Technology area: Semiconductors, Circuits & Optics
25 pending office actions • 2 clients • 23 examiners • 14 art units • 0 of 25 (0%) have an AI response strategy ready
Haynes Boone (61658) has 25 pending office actions in Semiconductors, Circuits & Optics and 29,392 career applications. The entry identifies an active semiconductor-focused workload within a broad historical filing record.
The resolved allowance rate is 91.71%, and the average number of office actions per allowance is 3.46. These measures give outcome and examination-effort context, although the profile does not separate this entry’s results from the broader application record.
Practitioners can use the profile to assess current activity and the firm-level prosecution history. Matter-specific claim, examiner, and timing information is not included.
Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 1 (4%) |
| §103 only | 6 (24%) |
| §102 only | 1 (4%) |
| §112 only | 2 (8%) |
| Double-patenting + other | 2 (8%) |
| Multi-statute (no §101) | 10 (40%) |
| No statute on record | 3 (12%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| FINCH III, FRED E | 2 | 80.2% | +17.2% |
| WELLS, KENNETH B | 2 | 86.3% | +2.2% |
| O NEILL, PATRICK | 1 | 83.5% | +17.3% |
| TIKU, SISAY G | 1 | 91.5% | +9.1% |
| MEHARI, YEMANE | 1 | 89.3% | +6.5% |
| ROSARIO BENITEZ, GUSTAVO A | 1 | 81.5% | +24.8% |
| BEHM, HARRY RAYMOND | 1 | 79.6% | +7.3% |
| ALMO, KHAREEM E | 1 | 87.4% | +5.8% |
| TRAN, BINH BACH THANH | 1 | 81.0% | +12.0% |
| WENDELL, ANDREW | 1 | 84.2% | +12.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18827039 | GATE RESISTIVE LADDER BYPASS FOR RF FET SWITCH STACK | WELLS, KENNETH B | 36d overdue |
| 19102362 | MULTI-MODE POWER CONVERTERS WITH SHARED COMPONENTS | FINCH III, FRED E | — |
| 19031219 | DC-DC TRANSFORMER WITH INDUCTOR FOR THE FACILITATION OF ADIABATIC INTER-CAPACITOR CHARGE TRANSPORT | MEHARI, YEMANE | — |
| 19017326 | AC Coupling Modules for Bias Ladders | WELLS, KENNETH B | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18510899 | SYSTEMS AND METHODS FOR ESTIMATING OUTPUT CURRENT OF A CHARGE PUMP | NAVARRO, HUGO IVAN | 18d overdue |
| 19060481 | Efficient Bootstrap Supply Generators for Multi-Level Power Converters | O NEILL, PATRICK | — |
| 19039729 | POWER CONVERTER | TIKU, SISAY G | — |
| 19029649 | SWITCHED CAPACITORS FOR AC-DC APPLICATIONS | ROSARIO BENITEZ, GUSTAVO A | — |
| 18893873 | METHODS, APPARATUSES, INTEGRATED CIRCUITS, AND PRINTED CIRCUIT BOARDS FOR POWER CONVERSION WITH REDUCED PARASITICS | TRAN, BINH BACH THANH | — |
| 18664214 | REFERENCE SIGNAL ANTENNA SWITCHING FOR RADIO FREQUENCY FRONT END SYSTEMS AND METHODS | WENDELL, ANDREW | — |
| 18643857 | SUPPRESSION OF REBALANCING CURRENTS IN A SWITCHED-CAPACITOR NETWORK | HILTUNEN, THOMAS J | — |
| 18404866 | AREA EFFECTIVE HEAT SINK | LIU, MIKKA H | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18606319 | SWITCHED-CAPACITOR CIRCUIT CONTROL IN POWER CONVERTERS | FINCH III, FRED E | 20d |
| 19060481 | Efficient Bootstrap Supply Generators for Multi-Level Power Converters | O NEILL, PATRICK | — |
| 19102362 | MULTI-MODE POWER CONVERTERS WITH SHARED COMPONENTS | FINCH III, FRED E | — |
| 19029649 | SWITCHED CAPACITORS FOR AC-DC APPLICATIONS | ROSARIO BENITEZ, GUSTAVO A | — |
| 18893873 | METHODS, APPARATUSES, INTEGRATED CIRCUITS, AND PRINTED CIRCUIT BOARDS FOR POWER CONVERSION WITH REDUCED PARASITICS | TRAN, BINH BACH THANH | — |
| 18664214 | REFERENCE SIGNAL ANTENNA SWITCHING FOR RADIO FREQUENCY FRONT END SYSTEMS AND METHODS | WENDELL, ANDREW | — |
| Client (Assignee) | Pending OAs |
|---|---|
| Murata | 24 |
| Murata Manufactunng Co., Ltd. | 1 |
| Art Unit | Apps |
|---|---|
| 2838 | 6 |
| 2836 | 4 |
| 2842 | 3 |
| 2818 | 2 |
| 2849 | 1 |
| 2847 | 1 |
| 2648 | 1 |
| 2646 | 1 |
| 2893 | 1 |
| 2817 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19060481 | Efficient Bootstrap Supply Generators for Multi-Level Power Converters | Murata Manufacturing Co., Ltd. | O NEILL, PATRICK | 2836 | §102§112Other | Final Rejection | — | Pending | Feb 21, 2025 |
| 19102362 | MULTI-MODE POWER CONVERTERS WITH SHARED COMPONENTS | Murata Manufacturing Co., Ltd. | FINCH III, FRED E | 2838 | §102 | Non-Final OA | — | Pending | Feb 07, 2025 |
| 19039729 | POWER CONVERTER | Murata Manufacturing Co., Ltd. | TIKU, SISAY G | 2838 | §101§112Other | Non-Final OA | — | Pending | Jan 28, 2025 |
| 19031219 | DC-DC TRANSFORMER WITH INDUCTOR FOR THE FACILITATION OF ADIABATIC INTER-CAPACITOR CHARGE TRANSPORT | Psemi Corporation | MEHARI, YEMANE | 2838 | §103 | Non-Final OA | — | Pending | Jan 17, 2025 |
| 19029649 | SWITCHED CAPACITORS FOR AC-DC APPLICATIONS | Psemi Corporation | ROSARIO BENITEZ, GUSTAVO A | 2838 | §102§103 | Non-Final OA | — | Pending | Jan 17, 2025 |
| 19031034 | PUMP CAPACITOR CONFIGURATION FOR SWITCHED CAPACITOR CIRCUITS | Psemi Corporation | BEHM, HARRY RAYMOND | 2838 | Other | Non-Final OA | — | Pending | Jan 17, 2025 |
| 19017326 | AC Coupling Modules for Bias Ladders | Psemi Corporation | WELLS, KENNETH B | 2836 | §103 | Final Rejection | — | Pending | Jan 10, 2025 |
| 18964292 | METHODS AND DEVICES FOR FAST SWITCHING OF RADIO FREQUENCY SWITCHES | Psemi Corporation | ALMO, KHAREEM E | 2849 | Other | Non-Final OA | 41d | Pending | Nov 29, 2024 |
| 18893873 | METHODS, APPARATUSES, INTEGRATED CIRCUITS, AND PRINTED CIRCUIT BOARDS FOR POWER CONVERSION WITH REDUCED PARASITICS | Murata Manufacturing Co., Ltd. | TRAN, BINH BACH THANH | 2847 | §102§103 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18827039 | GATE RESISTIVE LADDER BYPASS FOR RF FET SWITCH STACK | Psemi Corporation | WELLS, KENNETH B | 2842 | §103§112DP | Final Rejection | 36d overdue | Pending | Sep 06, 2024 |
| 18664214 | REFERENCE SIGNAL ANTENNA SWITCHING FOR RADIO FREQUENCY FRONT END SYSTEMS AND METHODS | Psemi Corporation | WENDELL, ANDREW | 2648 | §102§103 | Final Rejection | — | Pending | May 14, 2024 |
| 18643857 | SUPPRESSION OF REBALANCING CURRENTS IN A SWITCHED-CAPACITOR NETWORK | Murata Manufacturing Co., Ltd. | HILTUNEN, THOMAS J | 2836 | §102§103Other | Final Rejection | — | Pending | Apr 23, 2024 |
| 18640862 | METHOD AND APPARATUS FOR USE IN IMPROVING LINEARITY OF MOSFETS USING AN ACCUMULATED CHARGE SINK | Psemi Corporation | NGUYEN, NIKI HOANG | 2818 | §102DP | Non-Final OA | — | Pending | Apr 19, 2024 |
| 18606319 | SWITCHED-CAPACITOR CIRCUIT CONTROL IN POWER CONVERTERS | Psemi Corporation | FINCH III, FRED E | 2838 | Other | Final Rejection | 20d | Pending | Mar 15, 2024 |
| 18605576 | METHODS AND APPARATUS FOR REDUCING SWITCHING TIME OF RF FET SWITCHING DEVICES | Psemi Corporation | VO, NGUYEN THANH | 2646 | §112 | Non-Final OA | — | Pending | Mar 14, 2024 |
| 18600443 | MULTILAYER CERAMIC CAPACITORS (MLCC) ARRAY AND INTEGRATION WITH ACTIVE DEVICES | Murata Manufacturing Co., Ltd. | YECHURI, SITARAMARAO S | 2893 | §103 | Final Rejection | — | Pending | Mar 08, 2024 |
| 18409152 | GATE RESISTOR BYPASS FOR RF FET SWITCH STACK | Psemi Corporation | NGUYEN, LONG T | 2842 | §112 | Non-Final OA | 20d | Pending | Jan 10, 2024 |
| 18408508 | DIODE AND TRANSISTOR DEVICES AND FABRICATION TECHNIQUES | Murata Manufactunng Co., Ltd. | PARK, SAMUEL | 2818 | §103 | Final Rejection | — | Pending | Jan 09, 2024 |
| 18406435 | START-UP OF STEP-UP POWER CONVERTER WITH SWITCHED-CAPACITOR NETWORK | Psemi Corporation | CHEN, PATRICK C | 2842 | §103 | Final Rejection | — | Pending | Jan 08, 2024 |
| 18404866 | AREA EFFECTIVE HEAT SINK | Murata Manufacturing Co., Ltd. | LIU, MIKKA H | 2817 | §102§103§112 | Non-Final OA | — | Pending | Jan 04, 2024 |
| 18402497 | INTEGRATED CIRCUIT PACKAGES FOR FACILITATING POWER CONVERTER SYSTEMS AND METHODS | Murata Manufacturing Co., Ltd. | REIDA, MOLLY KAY | 2899 | §102§103 | Non-Final OA | — | Pending | Jan 02, 2024 |
| 18510899 | SYSTEMS AND METHODS FOR ESTIMATING OUTPUT CURRENT OF A CHARGE PUMP | Psemi Corporation | NAVARRO, HUGO IVAN | 2858 | §103§112 | Non-Final OA | 18d overdue | Pending | Nov 16, 2023 |
| 18489623 | HYBRID POWER CONVERTERS, LATERAL DEVICES, VERTICAL DEVICES, MULTIPLE COPPER CLIPS, REPLICA DEVICES | Murata Manufacturing Co., Ltd. | MALEK, MALIHEH | 2813 | §102§103 | Non-Final OA | — | Pending | Oct 18, 2023 |
| 18451542 | Shallow Trench Isolation using Porous Semiconductor | Murata Manufacturing Co., Ltd. | HOSSAIN, MOAZZAM | 2898 | §103 | Final Rejection | — | Pending | Aug 17, 2023 |
| 18446462 | POWER CONVERTERS AND METHODS FOR CHARGING AND DISCHARGING A BATTERY | Murata Manufacturing Co., Ltd. | CAVALLARI, DANIEL | 2836 | §103§112 | Non-Final OA | — | Pending | Aug 08, 2023 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial91.7% of resolved applications prosecuted by Haynes Boone (61658) were allowed, across 29,392 applications in USPTO records.
3.46 office actions per allowed application on average.
25 pending office actions as of October 2026, for 2 clients, before 23 examiners in 14 art units.