Listed by the USPTO as MOORE, DEVON TYLEN
Tech Center 3700 • Art Units: 3763
This examiner grants 48% of resolved cases
Devon Tylen Moore, an examiner in Art Unit 3763 of Tech Center 3700, has resolved 184 cases. The allowance rate is 48.4 percent, and the median days to allowance is 1146. The interview lift is 37.2 percent, suggesting that interviews are a productive way to increase the likelihood of an allowance beyond the baseline.
Sumitomo Heavy Industries Ltd., Linde GmbH, and Airbus SAS are the top companies. Firms like HEA Law and MILLEN, WHITE, ZELANO & BRANIGAN, P.C. frequently appear before this examiner. They manage the 1146-day median timeline and the 48.4 percent allowance rate for their clients.
Practitioners should utilize the 37.2 percent interview lift to improve their odds. The 1146-day duration is a key factor for prosecution planning. With 184 resolved cases, the examiner's data highlights the value of direct engagement for these top industrial and aerospace companies.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18668391 | BATTERY PACK-POWERED COOLER | Final Rejection | MILWAUKEE ELECTRIC TOOL CORPORATION |
| 19175777 | HIGH-PRESSURE HYDROGEN DISTRIBUTION SYSTEM FOR AN AIRCRAFT WITH A TANK STORING SUPERCRITICAL HYDROGEN | Non-Final OA | Airbus Operations SAS |
| 19175774 | AIRCRAFT HYDROGEN DISTRIBUTION SYSTEM WITH A COMPRESSOR | Non-Final OA | Airbus Operations SAS |
| 18507360 | SYSTEMS AND METHODS FOR THERMAL MANAGEMENT OF REAGENT WELL PLATES | Non-Final OA | 10x Genomics, Inc. |
| 18711907 | HYDROGEN RE-LIQUEFACTION SYSTEM | Non-Final OA | KAWASAKI JUKOGYO KABUSHIKI KAISHA |
| 18254396 | COOLING SYSTEM FOR MOVING VEHICLE, MOVING VEHICLE WITH COOLING SYSTEM, AND COOLING CONTROL METHOD | Final Rejection | KAWASAKI JUKOGYO KABUSHIKI KAISHA |
| 18868835 | INSTALLATION COMPRISING LNG AND RENEWABLE ELECTRICITY FACILITIES WITH AT LEAST ONE THERMAL ENERGY STORAGE SYSTEM | Non-Final OA | TotalEnergies OneTech |
| 19040291 | CRYOGENIC QUANTUM TUNNEL INTERCONNECTS AT A DISTANCE | Non-Final OA | International Business Machines Corporation |
| 19079343 | PLANT AND METHOD FOR PRODUCING LIQUEFIED HYDROGEN | Non-Final OA | L'Air Liquide, Societe Anonyme pour l'Etude et l’Exploitation des Procedes Georges Claude |
| 19057104 | AIR SEPARATION UNIT | Non-Final OA | L'Air Liquide, Societe Anonyme pour l'Etude et l’Exploitation des Procedes Georges Claude |
| 18979726 | SUPERCONDUCTING EQUIPMENT COOLING DEVICE AND OPERATION METHOD FOR SUPERCONDUCTING EQUIPMENT COOLING DEVICE | Non-Final OA | SUMITOMO HEAVY INDUSTRIES, LTD. |
| 18783358 | GIFFORD-MCMAHON (GM) CRYOCOOLER FIRST-STAGE DISPLACER, FIRST-STAGE DISPLACER ASSEMBLY, AND GIFFORD-MCMAHON CRYOCOOLER | Final Rejection | SUMITOMO HEAVY INDUSTRIES, LTD. |
| 18743087 | CRYOCOOLER COMPRESSOR | Non-Final OA | SUMITOMO HEAVY INDUSTRIES, LTD. |
| 18665614 | REGENERATOR MATERIAL FOR CRYOCOOLER, REGENERATOR FOR CRYOCOOLER, AND CRYOCOOLER | Non-Final OA | SUMITOMO HEAVY INDUSTRIES, LTD. |
| 18488987 | OIL-LUBRICATED CRYOCOOLER COMPRESSOR AND OPERATION METHOD THEREOF | Final Rejection | SUMITOMO HEAVY INDUSTRIES, LTD. |
| 18478737 | VALVE SET INTEGRATED MODULE, THERMAL MANAGEMENT SYSTEM, AND VEHICLE | Non-Final OA | BYD COMPANY LIMITED |
| 18411377 | Cryogenic tank comprising a withdrawal device | Non-Final OA | MAGNA Energy Storage Systems GesmbH |
| 18944117 | METHOD FOR VACUUM-EXHAUSTING BY MEANS OF CRYOPUMP | Non-Final OA | CRYO H&I, INC |
| 17627095 | SERIES FLOW CHILLER SYSTEM | Non-Final OA | Johnson Controls Tyco IP Holdings LLP |
| 18139505 | HYDROGEN TEMPERATURE CONTROLLING SYSTEM, REFRIGERATED CONTAINING DEVICE, AND DIVISIONAL TEMPERATURE CONTROLLING METHOD FOR THE REFRIGERATED CONTAINING DEVICE | Final Rejection | AUTOMOTIVE RESEARCH & TESTING CENTER |
| 18765205 | LOOPED HEAT PIPE WITH DUAL DIAMETER | Final Rejection | NIDEC CHAUN-CHOUNG TECHNOLOGY CORPORATION |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy48.4% of resolved applications examined by Devon Tylen Moore were allowed (184 resolved cases), compared with 60.3% across Art Unit 3763 over the last five years.
This examiner's interview lift is +37.2 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Devon Tylen Moore took 1,146 days on average from filing to allowance.
Devon Tylen Moore examines applications in Art Unit 3763 in Tech Center 3700 (Medical Devices & Mechanical Engineering).