Listed by the USPTO as KUYKENDALL, ALYSSA LEE
Tech Center 1700 • Art Units: 1692 1732 1736 1774
This examiner grants 18% of resolved cases
KUYKENDALL, ALYSSA LEE works in tech center 1700 and art unit 1692. The profile includes 27 resolved cases, an allowance rate of 18.5%, and a median of 1367 days to allowance. The interview lift is 75.5%, indicating a strong positive association between interviews and allowance outcomes in the reported record, despite the reported allowance rate.
The listed companies are Kia Corporation, LG Energy Solution Ltd., and Commissariat à l'Énergie Atomique et aux Énergies Alternatives. The listed firms are OBLON, MCCLELLAND, MAIER & NEUSTADT, L.L.P., MCDONNELL BOEHNEN HULBERT & BERGHOFF LLP, and Anderson Patent Law Firm LLC. Interview preparation is a central practical consideration for this docket.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 17722228 | DEPLOYABLE HYDROGEN REACTOR | Final Rejection | Massachusetts Institute of Technology |
| 18725882 | NEGATIVE ELECTRODE FOR LITHIUM SECONDARY BATTERY, AND LITHIUM SECONDARY BATTERY COMPRISING NEGATIVE ELECTRODE | Non-Final OA | LG ENERGY SOLUTION, LTD. |
| 18284193 | Electrode Assembly Laminating Roller | Non-Final OA | LG Energy Solution, Ltd. |
| 17632769 | REUSABLE DIHYDROGEN GENERATOR | Final Rejection | COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES |
| 18245469 | FIXED-BED TUBULAR REACTOR | Non-Final OA | COMMISSARIAT À L'ÉNERGIE ATOMIQUE ET AUX ÉNERGIES ALTERNATIVES |
| 18521315 | COMPONENTS, ASSEMBLIES, AND DEVICES HAVING A CATALYST | Non-Final OA | General Electric Company |
| 17881571 | METHOD AND APPARATUS FOR PRODUCING HYDROGEN GAS | Non-Final OA | KIA CORPORATION |
| 17881575 | APPARATUS FOR PRODUCING HYDROGEN GAS | Final Rejection | KIA CORPORATION |
| 17844945 | HYDROGEN REFORMING SYSTEM | Final Rejection | Kia Corporation |
| 18487357 | SEPARATOR, PREPARATION METHOD THEREOF, AND RELATED SECONDARY BATTERY AND ELECTRICAL APPARATUS | Non-Final OA | CONTEMPORARY AMPEREX TECHNOLOGY (HONG KONG) LIMITED |
| 18487525 | BATTERY SAFETY MONITOR | Non-Final OA | Baker Hughes Oilfield Operations LLC |
| 17755333 | Method for operating a descending moving bed reactor with flowable granular material | Final Rejection | thyssenkrupp Uhde GmbH |
| 18518617 | REACTOR APPARATUS, VINYL-BASED POLYMER MANUFACTURING METHOD, CONTROL APPARATUS, AND AGITATION APPARATUS | Non-Final OA | Shin-Etsu Chemical Co., Ltd. |
| 18019545 | GAS MANUFACTURING DEVICE, GAS MANUFACTURING SYSTEM, AND GAS MANUFACTURING METHOD | Non-Final OA | SEKISUI CHEMICAL CO., LTD. |
| 18473508 | GASEOUS FUEL PRODUCTION SYSTEM | Non-Final OA | NATIONAL CHENG KUNG UNIVERSITY |
| 18030354 | Solvent Recirculation System | Final Rejection | LG Chem, Ltd. |
| 18017856 | FINE OBJECT SEPARATION DEVICE AND FINE OBJECT SEPARATION METHOD USING FINE OBJECT SEPARATION DEVICE | Non-Final OA | INDUSTRY-UNIVERSITY COOPERATION FOUNDATION HANYANG UNIVERSITY ERICA CAMPUS |
| 17719307 | ACOUSTOFLUIDIC CENTRIFUGE FOR NANOPARTICLE ENRICHMENT AND SEPARATION | Non-Final OA | Duke University |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy18.5% of resolved applications examined by Alyssa Lee Kuykendall were allowed (27 resolved cases), compared with 71.8% across Art Unit 1692 over the last five years.
This examiner's interview lift is +75.5 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Alyssa Lee Kuykendall took 1,367 days on average from filing to allowance.
Alyssa Lee Kuykendall examines applications in Art Unit 1692 in Tech Center 1700 (Chemistry & Materials).