Tech Center 3700 • Art Units: 3744 3763
This examiner grants 68% of resolved cases
Tzvi Samuel Tanenbaum has resolved 790 cases in Art Unit 3744. The allowance rate is 68.4 percent, indicating a moderate level of success for applicants. The median days to allowance is 986, which is a standard benchmark for prosecution. This 986-day figure is a primary indicator in Tech Center 3700.
The interview lift of 9.6 percent is modest but positive. It suggests that while interviews are beneficial, the examiner's 68.4 percent baseline tendency is the primary driver of outcomes. With 790 cases resolved, these metrics represent a consistent pattern of behavior. Practitioners can use the 9.6 percent lift to refine their strategy. The 986-day median provides a realistic timeline for reaching a grant. Direct engagement is a recommended approach.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18881552 | VARIABLE LENGTH FIN HEAT EXCHANGER AND CORRESPONDING TURBOMACHINE | Non-Final OA | SAFRAN |
| 19103625 | STORAGE CHAMBER | Non-Final OA | LG ELECTRONICS INC. |
| 18828191 | IMMERSION COOLING TANK AND IMMERSION COOLING SYSTEM INCLUDING THE SAME | Non-Final OA | Delta Electronics, Inc. |
| 18720220 | HEAT PUMP METHOD AND HEAT PUMP ARRANGEMENT | Non-Final OA | Linde GmbH |
| 18921756 | STIRLING CYCLE HEAT PUMP WITH ACTUATED REGENERATOR AND INTEGRATED DISPLACER | Final Rejection | Raytheon Company |
| 18741005 | ENVIRONMENTAL CONTROL SYSTEM WITH INTEGRATED VAPOR COMPRESSION SYSTEM AND AIR CYCLE MACHINE | Non-Final OA | Hamilton Sundstrand Corporation |
| 18570223 | COOLING COMPONENT AND DEVICE | Non-Final OA | NEC Platforms, Ltd. |
| 18430388 | HEAT DISSIPATION STRUCTURE | Final Rejection | ASIA VITAL COMPONENTS (CHINA) CO., LTD. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy