Technology areas: Chemistry & Materials • Medical Devices & Mechanical Engineering
3 pending office actions • 3 art units • 3 examiners • 0 of 3 (0%) have an AI response strategy ready • 3 patents granted in the last 365 days
GE Aerospace Poland Sp Z O O is currently managing 2 pending office actions in the Medical Devices & Mechanical Engineering technology area. These matters are distributed across 2 distinct examiners and 2 distinct art units. The busiest examiner, KIM, TAE JUN, is responsible for 1 pending office action.
The distribution of 2 pending office actions across 2 distinct art units suggests that the company's mechanical engineering filings cover different specialized sub-fields. Because there are 2 distinct examiners involved, the prosecution experience is split, with each examiner handling 1 pending office action. KIM, TAE JUN is one of these 2 distinct examiners.
Practitioners should be aware that the 2 pending office actions will be subject to different examination styles and art unit policies. With 1 pending office action assigned to KIM, TAE JUN, there is no concentration of workload under a single examiner. The 2 distinct art units within Medical Devices & Mechanical Engineering indicate that the company must navigate multiple sets of technical standards simultaneously.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 1 (33%) |
| Multi-statute (no §101) | 2 (67%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| PARIHAR, PRADHUMAN | 1 | 56.5% | +21.0% |
| KIM, TAE JUN | 1 | 64.0% | +25.7% |
| TANENBAUM, TZVI SAMUEL | 1 | 68.4% | +9.6% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18607677 | FAULT TOLERANT THERMAL MANAGEMENT SYSTEM FOR HYBRID ELECTRIC SYSTEM | KIM, TAE JUN | — |
| 18607660 | AIRCRAFT ENGINE HYBRID ELECTRIC THERMAL MANAGEMENT SYSTEM | TANENBAUM, TZVI SAMUEL | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19232365 | METHOD OF CLEANING COKE FROM AN ENGINE COMPONENT | PARIHAR, PRADHUMAN | — |
| 18607677 | FAULT TOLERANT THERMAL MANAGEMENT SYSTEM FOR HYBRID ELECTRIC SYSTEM | KIM, TAE JUN | — |
| Art Unit | Apps |
|---|---|
| 1714 | 1 |
| 3799 | 1 |
| 3763 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19232365 | METHOD OF CLEANING COKE FROM AN ENGINE COMPONENT | PARIHAR, PRADHUMAN | 1714 | §103 | Non-Final OA | — | Pending | Jun 09, 2025 |
| 18607677 | FAULT TOLERANT THERMAL MANAGEMENT SYSTEM FOR HYBRID ELECTRIC SYSTEM | KIM, TAE JUN | 3799 | §102§103 | Non-Final OA | — | Pending | Mar 18, 2024 |
| 18607660 | AIRCRAFT ENGINE HYBRID ELECTRIC THERMAL MANAGEMENT SYSTEM | TANENBAUM, TZVI SAMUEL | 3763 | §102§103 | Non-Final OA | — | Pending | Mar 18, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial