Prosecution Insights
Last updated: May 29, 2026

Examiner: LY, XUAN

Tech Center 2800 • Art Units: 2836

This examiner grants 85% of resolved cases

Performance Statistics

85.0%
Allow Rate
+17.0% vs TC avg
554
Total Applications
+6.4%
Interview Lift
944
Avg Prosecution Days
Based on 535 resolved cases, 2023–2026

Rejection Statute Breakdown

0.3%
§101 Eligibility
5.2%
§102 Novelty
92.5%
§103 Obviousness
0.6%
§112 Clarity

Currently Pending Office Actions

App #TitleStatusAssignee
18829392 POWER CONVERTER ARRANGEMENT WITH PARTIAL POWER CONVERSION Final Rejection Huawei Digital Power Technologies Co., Ltd.
19075337 Virtual Synchronous Condenser Non-Final OA Maxout Renewable, Inc.
18968224 Maximizing Power in a Photovoltaic Distributed Power System Non-Final OA Solaredge Technologies Ltd.
18929578 CHARGING APPARATUS AND ENERGY STORAGE CHARGING APPARATUS Non-Final OA Positec Power Tools (Suzhou) Co., Ltd
18892841 SYSTEM WITH MULTIPLE POWER CONTROLLERS TO REDUCE HARMONICS Final Rejection Advanced Energy Industries, Inc.
18826527 BATTERY PACK WITH TRIPLE-ACTIVE BRIDGE DC-DC CONVERTER Non-Final OA Our Next Energy, Inc.

Facing This Examiner?

IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.

Build Your Strategy

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month