Listed by the USPTO as HARRINGTON, ALYSON JOAN
Tech Center 3700 • Art Units: 3741
This examiner grants 75% of resolved cases
HARRINGTON, ALYSON JOAN works in Tech Center 3700 and Art Unit 3741. Across 197 resolved cases, the profile records a 74.6% allowance rate and a median of 981 days to allowance. The case volume is smaller than many established examiner records, but it provides a defined outcome pattern for practitioners to consider.
The interview lift is 61.0%, indicating a strong positive association between interviews and allowance. The leading companies are Rolls-Royce plc, GE Avio S.r.l., and General Electric Company. The listed firms are HAUPTMAN HAM, LLP, OLIFF PLC, and Alumen IP Law PC. The data supports giving interviews substantial strategic attention, while recognizing that the allowance rate and interview lift measure different aspects of the record.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18782306 | STAGED COMBUSTOR | Final Rejection | Rolls-Royce plc |
| 18753161 | GAS TURBINE HEAT EXCHANGER | Final Rejection | ROLLS-ROYCE plc |
| 18667616 | VEHICLE ELECTRICAL POWER SYNCHRONIZATION VIA HYDRAULICS | Non-Final OA | Rolls-Royce North American Technologies, Inc. |
| 18741088 | Thrust Reverser Mounting Assembly | Final Rejection | The Boeing Company |
| 19033730 | GAS TURBINE ENGINE INCLUDING FLOW TURNING COMBUSTOR | Non-Final OA | General Electric Company |
| 18536610 | HEAT SHIELD FOR A GAS TURBINE ENGINE | Final Rejection | General Electric Company |
| 18512587 | FUEL SUPPLY SYSTEM AND FUEL SUPPLY METHOD FOR GAS TURBINE COGENERATION SYSTEM | Final Rejection | MITSUBISHI HEAVY INDUSTRIES, LTD. |
| 18640211 | BOTTOMING CYCLE FOR POWER GENERATION AND ENGINE THERMAL MANAGEMENT | Non-Final OA | RTX Corporation |
| 18423820 | INJECTOR WITH SWIRLER FOR HYDROGEN-DRIVEN GAS TURBINE ENGINE | Final Rejection | PRATT & WHITNEY CANADA CORP. |
| 18242184 | Laser Cleaning Used Component of Substrate Processing Chamber | Final Rejection | Applied Materials, Inc. |
| 18460595 | METHOD FOR PRODUCING POWER STORAGE DEVICE | Final Rejection | Prime Planet Energy & Solutions, Inc. |
| 17631772 | OSCILLATING LASER WELDING WITH FILLER WIRES FOR JOINTING ALUMINUM ALLOY SHEETS WITH A LARGE GAP THEREBETWEEN | Final Rejection | BEIJING UNIVERSITY OF TECHNOLOGY |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy74.6% of resolved applications examined by Alyson Joan Harrington were allowed (197 resolved cases), compared with 62.4% across Art Unit 3741 over the last five years.
This examiner's interview lift is +61.0 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Alyson Joan Harrington took 981 days on average from filing to allowance.
Alyson Joan Harrington examines applications in Art Unit 3741 in Tech Center 3700 (Medical Devices & Mechanical Engineering).