Listed by the USPTO as MYERS, KEITH STANLEY
Tech Center 3700 • Art Units: 1711 3663 3763
This examiner grants 53% of resolved cases
MYERS, KEITH STANLEY is assigned to Tech Center 3700 and art unit 1711. The record covers 125 resolved cases, with a 52.8% allowance rate and a median of 1153 days to allowance. Interviews show a reported lift of 18.6%. The case volume supports using the profile as context rather than as a substitute for file-level analysis.
The listed companies are LG Electronics Inc., Samsung Electronics Co., Ltd., and Tyco Fire & Security GmbH. The principal firms are BIRCH STEWART KOLASCH & BIRCH, LLP, DORITY & MANNING, P.A., and DUANE MORRIS LLP - Boca Raton. Practitioners should plan for extended prosecution and evaluate interview timing carefully.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18986467 | REFRIGERATOR FOR DRINKS | Final Rejection | LG ELECTRONICS INC. |
| 18944403 | ICE MAKER AND REFRIGERATOR INCLUDING THE SAME | Non-Final OA | LG Electronics Inc. |
| 19176712 | AIR CONDITIONER | Non-Final OA | SAMSUNG ELECTRONICS CO., LTD. |
| 19021787 | AIR CONDITIONER AND METHOD FOR CONTROLLING SAME | Non-Final OA | SAMSUNG ELECTRONICS CO., LTD. |
| 18608186 | Cart Compartment Cooling Using Aircraft Potable Water and Method | Final Rejection | The Boeing Company |
| 18746124 | ROOFTOP AIR CONDITIONING UNIT | Final Rejection | Carrier Corporation |
| 18841221 | SPRAYING SYSTEM, METHOD AND APPARATUS FOR CONTROLLING SPRAYING SYSTEM, AND ELECTRONIC DEVICE | Non-Final OA | MIDEA GROUP CO., LTD. |
| 19002176 | AIR CONDITIONER AND METHOD OF CONTROLLING WATER SUPPLY MODULE USED THEREIN | Non-Final OA | KYUNGDONG NAVIEN CO., LTD. |
| 19002157 | AIR CONDITIONER AND METHOD OF CONTROLLING WATER SUPPLY MODULE USED THEREIN | Non-Final OA | KYUNGDONG NAVIEN CO., LTD. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy52.8% of resolved applications examined by Keith Stanley Myers were allowed (125 resolved cases), compared with 63.9% across Art Unit 1711 over the last five years.
This examiner's interview lift is +18.6 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Keith Stanley Myers took 1,153 days on average from filing to allowance.
Keith Stanley Myers examines applications in Art Unit 1711 in Tech Center 3700 (Medical Devices & Mechanical Engineering).