Prosecution Insights
Last updated: October 02, 2026

Examiner: NAHAR, QAMRUN

Tech Center 2100 • Art Units: 2123 2183 2191 2196 2198 2199

This examiner grants 88% of resolved cases

Analysis

Qamrun Nahar examines applications in Tech Center 2100, specifically within Art Unit 2123. He has a large volume of 719 resolved cases. His allowance rate is 88.0 percent, which is very high and indicates a strong likelihood of success for applicants. This 88.0 percent rate suggests that the vast majority of the 719 resolved cases he has handled resulted in a granted patent.

The interview lift for Nahar is 10.0 percent. While this is a positive lift, it is more moderate compared to some other examiners. This 10.0 percent lift suggests that while interviews are helpful, they may not be as transformative as in other art units. Nevertheless, practitioners in Art Unit 2123 should still consider interviews as a useful tool to clarify issues and maintain the high 88.0 percent probability of success.

The median days to allowance for Nahar is 1155. This 1155-day timeline represents the typical duration from filing to grant. Given the 719 resolved cases, this 1155-day median is a stable benchmark for planning purposes. Applicants can expect a prosecution period of approximately 1155 days. The combination of an 88.0 percent allowance rate and a 1155-day median makes Nahar a favorable examiner for those seeking a reliable path to grant.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Performance Statistics

88.0%
Allow Rate
+33.0% vs TC avg
733
Total Applications
+10.0%
Interview Lift
1155
Avg Prosecution Days
Based on 719 resolved cases, 2023–2026

Rejection Statute Breakdown

19.1%
§101 Eligibility
29.5%
§102 Novelty
33.8%
§103 Obviousness
12.7%
§112 Clarity

Currently Pending Office Actions

App #TitleStatusAssignee
18809684 FAULT AND ATTACK TOLERANT ELECTRONIC HARDWARE USING REPROGRAMMABLE LOGIC WITH SOFTWARE OVER THE AIR SUPPORT Non-Final OA NXP B.V.
18820865 SECURE SOFTWARE UPDATES AND ARCHITECTURES Non-Final OA Stryker Corporation
18632098 FLEXIBLE INTEGRATION PROJECT DEPLOYMENT MODEL Final Rejection Oracle International Corporation
18729163 SEQUENCE PROGRAM DISPLAY DEVICE AND COMPUTER-READABLE STORAGE MEDIUM Final Rejection FANUC CORPORATION
18330665 DYNAMIC AMELIORATION OF INDUSTRIAL ARTIFICIAL INTELLIGENCE ORCHESTRATOR SOFTWARE Non-Final OA International Business Machines Corporation
18985665 INSTALLATION CHANNEL DETERMINING METHOD, APPARATUS, ELECTRONIC DEVICE, AND STORAGE MEDIUM Non-Final OA Beijing Youzhuju Network Technology Co., Ltd.
18908147 COMPUTER-IMPLEMENTED METHOD AND COMPUTER SYSTEM FOR SOFTWARE MODERNIZATION Non-Final OA Accenture Global Solutions Limited
18876722 Vehicle Control Device Non-Final OA Hitachi Astemo, Ltd.
18929324 SELECTING A CUSTOM FUNCTION FROM AVAILABLE CUSTOM FUNCTIONS TO BE ADDED INTO A PLAYBOOK Non-Final OA Cisco Technology, Inc.
18904169 Light Weight Mainframe Orchestration Engine Non-Final OA Bank of America Corporation
18650771 DYNAMIC AND CONTEXTUAL LIFECYCLE MANAGEMENT OF MANAGED NODES Final Rejection DELL PRODUCTS L.P.

Facing This Examiner?

IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.

Build Your Strategy

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month