Technology areas: Chemistry & Materials • Medical Devices & Mechanical Engineering
39 pending office actions • 21 art units • 32 examiners • 0 of 39 (0%) have an AI response strategy ready • 60 patents granted in the last 365 days
Siemens Gamesa Renewable Energy S.A. has 38 pending office actions in Medical Devices & Mechanical Engineering. The matters involve 32 distinct examiners and 21 distinct art units, showing a distributed docket with repeated activity within several technical groups.
WONG, ELTON K is the busiest examiner, with 2 pending matters. Portfolio management should emphasize consistent technical positions and art-unit comparisons, since the busiest examiner handles only a limited portion of the matters.
Based on the USPTO statutory response window for each pending office action. 8 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 8 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (3%) |
| §101 + other | 5 (13%) |
| §103 only | 7 (18%) |
| §112 only | 3 (8%) |
| Multi-statute (no §101) | 23 (59%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| WONG, ELTON K | 2 | 78.2% | +18.9% |
| FLORES, JUAN G | 2 | 79.6% | +14.5% |
| KIM, SANG K | 2 | 81.5% | +10.3% |
| ORTEGA, JOSEPH | 2 | 72.4% | +15.3% |
| PAGE, HANA C | 2 | 60.3% | +32.7% |
| BURRELL, KATELYNNE RUTH | 2 | 56.5% | -0.4% |
| DANIELS, MATTHEW J | 2 | 69.7% | +25.3% |
| LAMBERT, WAYNE A | 1 | 62.3% | +23.4% |
| SEHN, MICHAEL L | 1 | 81.2% | +12.7% |
| GHORISHI, SEYED BEHROOZ | 1 | 69.0% | +43.7% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19132831 | DEVICE AND METHOD FOR ASSISTING TO MOUNT OR DISMOUNT A ROTOR BLADE | KIM, SANG K | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18556464 | MONITORING OF WIND DIRECTION MEASUREMENTS IN WIND PARKS | NIMOX, RAYMOND LONDALE | 49d overdue |
| 19110461 | DAMPENING SYSTEM AND METHOD FOR WIND TURBINE INSTALLATION | ORTEGA, JOSEPH | 9d overdue |
| 18864673 | METHOD FOR MANUFACTURING A WIND TURBINE BLADE AND MOLD ARRANGEMENT | DARNELL, BAILEIGH K | 14d |
| 18694832 | WIND TURBINE BLADE, LADDER SUPPORT ASSEMBLY, WIND TURBINE AND METHOD FOR PROVIDING ACCESS TO THE INTERIOR OF A HOLLOW BLADE OF A WIND TURBINE | FISHER, WESLEY LE | 34d |
| 18716688 | DAMPING DEVICE | HERRING, BRENT W | 60d |
| 19481929 | METHOD FOR PRODUCING AT LEAST A PART OF A ROOT OF A WIND TURBINE ROTOR BLADE, ROOT OF A WIND TURBINE ROTOR BLADE, AND WIND TURBINE ROTOR BLADE | LAMBERT, WAYNE A | — |
| 19477509 | SEGMENTED WIND TURBINE BLADE, METHOD FOR ASSEMBLING A SEGMENTED WIND TURBINE BLADE AND WIND TURBINE | KIM, SANG K | — |
| 19148702 | ACTIVE FLAP FOR A BLADE OF A WIND TURBINE | SEHN, MICHAEL L | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19110461 | DAMPENING SYSTEM AND METHOD FOR WIND TURBINE INSTALLATION | ORTEGA, JOSEPH | 9d overdue |
| 18575086 | METHOD FOR MANUFACTURING A ROOT SEGMENT OF A ROTOR BLADE OF A WIND TURBINE | DANIELS, MATTHEW J | 82d |
| 19489813 | Connector assembly | WONG, ELTON K | — |
| 19481929 | METHOD FOR PRODUCING AT LEAST A PART OF A ROOT OF A WIND TURBINE ROTOR BLADE, ROOT OF A WIND TURBINE ROTOR BLADE, AND WIND TURBINE ROTOR BLADE | LAMBERT, WAYNE A | — |
| 19477851 | METHOD FOR MANUFACTURING A CARBON BEAM ADAPTED TO BE A PART OF A WIND TURBINE BLADE, CARBON BEAM FOR A WIND TURBINE BLADE, WIND TURBINE BLADE AND WIND TURBINE | FLORES, JUAN G | — |
| 19477509 | SEGMENTED WIND TURBINE BLADE, METHOD FOR ASSEMBLING A SEGMENTED WIND TURBINE BLADE AND WIND TURBINE | KIM, SANG K | — |
| 19148702 | ACTIVE FLAP FOR A BLADE OF A WIND TURBINE | SEHN, MICHAEL L | — |
| 19132831 | DEVICE AND METHOD FOR ASSISTING TO MOUNT OR DISMOUNT A ROTOR BLADE | KIM, SANG K | — |
| Art Unit | Apps |
|---|---|
| 3745 | 10 |
| 2834 | 3 |
| 1745 | 3 |
| 2668 | 2 |
| 3654 | 2 |
| 1742 | 2 |
| 1748 | 1 |
| 2852 | 1 |
| 3652 | 1 |
| 3631 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19489813 | Connector assembly | WONG, ELTON K | 3745 | §112 | Final Rejection | — | Pending | Dec 03, 2025 |
| 19481929 | METHOD FOR PRODUCING AT LEAST A PART OF A ROOT OF A WIND TURBINE ROTOR BLADE, ROOT OF A WIND TURBINE ROTOR BLADE, AND WIND TURBINE ROTOR BLADE | LAMBERT, WAYNE A | 3745 | §102§103§112 | Non-Final OA | — | Pending | Nov 06, 2025 |
| 19477851 | METHOD FOR MANUFACTURING A CARBON BEAM ADAPTED TO BE A PART OF A WIND TURBINE BLADE, CARBON BEAM FOR A WIND TURBINE BLADE, WIND TURBINE BLADE AND WIND TURBINE | FLORES, JUAN G | 3745 | §112 | Non-Final OA | — | Pending | Oct 23, 2025 |
| 19477509 | SEGMENTED WIND TURBINE BLADE, METHOD FOR ASSEMBLING A SEGMENTED WIND TURBINE BLADE AND WIND TURBINE | KIM, SANG K | 3745 | §102§103§112 | Non-Final OA | — | Pending | Oct 22, 2025 |
| 19148702 | ACTIVE FLAP FOR A BLADE OF A WIND TURBINE | SEHN, MICHAEL L | 3745 | §102§103§112 | Non-Final OA | — | Pending | Jul 17, 2025 |
| 19132831 | DEVICE AND METHOD FOR ASSISTING TO MOUNT OR DISMOUNT A ROTOR BLADE | KIM, SANG K | 3745 | §112 | Non-Final OA | — | Pending | May 26, 2025 |
| 19111172 | Core-layer body, connecting member, wind turbine blade and method | FLORES, JUAN G | 3745 | §103§112 | Non-Final OA | — | Pending | Mar 12, 2025 |
| 19110867 | Resin joining portion for wind turbine blades | WONG, ELTON K | 3745 | §102§103§112 | Non-Final OA | — | Pending | Mar 12, 2025 |
| 19110461 | DAMPENING SYSTEM AND METHOD FOR WIND TURBINE INSTALLATION | ORTEGA, JOSEPH | 2834 | §102§103 | Non-Final OA | 9d overdue | Pending | Mar 11, 2025 |
| 19106352 | METHOD FOR JOINING AT LEAST TWO SECTIONS OF A WIND TURBINE BLADE USING AN AIR HEATER DEVICE | GHORISHI, SEYED BEHROOZ | 1748 | §103§112 | Non-Final OA | — | Pending | Feb 25, 2025 |
| 19105835 | ROTOR POSITION DETERMINATION OF A MULTIPLE WINDING SET GENERATOR | ORTEGA, JOSEPH | 2834 | §102§112 | Non-Final OA | — | Pending | Feb 24, 2025 |
| 19103388 | Laser projector assembly | BEATTY, TY MITCHELL | 2668 | §101§112 | Non-Final OA | — | Pending | Feb 12, 2025 |
| 19101619 | Computer-implemented method for monitoring a generator of a wind turbine, wind turbine, computer program and elec-tronically readable storage medium | HARRISON, MICHAEL A | 2852 | §101§102§112 | Non-Final OA | — | Pending | Feb 06, 2025 |
| 18997552 | LIFTING TOOL | AHADI, ELIA | 3652 | §102§103§112 | Non-Final OA | — | Pending | Jan 22, 2025 |
| 18994646 | WIND TURBINE ROTOR BLADE | GOLIK, ARTHUR PAUL | 3745 | §102§103§112 | Non-Final OA | — | Pending | Jan 15, 2025 |
| 18865361 | RACK FOR TRANSPORTING AND/OR STORING BUILDING ELEMENTS WHICH ARE USED FOR BUILDING ROTOR BLADES OF WIND TURBINES | HAWN, PATRICK D | 3631 | §102§103§112 | Final Rejection | — | Pending | Nov 13, 2024 |
| 18864673 | METHOD FOR MANUFACTURING A WIND TURBINE BLADE AND MOLD ARRANGEMENT | DARNELL, BAILEIGH K | 1743 | §103§112 | Final Rejection | 14d | Pending | Nov 11, 2024 |
| 18932424 | METHOD OF MANUFACTURING AN ADAPTABLE CARBON-FIBER BEAM | PAGE, HANA C | 1745 | §103§112 | Final Rejection | — | Pending | Oct 30, 2024 |
| 18928392 | LOUVER | GRAY, PAUL J | 3753 | §102§103§112 | Non-Final OA | — | Pending | Oct 28, 2024 |
| 18908913 | WIND TURBINE WITH A POWER BEAMING APPARATUS, CENTRAL POWER INSTALLATION FOR A WIND FARM, WIND FARM, METHOD FOR OPERATING A WIND FARM AND METHOD FOR INSTALLING A WIND TURBINE | KESSIE, DANIEL | 2836 | §103 | Non-Final OA | 175d overdue | Pending | Oct 08, 2024 |
| 18842488 | MULTI-PHASE POWER CONVERTER CONTROL | KAKARLA, BHASKAR | 2116 | §101§103 | Non-Final OA | — | Pending | Aug 29, 2024 |
| 18832587 | OPERATING A PLANT DURING LOW NATURAL POWER | WORKU, KIDEST | 2119 | §103§112 | Non-Final OA | — | Pending | Jul 24, 2024 |
| 18832348 | METHOD OF CONTROLLING A WIND TURBINE | EDWARDS, ETHAN WESLEY | — | §101§103§112 | Non-Final OA | — | Pending | Jul 23, 2024 |
| 18730356 | MEASURING A STATOR SHAFT AND ASSEMBLING A STATOR AND A GENERATOR | CHILTON, CLARA GRACE | 3645 | §102§103§112 | Non-Final OA | — | Pending | Jul 19, 2024 |
| 18726706 | VACUUM LIFTING DEVICE, VACUUM LIFTING ARRANGEMENT, SUPPORT ELEMENT AND METHOD | SOTO, HENRIX | — | §102§103§112 | Non-Final OA | — | Pending | Jul 03, 2024 |
| 18726208 | LIFTING RIGGING | BURRELL, KATELYNNE RUTH | 3654 | §102§103§112 | Non-Final OA | — | Pending | Jul 02, 2024 |
| 18721938 | METHOD FOR MANUFACTURING A PREFORM ELEMENT, METHOD FOR MANUFACTURING A ROTOR BLADE, PREFORM ELEMENT, ROTOR BLADE, WIND TURBINE AND MOLD | MCNALLY, DANIEL | 1746 | §101§102§103 | Non-Final OA | — | Pending | Jun 20, 2024 |
| 18721275 | METHOD FOR MANUFACTURING A PREFORM ELEMENT, METHOD FOR MANUFACTURING A WIND TURBINE ROTOR BLADE, AND MOLD ARRANGEMENT | SWANSON, ANDREW L | 1745 | §103 | Final Rejection | 15d overdue | Pending | Jun 18, 2024 |
| 18716688 | DAMPING DEVICE | HERRING, BRENT W | 3633 | §102§103§112 | Final Rejection | 60d | Pending | Jun 05, 2024 |
| 18712045 | METHOD OF INSPECTING AN ADHESIVE LAYER | TRAN, PHUOC | 2668 | §103 | Final Rejection | — | Pending | May 21, 2024 |
| 18711153 | A CONNECTION MODULE AND SYSTEM | GUSHI, ROSS N | 2834 | §102§103§112 | Non-Final OA | — | Pending | May 17, 2024 |
| 18694832 | WIND TURBINE BLADE, LADDER SUPPORT ASSEMBLY, WIND TURBINE AND METHOD FOR PROVIDING ACCESS TO THE INTERIOR OF A HOLLOW BLADE OF A WIND TURBINE | FISHER, WESLEY LE | 3745 | §102§112 | Final Rejection | 34d | Pending | Mar 22, 2024 |
| 18576242 | LIFTING TOOL ARRANGEMENT FOR LIFTING A COMPONENT, TOOL FOR SUCH A LIFTING TOOL ARRANGEMENT AND METHOD FOR LIFTING A WIND TURBINE COMPONENT | BURRELL, KATELYNNE RUTH | 3654 | §102§103§112 | Non-Final OA | — | Pending | Jan 03, 2024 |
| 18575086 | METHOD FOR MANUFACTURING A ROOT SEGMENT OF A ROTOR BLADE OF A WIND TURBINE | DANIELS, MATTHEW J | 1742 | §103 | Non-Final OA | 82d | Pending | Dec 28, 2023 |
| 18560965 | METHOD FOR MANUFACTURING OF A WIND TURBINE BLADE COMPONENT AND WIND TURBINE ROOT | DANIELS, MATTHEW J | 1742 | §103 | Non-Final OA | — | Pending | Nov 15, 2023 |
| 18556464 | MONITORING OF WIND DIRECTION MEASUREMENTS IN WIND PARKS | NIMOX, RAYMOND LONDALE | 2857 | §101 | Final Rejection | 49d overdue | Pending | Oct 20, 2023 |
| 17783047 | METHOD FOR MANUFACTURING A WIND TURBINE BLADE | PAGE, HANA C | 1745 | §103 | Final Rejection | — | Pending | Sep 14, 2023 |
| 18023768 | CONTROLLING THE OPERATION OF A WIND TURBINE | DRAPEAU, SIMEON PAUL | 2188 | §102§103 | Final Rejection | — | Pending | Feb 28, 2023 |
| 17272067 | TREATING A WIND TURBINE DRIVE TRAIN | LAUGHLIN, CHARLES S | 2846 | §103 | Final Rejection | — | Pending | Feb 26, 2021 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialSiemens Gamesa Renewable Energy S.A. has 39 pending office actions as of October 2026, spread across 21 art units and 32 examiners.
Elton K Wong has the most, with 2 of Siemens Gamesa Renewable Energy S.A.'s pending office actions.
Mostly Medical Devices & Mechanical Engineering (USPTO Tech Center 3700), based on where its pending office actions are examined.