Technology area: Semiconductors, Circuits & Optics
25 pending office actions • 14 art units • 24 examiners • 0 of 25 (0%) have an AI response strategy ready • 36 patents granted in the last 365 days
Sungrow Power Supply Co., Ltd. has 25 pending office actions in Semiconductors, Circuits & Optics. The docket covers 24 distinct examiners and 15 art units, indicating broad examiner distribution and repeated matters within the art-unit structure. The examiner count is close to the pending-action count, while the smaller art-unit count supports art-unit-based docket management.
ZHANG, JUE is the busiest examiner, with 2 pending matters. That repeated assignment provides a defined opportunity to compare examination treatment, but it does not represent the broader portfolio. Counsel should coordinate semiconductor and circuit claim themes across the docket while tracking each art unit and examiner separately.
Based on the USPTO statutory response window for each pending office action. 7 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 7 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 7 (28%) |
| §102 only | 3 (12%) |
| Multi-statute (no §101) | 15 (60%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| ZHANG, JUE | 2 | 83.3% | +10.0% |
| LEE, CHEE-CHONG | 1 | 64.3% | +52.5% |
| SAN MARTIN, EDGARDO | 1 | 76.0% | +6.6% |
| PATEL, DHARTI HARIDAS | 1 | 87.3% | +7.7% |
| HANSEN, JAMES ORVILLE | 1 | 70.5% | +21.8% |
| LY, XUAN | 1 | 85.5% | +6.5% |
| TRAN, NGUYEN | 1 | 83.6% | +7.6% |
| SOILEAU, JONATHAN WALTER | 1 | 92.6% | +9.1% |
| NGUYEN, THUY-VI THI | 1 | 51.9% | +11.3% |
| SWEET, JOSHUA JAMES | 1 | 75.0% | +30.8% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19028216 | PHOTOVOLTAIC INVERTER AND METHOD FOR CONTROLLING PHOTOVOLTAIC INVERTER | LY, XUAN | — |
| 18994555 | CONTROL METHOD AND CONTROL CIRCUIT FOR BIDIRECTIONAL RESONANT DIRECT-CURRENT CONVERTER | TRAN, NGUYEN | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18271842 | START METHOD FOR PHOTOVOLTAIC RAPID SHUTDOWN SYSTEM, APPLICATION APPARATUS AND SYSTEM | THOMAS, LUCY M | 67d overdue |
| 18114443 | PHASE-CHANGE HEAT DISSIPATER AND POWER MODULE | SCHERMERHORN, JON | 32d overdue |
| 18931092 | ENERGY STORAGE CONVERTER, AND ENERGY STORAGE SYSTEM | CAVALLARI, DANIEL | 14d |
| 18764412 | POWER SUPPLY CIRCUIT, BATTERY MONITORING CIRCUIT, AND ENERGY STORAGE DEVICE | NGUYEN, DANNY | 23d |
| 18432362 | HEAT EXCHANGER AND ELECTRONIC DEVICE | LANE, DEVON | 56d |
| 19120119 | SELF-CHECKING-BASED FIRE-FIGHTING AIR INTAKE AND DISCHARGE CONTROL SYSTEM, AND CONTROL METHOD | LEE, CHEE-CHONG | — |
| 19110279 | SILENCING AIR DUCT DEVICE AND CHARGING PILE | SAN MARTIN, EDGARDO | — |
| 19107523 | PHOTOVOLTAIC SYSTEM AND CONTROL METHOD | PATEL, DHARTI HARIDAS | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19120119 | SELF-CHECKING-BASED FIRE-FIGHTING AIR INTAKE AND DISCHARGE CONTROL SYSTEM, AND CONTROL METHOD | LEE, CHEE-CHONG | — |
| 19062432 | ENERGY STORAGE CABINET | HANSEN, JAMES ORVILLE | — |
| 18876627 | BUCK-BOOST CONVERTER AND POWER SUPPLY SYSTEM | ZHANG, JUE | — |
| 18979690 | CONTROL METHOD, INVERTER, AND PHOTOVOLTAIC SYSTEM | NGUYEN, THUY-VI THI | — |
| 18958218 | DIRECT-CURRENT COUPLING SYSTEM AND CHARGING CONTROL METHOD THEREFOR | SWEET, JOSHUA JAMES | — |
| 18863299 | ISOLATED MATRIX CONVERTER AND CONTROL METHOD | ZHANG, JUE | — |
| Art Unit | Apps |
|---|---|
| 2838 | 8 |
| 2836 | 3 |
| 3752 | 2 |
| 3763 | 2 |
| 2837 | 1 |
| 3637 | 1 |
| 3656 | 1 |
| 2412 | 1 |
| 2858 | 1 |
| 2831 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19120119 | SELF-CHECKING-BASED FIRE-FIGHTING AIR INTAKE AND DISCHARGE CONTROL SYSTEM, AND CONTROL METHOD | LEE, CHEE-CHONG | 3752 | §102§103§112 | Non-Final OA | — | Pending | Apr 10, 2025 |
| 19110279 | SILENCING AIR DUCT DEVICE AND CHARGING PILE | SAN MARTIN, EDGARDO | 2837 | §102§103 | Non-Final OA | — | Pending | Mar 10, 2025 |
| 19107523 | PHOTOVOLTAIC SYSTEM AND CONTROL METHOD | PATEL, DHARTI HARIDAS | 2838 | §102§103§112 | Non-Final OA | — | Pending | Feb 27, 2025 |
| 19062432 | ENERGY STORAGE CABINET | HANSEN, JAMES ORVILLE | 3637 | §102§103 | Non-Final OA | — | Pending | Feb 25, 2025 |
| 19028216 | PHOTOVOLTAIC INVERTER AND METHOD FOR CONTROLLING PHOTOVOLTAIC INVERTER | LY, XUAN | 2836 | §102 | Final Rejection | — | Pending | Jan 17, 2025 |
| 18994555 | CONTROL METHOD AND CONTROL CIRCUIT FOR BIDIRECTIONAL RESONANT DIRECT-CURRENT CONVERTER | TRAN, NGUYEN | 2838 | §103 | Non-Final OA | — | Pending | Jan 14, 2025 |
| 19003071 | INVERTER, CONTROL METHOD OF INVERTER, AND POWER SYSTEM | SOILEAU, JONATHAN WALTER | 2838 | §102§103 | Non-Final OA | — | Pending | Dec 27, 2024 |
| 18876627 | BUCK-BOOST CONVERTER AND POWER SUPPLY SYSTEM | ZHANG, JUE | 2838 | §102§103§112 | Non-Final OA | — | Pending | Dec 18, 2024 |
| 18979690 | CONTROL METHOD, INVERTER, AND PHOTOVOLTAIC SYSTEM | NGUYEN, THUY-VI THI | 3656 | §102 | Non-Final OA | — | Pending | Dec 13, 2024 |
| 18958218 | DIRECT-CURRENT COUPLING SYSTEM AND CHARGING CONTROL METHOD THEREFOR | SWEET, JOSHUA JAMES | 2836 | §103 | Non-Final OA | — | Pending | Nov 25, 2024 |
| 18954879 | PHOTOVOLTAIC DISTRIBUTION NETWORK SYSTEM AND NETWORK CONFIGURATION METHOD FOR PHOTOVOLTAIC DISTRIBUTION NETWORK SYSTEM | KHAWAR, SAAD | 2412 | §103 | Non-Final OA | — | Pending | Nov 21, 2024 |
| 18864828 | COMBINER DEVICE, PHOTOVOLTAIC SYSTEM AND FAULT DETECTION METHOD | NGUYEN, TRUNG Q | 2858 | §103§112 | Non-Final OA | — | Pending | Nov 11, 2024 |
| 18863299 | ISOLATED MATRIX CONVERTER AND CONTROL METHOD | ZHANG, JUE | 2838 | §102§103 | Non-Final OA | — | Pending | Nov 05, 2024 |
| 18931092 | ENERGY STORAGE CONVERTER, AND ENERGY STORAGE SYSTEM | CAVALLARI, DANIEL | 2836 | §102§112 | Final Rejection | 14d | Pending | Oct 30, 2024 |
| 18820320 | ENERGY STORAGE APPARATUS AND ENERGY STORAGE SYSTEM | CERNOCH, STEVEN MICHAEL | 3752 | §103 | Non-Final OA | — | Pending | Aug 30, 2024 |
| 18832888 | PHOTOVOLTAIC CONNECTOR | CHAMBERS, TRAVIS SLOAN | 2831 | §102 | Non-Final OA | — | Pending | Jul 24, 2024 |
| 18764412 | POWER SUPPLY CIRCUIT, BATTERY MONITORING CIRCUIT, AND ENERGY STORAGE DEVICE | NGUYEN, DANNY | 2838 | §102§103 | Final Rejection | 23d | Pending | Jul 05, 2024 |
| 18692466 | ENERGY STORAGE BATTERY SYSTEM | MENDOZA, KENT GREGORY | 1754 | §102§103 | Non-Final OA | — | Pending | Mar 15, 2024 |
| 18685857 | INVERTER AND DIRECT-CURRENT SWITCH ASSEMBLY | FAUBERT, SAMANTHA LYNETTE | 2838 | §103 | Final Rejection | 60d overdue | Pending | Feb 22, 2024 |
| 18432362 | HEAT EXCHANGER AND ELECTRONIC DEVICE | LANE, DEVON | 3763 | §102§103 | Non-Final OA | 56d | Pending | Feb 05, 2024 |
| 18578688 | WORKING MODE SWITCHING CONTROL METHOD AND DEVICE FOR VEHICLE-MOUNTED CHARGER, AND VEHICLE-MOUNTED CHARGER | ST CYR, DANIEL | 2876 | §103 | Non-Final OA | — | Pending | Jan 11, 2024 |
| 18501912 | IV CURVE SCANNING METHOD AND DEVICE FOR MULTI-INPUT CONVERTER | HARRISON, MICHAEL A | 2852 | §102§103 | Non-Final OA | — | Pending | Nov 03, 2023 |
| 18271842 | START METHOD FOR PHOTOVOLTAIC RAPID SHUTDOWN SYSTEM, APPLICATION APPARATUS AND SYSTEM | THOMAS, LUCY M | 2838 | §102§103Other | Final Rejection | 67d overdue | Pending | Jul 11, 2023 |
| 18114443 | PHASE-CHANGE HEAT DISSIPATER AND POWER MODULE | SCHERMERHORN, JON | 3763 | §102§103 | Final Rejection | 32d overdue | Pending | Feb 27, 2023 |
| 18105287 | PERFORMANCE TESTING DEVICE FOR HEAT PIPE HEATSINK | QUIGLEY, KYLE ROBERT | 2857 | §103 | Final Rejection | 17d overdue | Pending | Feb 03, 2023 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialSungrow Power Supply Co., Ltd. has 25 pending office actions as of October 2026, spread across 14 art units and 24 examiners.
Jue Zhang has the most, with 2 of Sungrow Power Supply Co., Ltd.'s pending office actions.
Mostly Semiconductors, Circuits & Optics (USPTO Tech Center 2800), based on where its pending office actions are examined.