Technology area: Medical Devices & Mechanical Engineering
17 pending office actions • 14 art units • 16 examiners • 0 of 17 (0%) have an AI response strategy ready • 26 patents granted in the last 365 days
DOOSAN ENERBILITY CO., LTD. has 16 pending office actions in Medical Devices & Mechanical Engineering. The matters involve 15 distinct examiners across 14 distinct art units, indicating broad dispersion and limited repetition in both examination personnel and technical classifications. A matter-level workflow with technical grouping should fit the available portfolio structure.
PRUITT, JUSTIN A is the busiest examiner, with 2 pending matters. That small cluster permits targeted comparison of prosecution treatment, but it does not represent the overall docket. Counsel should maintain examiner-specific preparation while monitoring the separate art-unit assignments.
Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 1 (6%) |
| §103 only | 9 (53%) |
| §112 only | 1 (6%) |
| Multi-statute (no §101) | 6 (35%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| PRUITT, JUSTIN A | 2 | 62.0% | +15.1% |
| HAGHIGHIAN, BEHNOUSH | 1 | 78.8% | +12.7% |
| SEBASCO CHENG, STEPHANIE | 1 | 58.6% | +71.1% |
| GARFT, CHRISTOPHER | 1 | 59.0% | +23.2% |
| IRVIN, THOMAS W | 1 | 77.5% | +14.5% |
| BODNARK, MATTHEW JAMES | 1 | 85.0% | +23.1% |
| KIM, TAE JUN | 1 | 63.9% | +25.8% |
| ZHENG, LOIS L | 1 | 67.6% | +13.0% |
| SIDDIQUEE, TAMEEM | 1 | 62.7% | +37.1% |
| PARENT, ALEXANDER RENE | 1 | 56.3% | +15.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18964007 | APPARATUS AND METHOD FOR MEASURING THICKNESS OF PIPE BASED ON IMAGE ANALYSIS | BODNARK, MATTHEW JAMES | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18408342 | METHOD FOR MANUFACTURING A BLADE FOR A GAS TURBINE, TURBINE BLADE, AND GAS TURBINE | PRUITT, JUSTIN A | 58d overdue |
| 19390689 | TURBINE HAVING GUIDE BAFFLE AND GAS TURBINE INCLUDING SAME | HAGHIGHIAN, BEHNOUSH | — |
| 19357272 | GAS TURBINE | SEBASCO CHENG, STEPHANIE | — |
| 18976641 | VIBRATION REDUCTION DEVICE AND NUCLEAR POWER PLANT CABINET USING SAME | IRVIN, THOMAS W | — |
| 18392027 | ROTARY TYPE CAPACITIVE DEIONIZATION APPARATUS | PARENT, ALEXANDER RENE | — |
| 18518483 | DEVICE FOR DETERMINING OPERATIONAL STATUS OF SENSOR AND METHOD THEREOF | JACKSON, JORDAN L | — |
| 18482850 | METHOD OF REMOVING FOREIGN SUBSTANCES FROM CRDM AND DEVICE FOR EXECUTING SAME | DAVIS, SHARON M | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18408342 | METHOD FOR MANUFACTURING A BLADE FOR A GAS TURBINE, TURBINE BLADE, AND GAS TURBINE | PRUITT, JUSTIN A | 58d overdue |
| 18408763 | FLOW BODY FOR A GAS TURBINE, GAS TURBINE, METHOD FOR MANUFACTURING A FLOW BODY FOR A GAS TURBINE, AND METHOD FOR REPAIRING A FLOW BODY OF A GAS TURBINE | PRUITT, JUSTIN A | 6d |
| 18677242 | GAS TURBINE PLANT WITH AMMONIA DECOMPOSITION SYSTEM | KIM, TAE JUN | 27d |
| 19390689 | TURBINE HAVING GUIDE BAFFLE AND GAS TURBINE INCLUDING SAME | HAGHIGHIAN, BEHNOUSH | — |
| 19357272 | GAS TURBINE | SEBASCO CHENG, STEPHANIE | — |
| 19048310 | ENVIRONMENTAL FACILITY SUPPORTING STRUCTURE OF VERTICAL HEAT RECOVERY STEAM GENERATOR | GARFT, CHRISTOPHER | — |
| 18976641 | VIBRATION REDUCTION DEVICE AND NUCLEAR POWER PLANT CABINET USING SAME | IRVIN, THOMAS W | — |
| 18964007 | APPARATUS AND METHOD FOR MEASURING THICKNESS OF PIPE BASED ON IMAGE ANALYSIS | BODNARK, MATTHEW JAMES | — |
| Art Unit | Apps |
|---|---|
| 3745 | 3 |
| 3741 | 1 |
| 4100 | 1 |
| 3616 | 1 |
| 2668 | 1 |
| 3799 | 1 |
| 2116 | 1 |
| 1795 | 1 |
| 2857 | 1 |
| 3646 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19390689 | TURBINE HAVING GUIDE BAFFLE AND GAS TURBINE INCLUDING SAME | HAGHIGHIAN, BEHNOUSH | 3745 | §102§103§112 | Non-Final OA | — | Pending | Nov 17, 2025 |
| 19357272 | GAS TURBINE | SEBASCO CHENG, STEPHANIE | 3741 | §102§112 | Non-Final OA | — | Pending | Oct 14, 2025 |
| 19048310 | ENVIRONMENTAL FACILITY SUPPORTING STRUCTURE OF VERTICAL HEAT RECOVERY STEAM GENERATOR | GARFT, CHRISTOPHER | 4100 | §103 | Final Rejection | — | Pending | Feb 07, 2025 |
| 18976641 | VIBRATION REDUCTION DEVICE AND NUCLEAR POWER PLANT CABINET USING SAME | IRVIN, THOMAS W | 3616 | §102§103 | Non-Final OA | — | Pending | Dec 11, 2024 |
| 18964007 | APPARATUS AND METHOD FOR MEASURING THICKNESS OF PIPE BASED ON IMAGE ANALYSIS | BODNARK, MATTHEW JAMES | 2668 | §103 | Non-Final OA | — | Pending | Nov 29, 2024 |
| 18677242 | GAS TURBINE PLANT WITH AMMONIA DECOMPOSITION SYSTEM | KIM, TAE JUN | 3799 | §103 | Final Rejection | 27d | Pending | May 29, 2024 |
| 18623029 | SYSTEM FOR RECOVERING LITHIUM OF WASTE CATHODE MATERIAL | ZHENG, LOIS L | — | §112 | Non-Final OA | — | Pending | Apr 01, 2024 |
| 18610365 | DEVICE AND METHOD FOR PREDICTING EXHAUST EMISSIONS ON BASIS OF DATA ANALYSIS | SIDDIQUEE, TAMEEM | 2116 | §103 | Non-Final OA | — | Pending | Mar 20, 2024 |
| 18408763 | FLOW BODY FOR A GAS TURBINE, GAS TURBINE, METHOD FOR MANUFACTURING A FLOW BODY FOR A GAS TURBINE, AND METHOD FOR REPAIRING A FLOW BODY OF A GAS TURBINE | PRUITT, JUSTIN A | 3745 | §103 | Final Rejection | 6d | Pending | Jan 10, 2024 |
| 18408342 | METHOD FOR MANUFACTURING A BLADE FOR A GAS TURBINE, TURBINE BLADE, AND GAS TURBINE | PRUITT, JUSTIN A | 3745 | §103§112 | Final Rejection | 58d overdue | Pending | Jan 09, 2024 |
| 18392027 | ROTARY TYPE CAPACITIVE DEIONIZATION APPARATUS | PARENT, ALEXANDER RENE | 1795 | §102§103§112Other | Non-Final OA | — | Pending | Dec 21, 2023 |
| 18518483 | DEVICE FOR DETERMINING OPERATIONAL STATUS OF SENSOR AND METHOD THEREOF | JACKSON, JORDAN L | 2857 | §101§102§103 | Final Rejection | — | Pending | Nov 23, 2023 |
| 18482850 | METHOD OF REMOVING FOREIGN SUBSTANCES FROM CRDM AND DEVICE FOR EXECUTING SAME | DAVIS, SHARON M | 3646 | §103§112 | Final Rejection | — | Pending | Oct 07, 2023 |
| 18468710 | ANNOTATION DEVICE AND ANNOTATION METHOD | HERNANDEZ, ALEJANDRO | 2661 | §103 | Non-Final OA | — | Pending | Sep 17, 2023 |
| 18351569 | COMBINED REFORMER | KUYKENDALL, ALYSSA LEE | 1774 | §103 | Final Rejection | — | Pending | Jul 13, 2023 |
| 18331253 | ULTRASONIC FLAW-DETECTION SYSTEM AND ULTRASONIC FLAW-DETECTION METHOD | SHOEMAKER, ERIC JAMES | 2664 | §103 | Final Rejection | 22d | Pending | Jun 08, 2023 |
| 18068036 | DEVICE AND METHOD FOR SELECTING OPTIMAL WATER TREATMENT MODEL FOR CHEMICAL DOSING OPTIMIZATION | WONG, WILLIAM | 2144 | §103 | Non-Final OA | 13d | Pending | Dec 19, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialDOOSAN ENERBILITY CO., LTD. has 17 pending office actions as of October 2026, spread across 14 art units and 16 examiners.
Justin A Pruitt has the most, with 2 of DOOSAN ENERBILITY CO., LTD.'s pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.