Listed by the USPTO as SIDDIQUEE, TAMEEM
Tech Center 3700 • Art Units: 1717 2116 2118 2178 3792
This examiner grants 63% of resolved cases
SIDDIQUEE, TAMEEM works in tech center 3700 and art unit 1717. The profile shows 241 resolved cases, an allowance rate of 62.7%, and a median of 1169 days to allowance. The 37.1% interview lift is prominent relative to the allowance rate as a percentage measure, making interviews a potentially important part of prosecution planning. The 1169-day median indicates extended observed timing.
The leading companies are Daikin Industries Ltd., Hitachi Ltd., and Reon Technology Inc. The associated firms are Adams Intellex, PLC, OBLON, MCCLELLAND, MAIER & NEUSTADT, L.L.P., and Spencer Fane LLP. Counsel handling matters in art unit 1717 can use the recurring names to identify relevant experience, while treating the allowance and interview figures as separate planning signals.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 19025133 | SEMICONDUCTOR PROCESSING SYSTEM | Non-Final OA | SAMSUNG ELECTRONICS CO., LTD. |
| 18783562 | METHOD OF MANUFACTURING THREE-DIMENSIONAL SHAPED ARTICLE | Non-Final OA | SEIKO EPSON CORPORATION |
| 18946350 | METHOD FOR PREDICTING ELECTRIC ENERGY CONSUMPTION IN AN ELECTRIC GRID | Non-Final OA | ABB S.p.A |
| 19369555 | SYSTEMS AND METHODS FOR ANALYZING OBJECTIVE INFORMATION PERTAINING TO THE PERFORMANCE OF A PATIENT PERFORMING A TREATMENT PLAN AND FOR MODIFYING THE TREATMENT PLAN USING AI/ML | Final Rejection | ROM Technologies, Inc. |
| 18409318 | DISCRETE-TIME LOAD FREQUENCY CONTROLLER FOR HYBRID RENEWABLE POWER SYSTEM | Non-Final OA | KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS |
| 18867270 | ABNORMAL-VIBRATION-PREDICTING METHOD FOR ROLL GRINDER, ROLLING-ROLL-GRINDING METHOD, METAL-STRIP-ROLLING METHOD, ABNORMAL-VIBRATION-PREDICTING DEVICE FOR ROLL GRINDER, AND ROLL-GRINDING APPARATUS | Non-Final OA | JFE STEEL CORPORATION |
| 18834281 | PRODUCTION MANAGEMENT SYSTEM, PRODUCTION MANAGEMENT METHOD, AND PROGRAM | Non-Final OA | OMRON Corporation |
| 18937991 | AIR CONDITIONER | Non-Final OA | DAIKIN INDUSTRIES, LTD. |
| 18542371 | AIR CONDITIONER, AIR-CONDITIONING SYSTEM, COMMUNICATION SYSTEM, AND DEVICE MANAGEMENT SYSTEM | Final Rejection | DAIKIN INDUSTRIES, LTD. |
| 18695072 | COOPERATIVE MANAGEMENT SYSTEM AND COOPERATIVE MANAGEMENT METHOD | Final Rejection | Hitachi, Ltd. |
| 18027751 | Power Management Device and Power Management Method | Non-Final OA | Hitachi, Ltd. |
| 18025021 | SELECTIVE LASER SINTERING OF POLYMERIC POWDERS EMBEDDED WITH WATER-SOLUBLE FLOW ADDITIVES | Final Rejection | Evonik Operations GmbH |
| 18240117 | AGRICULTURAL LIQUID INJECTION SYSTEM | Non-Final OA | CNH Industrial America LLC |
| 18942147 | AN ENERGY MANAGEMENT SYSTEM AND METHOD FOR OPTIMIZING ELECTRIC LOADS TO MAXIMIZE POWER BACKUP DURATION | Non-Final OA | GM Global Technology Operations LLC |
| 18767451 | SUBSTRATE PROCESSING APPARATUS | Non-Final OA | SEMES CO., LTD. |
| 18814501 | DISTRIBUTED POWER SYSTEM FOR MANAGEMENT AND CONTROL | Non-Final OA | REON Technology, Inc. |
| 18385439 | BATTERY MANAGEMENT SYSTEM WITH CONTROLLED REPLACEMENT | Final Rejection | REON Technology, Inc. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy62.7% of resolved applications examined by Tameem Siddiquee were allowed (241 resolved cases), compared with 49.3% across Art Unit 1717 over the last five years.
This examiner's interview lift is +37.1 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Tameem Siddiquee took 1,169 days on average from filing to allowance.
Tameem Siddiquee examines applications in Art Unit 1717 in Tech Center 3700 (Medical Devices & Mechanical Engineering).