER CONVERTER, POWER ADAPTER, ELECTRONIC DEVICE, AND POWER CONVERSION METHOD | Final Rejection | Huawei Digital Power Technologies Co., Ltd. |
| 18475728 | POWER CONVERSION DEVICE | Non-Final OA | Mitsubishi Electric Corporation |
| 19102362 | MULTI-MODE POWER CONVERTERS WITH SHARED COMPONENTS | Non-Final OA | Murata Manufacturing Co., Ltd. |
| 19077945 | RESONANT CONVERTER | Non-Final OA | DELTA ELECTRONICS, INC. |
| 18884289 | SWITCHING POWER SUPPLY | Non-Final OA | ROHM CO., LTD. |
| 19038799 | DUAL OUTPUT VOLTAGE CONVERSION CIRCUIT IN A POWER MANAGEMENT CIRCUIT | Non-Final OA | Qorvo US, Inc. |
| 19186105 | POWER SUPPLY SYSTEM | Non-Final OA | Richtek Technology Corporation |
| 19036794 | BUCK-BOOST REGULATOR WITH PASS THROUGH MODE AND THE METHOD THEREOF | Non-Final OA | Chengdu Monolithic Power Systems Co., Ltd. |
| 19046608 | SWITCHING STAGE OF A SWITCHED MODE POWER SUPPLY, SMPS, AS WELL AS AN SMPS AND CORRESPONDING METHOD | Non-Final OA | NEXPERIA B.V. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy80.2% of resolved applications examined by Fred E Finch III were allowed (924 resolved cases), compared with 66.2% across Art Unit 2836 over the last five years.
This examiner's interview lift is +17.2 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Fred E Finch III took 900 days on average from filing to allowance.
Fred E Finch III examines applications in Art Unit 2836 in Tech Center 2800 (Semiconductors, Circuits & Optics).