Listed by the USPTO as NORMAN, MARC E
Tech Center 3700 • Art Units: 2117 2857 3744 3763
This examiner grants 84% of resolved cases
NORMAN, MARC E is assigned to tech center 3700 and art unit 2117. The profile records 1375 resolved cases, with an allowance rate of 84.0% and a median of 960 days to allowance. Interviews are associated with a 10.8% lift in the allowance rate. That combination indicates an examiner record with frequent allowances and a measurable, though not dominant, interview effect.
The listed companies include Carrier Corporation, Daikin Industries Ltd., and LG Electronics Inc. The listed firms are COOLEY LLP, DORITY & MANNING, P.A., and Dority & Manning, P.A. and Haier US Appliance. For prosecution planning, counsel may find interviews useful when claim issues remain after written exchanges, while the allowance timing supports early attention to claim scope and amendment strategy.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18909677 | REFRIGERATOR | Final Rejection | LG ELECTRONICS INC. |
| 19005112 | COOLING APPARATUS AND OPERATING METHOD THEREOF | Non-Final OA | SAMSUNG ELECTRONICS CO., LTD. |
| 18830171 | HEAT PUMP SYSTEM FOR A VEHICLE | Non-Final OA | KIA CORPORATION |
| 19069524 | REFRIGERATION CYCLE DEVICE | Non-Final OA | DENSO CORPORATION |
| 19118818 | AIR CONDITIONING APPARATUS | Non-Final OA | Mitsubishi Electric Corporation |
| 19086650 | EJECTOR REFRIGERATION SYSTEM | Non-Final OA | Carrier Corporation |
| 19045254 | SYSTEM AND METHOD FOR LUBRICANT MANAGEMENT IN A HEATING, VENTILATION, AIR CONDITIONING, AND REFRIGERATION (HVACR) SYSTEM | Non-Final OA | Carrier Corporation |
| 19016770 | CHILLER AND AIR CONDITIONING SYSTEM | Non-Final OA | Carrier Corporation |
| 19093267 | REFRIGERATION CYCLE APPARATUS | Non-Final OA | DAIKIN INDUSTRIES, LTD. |
| 19089743 | REFRIGERATION CYCLE APPARATUS | Non-Final OA | DAIKIN INDUSTRIES, LTD. |
| 18224543 | Multi-Split Air Conditioner Operational Capacity Detection Method, Multi-Split Air Conditioner, Storage Medium, and Apparatus | Non-Final OA | Midea Group Co., Ltd. |
| 18666283 | AIR CONDITIONER UNIT HAVING A BUILT-IN LIGHT ASSEMBLY | Non-Final OA | Haier US Appliance Solutions, Inc. |
| 18752247 | HEAT PUMP AND CONTROL METHOD THEREOF | Non-Final OA | KYUNGDONG NAVIEN CO., LTD. |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy84.0% of resolved applications examined by Marc E Norman were allowed (1,375 resolved cases), compared with 59.5% across Art Unit 2117 over the last five years.
This examiner's interview lift is +10.8 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Marc E Norman took 960 days on average from filing to allowance.
Marc E Norman examines applications in Art Unit 2117 in Tech Center 3700 (Medical Devices & Mechanical Engineering).