Listed by the USPTO as ORTEGA, JOSEPH
Tech Center 2800 • Art Units: 2831 2832 2834
This examiner grants 72% of resolved cases
ORTEGA, JOSEPH is assigned to tech center 2800 and art unit 2831. The profile includes 435 resolved cases, a 72.4% allowance rate, and a median of 751 days to allowance. Interview lift is 15.3%, indicating a positive association between interviews and allowance outcomes. The combination of substantial case volume and a shorter median provides a useful basis for setting prosecution expectations.
Frequent companies include Safran S.A., Siemens Gamesa Renewable Energy S.A., and Rev Robotics LLC. The leading firms are BIRCH STEWART KOLASCH & BIRCH, LLP, CANTOR COLBURN LLP, and CARSTENS, ALLEN & GOURLEY, LLP. Practitioners may consider interviews as a way to address issues efficiently, while keeping amendments closely tied to the cited art. The 751-day median supports prompt response preparation and focused management of continuation options.
| App # | Title | Status | Assignee |
|---|---|---|---|
| 18719390 | METHOD FOR MANAGING THE TORQUE OF A TURBOMACHINE | Non-Final OA | SAFRAN AIRCRAFT ENGINES |
| 18842945 | TAXIING DEVICE WITH COMBINED RADIAL AND AXIAL MAGNETIC FLUX BRAKING, AND AIRCRAFT EQUIPPED WITH SAME | Final Rejection | SAFRAN LANDING SYSTEMS |
| 19049025 | ROTOR FOR ELECTRIC MOTOR | Non-Final OA | TOYOTA JIDOSHA KABUSHIKI KAISHA |
| 18983535 | STATOR ASSEMBLY, A COOLANT FLUID DISTRIBUTION RING ELEMENT, A METHOD, AN ELECTRIC MACHINE AND A VEHICLE | Non-Final OA | VOLVO TRUCK CORPORATION |
| 18813743 | LINEAR ELECTRIC MOTOR | Non-Final OA | ILLINOIS TOOL WORKS INC. |
| 19110461 | DAMPENING SYSTEM AND METHOD FOR WIND TURBINE INSTALLATION | Non-Final OA | Siemens Gamesa Renewable Energy A/S |
| 19105835 | ROTOR POSITION DETERMINATION OF A MULTIPLE WINDING SET GENERATOR | Non-Final OA | Siemens Gamesa Renewable Energy A/S |
| 18831436 | Non-Final OA | Cummins Power Generation Inc. | |
| 18861945 | ELECTRIC COMPRESSOR | Final Rejection | Hanon Systems |
IP Author analyzes examiner patterns and generates tailored response strategies with the highest chance of allowance.
Build Your Strategy72.4% of resolved applications examined by Joseph Ortega were allowed (435 resolved cases), compared with 72.3% across Art Unit 2831 over the last five years.
This examiner's interview lift is +15.3 percentage points: the difference in allowance rate between resolved applications that had an examiner interview and those that did not.
Applications allowed by Joseph Ortega took 751 days on average from filing to allowance.
Joseph Ortega examines applications in Art Unit 2831 in Tech Center 2800 (Semiconductors, Circuits & Optics).