Listed by the USPTO as MANG, LAL C
Tech Center 2800 • Art Units: 2857 2863
This examiner grants 75% of resolved cases
MANG, LAL C is a USPTO patent examiner in Tech Center 2800 and Art Unit 2857. The profile covers 207 resolved cases, a 75.4% allowance rate, and a 19.0% interview lift. Median time to allowance is 1062 days.
The recorded companies are Samsung Electronics Co., Ltd., Halliburton Energy Services Inc., and The Regents of the University of California. The listed firms are HAUPTMAN HAM, LLP, Barron & Young PLLC, and C. Tumey Law Group PLLC - HES. The allowance result supplies useful historical context, while the positive interview lift supports using interviews as a potential supplement to written prosecution positions.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18029731 | Battery Management Apparatus and Method | Non-Final OA | LG Energy Solution, Ltd. |
| 18778249 | METHOD AND APPARATUS FOR ESTIMATING STATE OF BATTERY | Non-Final OA | SAMSUNG ELECTRONICS CO., LTD. |
| 18327395 | METHOD AND ELECTRONIC DEVICE FOR FORECASTING REMAINING USEFUL LIFE (RUL) OF BATTERY | Final Rejection | Samsung Electronics Co., Ltd. |
| 18647742 | CROSS-MODAL ASSOCIATION BETWEEN WEARABLE AND STRUCTURAL VIBRATION SIGNAL SEGMENTS FOR INDOOR OCCUPANT SENSING | Non-Final OA | THE REGENTS OF THE UNIVERSITY OF CALIFORNIA |
| 18085240 | Real-Time Warning And Mitigation Of Intrinsic Noise Of Transducers | Final Rejection | Halliburton Energy Services, Inc. |
| 19562004 | SYSTEM AND METHOD FOR ANALYZING SPECTRAL DATA USING ARTIFICIAL INTELLIGENCE | Final Rejection | Vionix Biosciences Inc. |
| 18414609 | STEAM TURBINE ROTOR BLADE THINNING AMOUNT MANAGING APPARATUS | Final Rejection | KABUSHIKI KAISHA TOSHIBA |
| 18642865 | EARLY WARNING METHOD FOR DEBRIS FLOW DISASTER IN SMALL WATERSHED, AND DISASTER REDUCTION METHOD FOR DEBRIS FLOWS IN SMALL WATERSHED | Non-Final OA | Zhejiang University |
| 18298841 | BATTERY MODULE MONITORING AND REPURPOSING | Non-Final OA | Caterpillar Inc. |
| 18746180 | Computer-Implemented Method for Determining an Energy Ratio for a Consumed Energy | Non-Final OA | ABB Schweiz AG |
| 18188916 | SYSTEMS AND TECHNIQUES FOR PREDICTING LIFE OF BATTERY, AND BATTERY MANAGEMENT SYSTEM OPERATING THE SAME | Final Rejection | SK On Co., Ltd. |
| 18682292 | ENGINE ASSEMBLY FOR A VEHICLE AND METHOD FOR DETERMINING PISTON TEMPERATURE IN AN ENGINE | Final Rejection | BRP-ROTAX GMBH & CO. KG |
| 18280266 | DATA FILTER FOR SCANNING METROLOGY | Final Rejection | ASML NETHERLANDS B.V. |
| 17894252 | DATA PROCESSING METHOD AND DATA PROCESSING SYSTEM | Non-Final OA | SHIMADZU CORPORATION |
| 18692323 | LIFE ESTIMATION METHOD, LIFE ESTIMATION DEVICE, AND COMPUTER PROGRAM | Final Rejection | THE JAPAN STEEL WORKS, LTD. |
| 18746039 | BATTERY FULL CHARGE CAPACITY ESTIMATION METHOD AND BATTERY FULL CHARGE CAPACITY ESTIMATION DEVICE | Non-Final OA | Prime Planet Energy & Solutions, Inc. |
| 18637091 | MONITORING CARBON SEQUESTRATION IN SOURCE ROCK RESERVOIRS USING STABLE ISOTOPIC FRACTIONATION TO QUANTIFY ITS RETENTION EFFICIENCY | Final Rejection | ARAMCO SERVICES COMPANY |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy75.4% of resolved applications examined by Lal C Mang were allowed (207 resolved cases), compared with 72.3% across Art Unit 2857 over the last five years.
This examiner's interview lift is +19.0 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Lal C Mang took 1,062 days on average from filing to allowance.
Lal C Mang examines applications in Art Unit 2857 in Tech Center 2800 (Semiconductors, Circuits & Optics).