Prosecution Insights
Last updated: May 29, 2026

LONGI GREEN ENERGY TECHNOLOGY CO., LTD.

12 pending office actions • 3 art units • 11 examiners • 0 of 12 (0%) have an AI response strategy ready • 15 patents granted in the last 365 days

Portfolio Summary

12
Total Pending OAs
11
Non-Final OAs
1
Final Rejections
0
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 12 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

5
Overdue
0
Due this week
5
Due this month
2
Due in next 60 days
0
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 12 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (5)Due ≤ 30 days (5)Due ≤ 60 days (2)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

0
Hard (0%)
11
Medium (92%)
1
Easy (8%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only11 (92%)
§112 only1 (8%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

12
Life Sciences
100% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
0
Semiconductors
0% of docket
0
Mechanical / Eng
0% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

120 h
Manual time on pending OAs
24 h
Time saved (low, 20%)
42 h
Time saved (mid, 35%)
1.1 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
AYAD, TAMIR 2 42.0% +48.8%
WHITE, SADIE 1 48.7% +32.7%
PILLAY, DEVINA 1 44.1% +26.7%
GOLDEN, ANDREW J 1 42.1% +39.0%
MALLEY JR., DANIEL PATRICK 1 56.8% +46.3%
DAM, DUSTIN Q 1 21.6% +25.0%
CHERN, CHRISTINA 1 38.5% +41.4%
DINH, BACH T 1 55.2% +32.1%
MOWLA, GOLAM 1 61.3% +28.9%
CARLSON, KOURTNEY SALZMAN 1 44.0% +40.6%

Hard Cases (1)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 1 ordered by deadline are shown.

App #TitleExaminerDue in
19097523 SOLAR CELL AND PHOTOVOLTAIC MODULE DAM, DUSTIN Q 13d

Interview Candidates (11)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18843234 SOLAR CELL, PREPARATION METHOD THEREFOR, AND PHOTOVOLTAIC MODULE MOWLA, GOLAM 112d overdue
19043624 BACK CONTACT SOLAR CELL AND METHOD FOR MANUFACTURING THE SAME AYAD, TAMIR 46d overdue
18710315 PEROVSKITE-CRYSTALLINE SILICON TANDEM CELL COMPRISING CARRIER TRANSPORT LAYER HAVING RESISTANCE-INCREASING NANO STRUCTURE CARLSON, KOURTNEY SALZMAN 38d overdue
19089274 SOLAR CELL, PHOTOVOLTAIC MODULE, AND MANUFACTURING METHOD THEREFOR DINH, BACH T 4d overdue
19097421 SOLAR CELL AND PHOTOVOLTAIC MODULE CHERN, CHRISTINA 9d
19097523 SOLAR CELL AND PHOTOVOLTAIC MODULE DAM, DUSTIN Q 13d
19144809 BACK CONTACT SOLAR CELL AND PHOTOVOLTAIC MODULE GOLDEN, ANDREW J 22d
19221231 BACK CONTACT SOLAR CELL AND PHOTOVOLTAIC MODULE MALLEY JR., DANIEL PATRICK 27d

Top Art Units

Art UnitApps
1726 7
1721 4
1722 1

Pending Office Actions

App #TitleExaminerArt UnitStatutesStatusDue inAIFiled
19149194 BACK CONTACT SOLAR CELL, METHOD FOR MANUFACTURING SAME, AND PHOTOVOLTAIC MODULE WHITE, SADIE 1721 §103 Non-Final OA 35d Pending Jul 18, 2025
19147450 SOLAR CELL, SOLAR CELL STRING, AND PHOTOVOLTAIC MODULE PILLAY, DEVINA 1726 §103 Non-Final OA 54d Pending Jul 11, 2025
19144809 BACK CONTACT SOLAR CELL AND PHOTOVOLTAIC MODULE GOLDEN, ANDREW J 1726 §103 Non-Final OA 22d Pending Jun 30, 2025
19221231 BACK CONTACT SOLAR CELL AND PHOTOVOLTAIC MODULE MALLEY JR., DANIEL PATRICK 1726 §103 Non-Final OA 27d Pending May 28, 2025
19214735 BACK CONTACT SOLAR CELL AND MANUFACTURING METHOD THEREOF, AND PHOTOVOLTAIC MODULE AYAD, TAMIR 1726 §103 Non-Final OA 30d Pending May 21, 2025
19097523 SOLAR CELL AND PHOTOVOLTAIC MODULE DAM, DUSTIN Q 1721 §103 Non-Final OA 13d Pending Apr 01, 2025
19097421 SOLAR CELL AND PHOTOVOLTAIC MODULE CHERN, CHRISTINA 1722 §112 Non-Final OA 9d Pending Apr 01, 2025
19089274 SOLAR CELL, PHOTOVOLTAIC MODULE, AND MANUFACTURING METHOD THEREFOR DINH, BACH T 1726 §103 Non-Final OA 4d overdue Pending Mar 25, 2025
19043624 BACK CONTACT SOLAR CELL AND METHOD FOR MANUFACTURING THE SAME AYAD, TAMIR 1726 §103 Non-Final OA 46d overdue Pending Feb 03, 2025
18843234 SOLAR CELL, PREPARATION METHOD THEREFOR, AND PHOTOVOLTAIC MODULE MOWLA, GOLAM 1726 §103 Non-Final OA 112d overdue Pending Aug 30, 2024
18710315 PEROVSKITE-CRYSTALLINE SILICON TANDEM CELL COMPRISING CARRIER TRANSPORT LAYER HAVING RESISTANCE-INCREASING NANO STRUCTURE CARLSON, KOURTNEY SALZMAN 1721 §103 Non-Final OA 38d overdue Pending May 15, 2024
18688055 COLOR TANDEM PHOTOVOLTAIC DEVICE MERSHON, JAYNE L 1721 §103 Final Rejection 105d overdue Pending Feb 29, 2024

Managing LONGI GREEN ENERGY TECHNOLOGY CO., LTD.'s Patent Portfolio?

IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month