Listed by the USPTO as GODO, OLATUNJI A
Tech Center 1700 • Art Units: 1721 1722 1723 1752 1789
This examiner grants 86% of resolved cases
This examiner works in tech center 1700 and art unit 1721, with 1148 resolved cases. The allowance rate is 85.9%, and the median time to allowance is 836 days. The interview lift is 9.0%, showing a modest positive association against a high overall allowance result.
Representative companies include LG Energy Solution Ltd., Eve Power Co., Ltd., and Nissan Motor Co., Ltd. The principal firms are BIRCH STEWART KOLASCH & BIRCH, LLP, Bryan Cave Leighton Paisner LLP (DC), and Barron & Young PLLC. The large record and favorable allowance rate support predictable planning, while the median timing remains relevant to portfolio scheduling.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18699252 | ELECTROLYTE SOLUTION FOR LITHIUM SECONDARY BATTERY, AND LITHIUM SECONDARY BATTERY COMPRISING SAME | Non-Final OA | LG ENERGY SOLUTION, LTD. |
| 18682877 | SECONDARY BATTERY WITH ENHANCED SAFETY | Non-Final OA | LG ENERGY SOLUTION, LTD. |
| 18285949 | ELECTRODE TAB ASSEMBLY AND SECONDARY BATTERY INCLUDING THE SAME | Final Rejection | LG ENERGY SOLUTION, LTD. |
| 18280892 | BATTERY PACK AND ENERGY STORAGE SYSTEM INCLUDING THE SAME | Final Rejection | LG ENERGY SOLUTION, LTD. |
| 18379705 | Self-Heating Structure and Battery Pack Including the Same | Final Rejection | EVE POWER CO., LTD. |
| 18580245 | Liquid Electrolyte Composition, and Electrochemical Cell Comprising Said Electrolyte Composition | Non-Final OA | Bayerische Motoren Werke Aktiengesellschaft |
| 18332900 | MULTILAYER, FLEXIBLE, IMPACT AND PUNCTURE RESISTANT, FLUID IMPERVIOUS, DIELECTRIC INSULATOR SHEET FOR AN ELECTRIC VEHICLE BATTERY PACK AND MOUNTING ARRANGEMENT THEREWITH | Final Rejection | NISSAN MOTOR CO., LTD. |
| 18540766 | BATTERY THERMAL PROPAGATION | Non-Final OA | Caterpillar Inc. |
| 18629711 | RECHARGEABLE BATTERY AND RECHARGEABLE BATTERY MODULE | Non-Final OA | SAMSUNG SDI CO., LTD. |
| 18650730 | SECONDARY BATTERY, BATTERY PACK, ELECTRONIC EQUIPMENT, ELECTRIC TOOL, ELECTRIC AIRCRAFT, AND ELECTRIC VEHICLE | Non-Final OA | MURATA MANUFACTURING CO., LTD. |
| 18280172 | ELECTROLYTE COMPACT PRODUCTION METHOD AND ELECTROLYTE COMPACT | Final Rejection | NIPPON SHOKUBAI CO., LTD. |
| 18554630 | BINDER FOR SOLID ELECTROLYTE-BASED ALL SOLID-STATE LITHIUM SECONDARY BATTERY, CATHODE IN ALL SOLID-STATE LITHIUM SECONDARY BATTERY COMPRISING THE SAME, SEPARATOR IN ALL SOLID-STATE LITHIUM SECONDARY BATTERY COMPRISING THE SAME, SOLID ELECTROLYTE-BASED ALL SOLID-STATE LITHIUM SECONDARY BATTERY COMPRISING THE SAME | Final Rejection | Seoul National University R&DB Foundation |
| 18207897 | BATTERY INFORMATION SAMPLING ASSEMBLY, BATTERY MODULE, AND BATTERY PACK | Non-Final OA | BYD COMPANY LIMITED |
| 18604147 | MEMBRANE ELECTRODE ASSEMBLY | Non-Final OA | GM Global Technology Operations LLC |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy85.9% of resolved applications examined by Olatunji A Godo were allowed (1,148 resolved cases), compared with 40.6% across Art Unit 1721 over the last five years.
This examiner's interview lift is +9.0 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Olatunji A Godo took 836 days on average from filing to allowance.
Olatunji A Godo examines applications in Art Unit 1721 in Tech Center 1700 (Chemistry & Materials).