Prosecution Insights
Last updated: October 25, 2026

Haynes Boone (61658)

Technology area: Semiconductors, Circuits & Optics

25 pending office actions • 2 clients • 23 examiners • 14 art units • 0 of 25 (0%) have an AI response strategy ready

Analysis

Haynes Boone (61658) has 25 pending office actions in Semiconductors, Circuits & Optics and 29,392 career applications. The entry identifies an active semiconductor-focused workload within a broad historical filing record.

The resolved allowance rate is 91.71%, and the average number of office actions per allowance is 3.46. These measures give outcome and examination-effort context, although the profile does not separate this entry’s results from the broader application record.

Practitioners can use the profile to assess current activity and the firm-level prosecution history. Matter-specific claim, examiner, and timing information is not included.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Quality Metrics (n=29392 apps, methodology: how we score firms)

91.7%
Allowance Rate
n=29392
+0.61σ
Allowance Rate (norm)
n=29392
3.5
OAs to Allowance
n=19996
-0.07σ
OAs to Allow (norm)
n=19996
1001 days
Time to Allowance
n=19996
+4.5pp
Interview Lift
n=29392
29.8%
RCE Rate
n=29392
1.4%
Appeal Rate
n=29392

Rejection Performance (% of received rejections ultimately overcome)

83.8%
§101 Overcome
n=2971
85.9%
§102 Overcome
n=7909
86.0%
§103 Overcome
n=12499
86.6%
§112 Overcome
n=6823

Specialization & Scale

H01L, H10D, G06F
Top CPC Subclasses
25%
Top-3 CPC Share
n=29392
90
Practitioners
n=29392
326.6
Apps / Practitioner
n=29392

Portfolio Summary

25
Total Pending OAs
15
Non-Final OAs
10
Final Rejections
0
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

2
Overdue
0
Due this week
2
Due this month
1
Due in next 60 days
0
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (2)Due ≤ 30 days (2)Due ≤ 60 days (1)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

11
Hard (44%)
9
Medium (36%)
2
Easy (8%)
3
Unknown (12%)

Rejection Statute Mix

BucketCases
§101 + other1 (4%)
§103 only6 (24%)
§102 only1 (4%)
§112 only2 (8%)
Double-patenting + other2 (8%)
Multi-statute (no §101)10 (40%)
No statute on record3 (12%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
0
Information Tech
0% of docket
2
Communications
8% of docket
23
Semiconductors
92% of docket
0
Mechanical / Eng
0% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

250 h
Manual time on pending OAs
50 h
Time saved (low, 20%)
88 h
Time saved (mid, 35%)
2.2 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
FINCH III, FRED E 2 80.2% +17.2%
WELLS, KENNETH B 2 86.3% +2.2%
O NEILL, PATRICK 1 83.5% +17.3%
TIKU, SISAY G 1 91.5% +9.1%
MEHARI, YEMANE 1 89.3% +6.5%
ROSARIO BENITEZ, GUSTAVO A 1 81.5% +24.8%
BEHM, HARRY RAYMOND 1 79.6% +7.3%
ALMO, KHAREEM E 1 87.4% +5.8%
TRAN, BINH BACH THANH 1 81.0% +12.0%
WENDELL, ANDREW 1 84.2% +12.0%

Quick Wins (4)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 4 ordered by deadline are shown.

App #TitleExaminerDue in
18827039 GATE RESISTIVE LADDER BYPASS FOR RF FET SWITCH STACK WELLS, KENNETH B 36d overdue
19102362 MULTI-MODE POWER CONVERTERS WITH SHARED COMPONENTS FINCH III, FRED E —
19031219 DC-DC TRANSFORMER WITH INDUCTOR FOR THE FACILITATION OF ADIABATIC INTER-CAPACITOR CHARGE TRANSPORT MEHARI, YEMANE —
19017326 AC Coupling Modules for Bias Ladders WELLS, KENNETH B —

Hard Cases (11)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18510899 SYSTEMS AND METHODS FOR ESTIMATING OUTPUT CURRENT OF A CHARGE PUMP NAVARRO, HUGO IVAN 18d overdue
19060481 Efficient Bootstrap Supply Generators for Multi-Level Power Converters O NEILL, PATRICK —
19039729 POWER CONVERTER TIKU, SISAY G —
19029649 SWITCHED CAPACITORS FOR AC-DC APPLICATIONS ROSARIO BENITEZ, GUSTAVO A —
18893873 METHODS, APPARATUSES, INTEGRATED CIRCUITS, AND PRINTED CIRCUIT BOARDS FOR POWER CONVERSION WITH REDUCED PARASITICS TRAN, BINH BACH THANH —
18664214 REFERENCE SIGNAL ANTENNA SWITCHING FOR RADIO FREQUENCY FRONT END SYSTEMS AND METHODS WENDELL, ANDREW —
18643857 SUPPRESSION OF REBALANCING CURRENTS IN A SWITCHED-CAPACITOR NETWORK HILTUNEN, THOMAS J —
18404866 AREA EFFECTIVE HEAT SINK LIU, MIKKA H —

Interview Candidates (6)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 6 ordered by deadline are shown.

App #TitleExaminerDue in
18606319 SWITCHED-CAPACITOR CIRCUIT CONTROL IN POWER CONVERTERS FINCH III, FRED E 20d
19060481 Efficient Bootstrap Supply Generators for Multi-Level Power Converters O NEILL, PATRICK —
19102362 MULTI-MODE POWER CONVERTERS WITH SHARED COMPONENTS FINCH III, FRED E —
19029649 SWITCHED CAPACITORS FOR AC-DC APPLICATIONS ROSARIO BENITEZ, GUSTAVO A —
18893873 METHODS, APPARATUSES, INTEGRATED CIRCUITS, AND PRINTED CIRCUIT BOARDS FOR POWER CONVERSION WITH REDUCED PARASITICS TRAN, BINH BACH THANH —
18664214 REFERENCE SIGNAL ANTENNA SWITCHING FOR RADIO FREQUENCY FRONT END SYSTEMS AND METHODS WENDELL, ANDREW —

Client Portfolio (2 clients)

Client (Assignee)Pending OAs
Murata 24
Murata Manufactunng Co., Ltd. 1

Top Art Units

Art UnitApps
28386
28364
28423
28182
28491
28471
26481
26461
28931
28171

Pending Office Actions

App #TitleClientExaminerArt UnitStatutesStatusDue inAIFiled
19060481 Efficient Bootstrap Supply Generators for Multi-Level Power Converters Murata Manufacturing Co., Ltd. O NEILL, PATRICK 2836 §102§112Other Final Rejection — Pending Feb 21, 2025
19102362 MULTI-MODE POWER CONVERTERS WITH SHARED COMPONENTS Murata Manufacturing Co., Ltd. FINCH III, FRED E 2838 §102 Non-Final OA — Pending Feb 07, 2025
19039729 POWER CONVERTER Murata Manufacturing Co., Ltd. TIKU, SISAY G 2838 §101§112Other Non-Final OA — Pending Jan 28, 2025
19031219 DC-DC TRANSFORMER WITH INDUCTOR FOR THE FACILITATION OF ADIABATIC INTER-CAPACITOR CHARGE TRANSPORT Psemi Corporation MEHARI, YEMANE 2838 §103 Non-Final OA — Pending Jan 17, 2025
19029649 SWITCHED CAPACITORS FOR AC-DC APPLICATIONS Psemi Corporation ROSARIO BENITEZ, GUSTAVO A 2838 §102§103 Non-Final OA — Pending Jan 17, 2025
19031034 PUMP CAPACITOR CONFIGURATION FOR SWITCHED CAPACITOR CIRCUITS Psemi Corporation BEHM, HARRY RAYMOND 2838 Other Non-Final OA — Pending Jan 17, 2025
19017326 AC Coupling Modules for Bias Ladders Psemi Corporation WELLS, KENNETH B 2836 §103 Final Rejection — Pending Jan 10, 2025
18964292 METHODS AND DEVICES FOR FAST SWITCHING OF RADIO FREQUENCY SWITCHES Psemi Corporation ALMO, KHAREEM E 2849 Other Non-Final OA 41d Pending Nov 29, 2024
18893873 METHODS, APPARATUSES, INTEGRATED CIRCUITS, AND PRINTED CIRCUIT BOARDS FOR POWER CONVERSION WITH REDUCED PARASITICS Murata Manufacturing Co., Ltd. TRAN, BINH BACH THANH 2847 §102§103 Non-Final OA — Pending Sep 23, 2024
18827039 GATE RESISTIVE LADDER BYPASS FOR RF FET SWITCH STACK Psemi Corporation WELLS, KENNETH B 2842 §103§112DP Final Rejection 36d overdue Pending Sep 06, 2024
18664214 REFERENCE SIGNAL ANTENNA SWITCHING FOR RADIO FREQUENCY FRONT END SYSTEMS AND METHODS Psemi Corporation WENDELL, ANDREW 2648 §102§103 Final Rejection — Pending May 14, 2024
18643857 SUPPRESSION OF REBALANCING CURRENTS IN A SWITCHED-CAPACITOR NETWORK Murata Manufacturing Co., Ltd. HILTUNEN, THOMAS J 2836 §102§103Other Final Rejection — Pending Apr 23, 2024
18640862 METHOD AND APPARATUS FOR USE IN IMPROVING LINEARITY OF MOSFETS USING AN ACCUMULATED CHARGE SINK Psemi Corporation NGUYEN, NIKI HOANG 2818 §102DP Non-Final OA — Pending Apr 19, 2024
18606319 SWITCHED-CAPACITOR CIRCUIT CONTROL IN POWER CONVERTERS Psemi Corporation FINCH III, FRED E 2838 Other Final Rejection 20d Pending Mar 15, 2024
18605576 METHODS AND APPARATUS FOR REDUCING SWITCHING TIME OF RF FET SWITCHING DEVICES Psemi Corporation VO, NGUYEN THANH 2646 §112 Non-Final OA — Pending Mar 14, 2024
18600443 MULTILAYER CERAMIC CAPACITORS (MLCC) ARRAY AND INTEGRATION WITH ACTIVE DEVICES Murata Manufacturing Co., Ltd. YECHURI, SITARAMARAO S 2893 §103 Final Rejection — Pending Mar 08, 2024
18409152 GATE RESISTOR BYPASS FOR RF FET SWITCH STACK Psemi Corporation NGUYEN, LONG T 2842 §112 Non-Final OA 20d Pending Jan 10, 2024
18408508 DIODE AND TRANSISTOR DEVICES AND FABRICATION TECHNIQUES Murata Manufactunng Co., Ltd. PARK, SAMUEL 2818 §103 Final Rejection — Pending Jan 09, 2024
18406435 START-UP OF STEP-UP POWER CONVERTER WITH SWITCHED-CAPACITOR NETWORK Psemi Corporation CHEN, PATRICK C 2842 §103 Final Rejection — Pending Jan 08, 2024
18404866 AREA EFFECTIVE HEAT SINK Murata Manufacturing Co., Ltd. LIU, MIKKA H 2817 §102§103§112 Non-Final OA — Pending Jan 04, 2024
18402497 INTEGRATED CIRCUIT PACKAGES FOR FACILITATING POWER CONVERTER SYSTEMS AND METHODS Murata Manufacturing Co., Ltd. REIDA, MOLLY KAY 2899 §102§103 Non-Final OA — Pending Jan 02, 2024
18510899 SYSTEMS AND METHODS FOR ESTIMATING OUTPUT CURRENT OF A CHARGE PUMP Psemi Corporation NAVARRO, HUGO IVAN 2858 §103§112 Non-Final OA 18d overdue Pending Nov 16, 2023
18489623 HYBRID POWER CONVERTERS, LATERAL DEVICES, VERTICAL DEVICES, MULTIPLE COPPER CLIPS, REPLICA DEVICES Murata Manufacturing Co., Ltd. MALEK, MALIHEH 2813 §102§103 Non-Final OA — Pending Oct 18, 2023
18451542 Shallow Trench Isolation using Porous Semiconductor Murata Manufacturing Co., Ltd. HOSSAIN, MOAZZAM 2898 §103 Final Rejection — Pending Aug 17, 2023
18446462 POWER CONVERTERS AND METHODS FOR CHARGING AND DISCHARGING A BATTERY Murata Manufacturing Co., Ltd. CAVALLARI, DANIEL 2836 §103§112 Non-Final OA — Pending Aug 08, 2023

Managing Haynes Boone (61658)'s Patent Prosecution?

IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

What is Haynes Boone (61658)'s patent allowance rate?

91.7% of resolved applications prosecuted by Haynes Boone (61658) were allowed, across 29,392 applications in USPTO records.

How many office actions does Haynes Boone (61658) average before allowance?

3.46 office actions per allowed application on average.

How many pending office actions does Haynes Boone (61658) have?

25 pending office actions as of October 2026, for 2 clients, before 23 examiners in 14 art units.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month