Technology areas: Chemistry & Materials • Semiconductors, Circuits & Optics
36 pending office actions • 27 art units • 35 examiners • 0 of 36 (0%) have an AI response strategy ready • 93 patents granted in the last 365 days
Siemens Energy AG has 37 pending office actions in Chemistry & Materials. The portfolio involves 37 distinct examiners and 28 distinct art units, so every pending action has a separate examiner assignment while some art units contain multiple matters. This structure requires broad matter-level coordination and selective art-unit issue tracking.
CAHILL, JESSICA MARIE is the busiest examiner, with 1 pending action. No examiner concentration is shown, making standardized review procedures and consistent technical positions more useful than a single-examiner strategy.
Based on the USPTO statutory response window for each pending office action. 11 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 11 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 2 (6%) |
| §103 only | 12 (33%) |
| §102 only | 1 (3%) |
| §112 only | 2 (6%) |
| Double-patenting + other | 1 (3%) |
| Multi-statute (no §101) | 18 (50%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| WILKINS III, HARRY D | 2 | 62.3% | +19.2% |
| CAHILL, JESSICA MARIE | 1 | 78.6% | +22.7% |
| BROCKMAN, ELDON T | 1 | 85.1% | +5.7% |
| AL-TAWEEL, MUAAMAR QAHTAN | 1 | 78.6% | +23.2% |
| FLORES JR, DONALD M | 1 | 77.0% | +26.9% |
| ALEJNIKOV JR, ROBERT P | 1 | 85.8% | +17.6% |
| DE LEON DOMENECH, RAFAEL O | 1 | 88.0% | +10.7% |
| DEBERADINIS, ROBERT L | 1 | 85.7% | +9.7% |
| ROBERTS, HERBERT K | 1 | 68.4% | +12.6% |
| SHEIKH, ASFAND M | 1 | 46.0% | +48.0% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18862634 | ELECTROLYSIS PLANT AND PLANT NETWORK COMPRISING AN ELECTROLYSIS PLANT AND A RENEWABLE ENERGY PLANT | DE LEON DOMENECH, RAFAEL O | — |
| 18862630 | ELECTROLYSIS PLANT AND PLANT NETWORK COMPRISING AN ELECTROLYSIS PLANT AND A RENEWABLE ENERGY PLANT | DEBERADINIS, ROBERT L | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18274998 | CONTINUOUS FLOW ENGINE SKID COMPONENT SYSTEM | FIGG, TRAVIS M | 26d overdue |
| 18854525 | CONTINUOUS FLOW ENGINE MAINTENANCE SCHEDULING AND PROGNOSIS SYSTEM | SHEIKH, ASFAND M | 2d overdue |
| 18851710 | GAS TURBINE ENGINE WITH TURBINE VANE CARRIER COOLING FLOW PATH | PRUITT, JUSTIN A | 19d |
| 18833424 | ELECTRODE FIBRE, ELECTRODE, ELECTROLYSIS CELL AND PROCESS FOR PRODUCING THE ELECTRODE FIBRE AND THE ELECTRODE | WILKINS III, HARRY D | 40d |
| 17787127 | SCANNING STRATEGY FOR VOLUME SUPPORT IN ADDITIVE MANUFACTURING | MILLS JR., JOE E | 54d |
| 18269552 | SUPPORT STRATEGY FOR THIN-WALLED ADDITIVE STRUCTURE | HEVEY, JOHN A | 60d |
| 19166678 | UNIT COMPRISING A COLLECTION TANK | CAHILL, JESSICA MARIE | — |
| 19157836 | RING SEGMENT FOR GAS TURBINE ENGINE | BROCKMAN, ELDON T | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18854525 | CONTINUOUS FLOW ENGINE MAINTENANCE SCHEDULING AND PROGNOSIS SYSTEM | SHEIKH, ASFAND M | 2d overdue |
| 18833424 | ELECTRODE FIBRE, ELECTRODE, ELECTROLYSIS CELL AND PROCESS FOR PRODUCING THE ELECTRODE FIBRE AND THE ELECTRODE | WILKINS III, HARRY D | 40d |
| 19166678 | UNIT COMPRISING A COLLECTION TANK | CAHILL, JESSICA MARIE | — |
| 18997608 | SUBSTATION WITH POWER VOLTAGE TRANSFORMER CONNECTED THROUGH CIRCUIT DEVICE TO HIGH OR EXTRA HIGH VOLTAGE TRANSMISSION LINE | AL-TAWEEL, MUAAMAR QAHTAN | — |
| 19010337 | CERAMIC MATERIAL, POWDER, AND LAYER SYSTEM COMPRISING THE CERAMIC MATERIAL | FLORES JR, DONALD M | — |
| 18874104 | LOW POWER INSTRUMENT TRANSFORMER (LPIT) IN CONICAL CONNECTOR | ALEJNIKOV JR, ROBERT P | — |
| 18862634 | ELECTROLYSIS PLANT AND PLANT NETWORK COMPRISING AN ELECTROLYSIS PLANT AND A RENEWABLE ENERGY PLANT | DE LEON DOMENECH, RAFAEL O | — |
| 18854664 | METHOD FOR MONITORING THE STATE OF HEAT EXCHANGER PIPELINES OF A WASTE HEAT STEAM GENERATOR, AND WASTE HEAT STEAM GENERATOR | ROBERTS, HERBERT K | — |
| Art Unit | Apps |
|---|---|
| 1794 | 3 |
| 1795 | 3 |
| 1733 | 3 |
| 2838 | 2 |
| 1735 | 2 |
| 3761 | 2 |
| 3753 | 1 |
| 3799 | 1 |
| 1781 | 1 |
| 2857 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19166678 | UNIT COMPRISING A COLLECTION TANK | CAHILL, JESSICA MARIE | 3753 | §102§103§112 | Non-Final OA | — | Pending | Sep 18, 2025 |
| 19157836 | RING SEGMENT FOR GAS TURBINE ENGINE | BROCKMAN, ELDON T | 3799 | §102§103 | Final Rejection | — | Pending | Aug 19, 2025 |
| 18997608 | SUBSTATION WITH POWER VOLTAGE TRANSFORMER CONNECTED THROUGH CIRCUIT DEVICE TO HIGH OR EXTRA HIGH VOLTAGE TRANSMISSION LINE | AL-TAWEEL, MUAAMAR QAHTAN | 2838 | §103 | Final Rejection | — | Pending | Jan 22, 2025 |
| 19010337 | CERAMIC MATERIAL, POWDER, AND LAYER SYSTEM COMPRISING THE CERAMIC MATERIAL | FLORES JR, DONALD M | 1781 | §112 | Final Rejection | — | Pending | Jan 06, 2025 |
| 18874104 | LOW POWER INSTRUMENT TRANSFORMER (LPIT) IN CONICAL CONNECTOR | ALEJNIKOV JR, ROBERT P | 2857 | §102§103 | Non-Final OA | — | Pending | Dec 12, 2024 |
| 18862634 | ELECTROLYSIS PLANT AND PLANT NETWORK COMPRISING AN ELECTROLYSIS PLANT AND A RENEWABLE ENERGY PLANT | DE LEON DOMENECH, RAFAEL O | 2838 | §102 | Non-Final OA | — | Pending | Nov 04, 2024 |
| 18862630 | ELECTROLYSIS PLANT AND PLANT NETWORK COMPRISING AN ELECTROLYSIS PLANT AND A RENEWABLE ENERGY PLANT | DEBERADINIS, ROBERT L | 2836 | §103 | Final Rejection | — | Pending | Nov 04, 2024 |
| 18854664 | METHOD FOR MONITORING THE STATE OF HEAT EXCHANGER PIPELINES OF A WASTE HEAT STEAM GENERATOR, AND WASTE HEAT STEAM GENERATOR | ROBERTS, HERBERT K | 2855 | §103 | Non-Final OA | — | Pending | Oct 07, 2024 |
| 18854525 | CONTINUOUS FLOW ENGINE MAINTENANCE SCHEDULING AND PROGNOSIS SYSTEM | SHEIKH, ASFAND M | 3626 | §101§102§103 | Final Rejection | 2d overdue | Pending | Oct 05, 2024 |
| 18851710 | GAS TURBINE ENGINE WITH TURBINE VANE CARRIER COOLING FLOW PATH | PRUITT, JUSTIN A | 3745 | §102§103§112 | Final Rejection | 19d | Pending | Sep 27, 2024 |
| 18838638 | ASSEMBLY FOR ALIGNING | CHOI, WILLIAM SOON | 3679 | §102§112 | Non-Final OA | — | Pending | Aug 15, 2024 |
| 18833424 | ELECTRODE FIBRE, ELECTRODE, ELECTROLYSIS CELL AND PROCESS FOR PRODUCING THE ELECTRODE FIBRE AND THE ELECTRODE | WILKINS III, HARRY D | 1794 | §103§112 | Non-Final OA | 40d | Pending | Jul 26, 2024 |
| 18729575 | 3D SCREEN PRINTING PRINTER AND 3D SCREEN PRINTING METHOD | ZIMMERMAN, JOSHUA D | 2853 | §103 | Non-Final OA | — | Pending | Jul 17, 2024 |
| 18729193 | System having a gas seal and method for operating the system | WALTON, CHESIREE A | 3624 | §102§103§112 | Non-Final OA | — | Pending | Jul 16, 2024 |
| 18720648 | SELF-CALIBRATION METHOD AND SELF-CALIBRATION OF MEASURING DEVICES | NGUYEN, TAN D | 3629 | §112 | Non-Final OA | — | Pending | Jun 16, 2024 |
| 18716266 | PARTIAL LOAD SHEDDING FOR ACHIEVING FULL REGENERATIVE SUPPLY OF ELCTRIC LOADS | OLSHANNIKOV, ALEKSEY | 2118 | §103 | Final Rejection | — | Pending | Jun 04, 2024 |
| 18699345 | RADIAL COMPRESSOR | WOLCOTT, BRIAN P | 3711 | §103 | Non-Final OA | 180d overdue | Pending | Apr 08, 2024 |
| 18681101 | ELECTROLYTIC CELL FOR POLYMER ELECTROLYTE MEMBRANE ELECTROLYSIS AND METHOD FOR THE PRODUCTION THEREOF | JEBUTU, MOFOLUWASO SIMILOLUWA | 1795 | §102§103§112 | Non-Final OA | — | Pending | Feb 05, 2024 |
| 18292363 | TREATMENT OF HYDROGEN- AND OXYGEN-CONTAINING RESIDUAL GASES OF FUEL CELLS | MCNEIL, JENNIFER C | 1723 | §103§112 | Non-Final OA | — | Pending | Jan 26, 2024 |
| 18572897 | ELECTROLYTIC CELL FOR POLYMER ELECTROLYTE MEMBRANE ELECTROLYSIS AND METHOD FOR PRODUCTION THEREOF | WONG, EDNA | 1795 | §103§112 | Non-Final OA | — | Pending | Dec 21, 2023 |
| 18564195 | GAS DIFFUSION LAYER FOR AN ELECTROCHEMICAL CELL AND ELECTROCHEMICAL CELL | RUFO, LOUIS J | 1795 | §102§103§112 | Final Rejection | — | Pending | Nov 27, 2023 |
| 18559044 | ALLOY, POWDER, METHOD AND COMPONENT | STILES, JACOB BENJAMIN | 1733 | §103 | Final Rejection | — | Pending | Nov 04, 2023 |
| 18383069 | EROSION-RESISTANT CERAMIC MATERIAL, POWDER, SLIP AND COMPONENT | ABU ALI, SHUANGYI | 1731 | §103 | Final Rejection | 26d | Pending | Oct 24, 2023 |
| 18556898 | HYDROPOWER-ELECTROLYSIS SYSTEM | ORTEGA, JOSEPH | 2834 | §102§103 | Final Rejection | — | Pending | Oct 24, 2023 |
| 18555269 | Electrolysis device | CONTRERAS, CIEL P | 1794 | §102§103§112DP | Non-Final OA | — | Pending | Oct 13, 2023 |
| 18550711 | ELECTROLYSIS SYSTEM AND METHOD | WILKINS III, HARRY D | 1794 | §102§103§112 | Non-Final OA | — | Pending | Sep 15, 2023 |
| 18274998 | CONTINUOUS FLOW ENGINE SKID COMPONENT SYSTEM | FIGG, TRAVIS M | 1783 | §102§103§112 | Final Rejection | 26d overdue | Pending | Jul 29, 2023 |
| 18269552 | SUPPORT STRATEGY FOR THIN-WALLED ADDITIVE STRUCTURE | HEVEY, JOHN A | 1735 | §102§103§112 | Non-Final OA | 60d | Pending | Jun 24, 2023 |
| 18266980 | IRRADIATION STRATEGY IN ADDITIVE MANUFACTURING WITH PULSED IRRADIATION | WUNDERLICH, ERWIN J | 3761 | §101§103§112 | Final Rejection | — | Pending | Jun 13, 2023 |
| 18266595 | ADDITIVELY MANUFACTURED POROUS COMPONENT STRUCTURE AND MEANS FOR MANUFACTURING SAME | JANSSEN, REBECCA | 1733 | §103 | Non-Final OA | 26d overdue | Pending | Jun 12, 2023 |
| 18039053 | METHOD FOR DETECTING DEFECTS IN A 3D PRINTER USING IMAGE SPATIAL RESOLUTION | LEE, HWA S | 2877 | §103 | Non-Final OA | — | Pending | May 26, 2023 |
| 18032996 | METHOD AND APPARATUS FOR DETERMINING LOW-CYCLE FATIGUE OF MECHANICAL COMPONENT, AND STORAGE MEDIUM | KIM, EUNHEE | 2188 | §103§112 | Non-Final OA | — | Pending | Apr 20, 2023 |
| 17923589 | METHOD FOR ADDITIVE MANUFACTURING BY MEANS OF DUAL SELECTIVE IRRADIATION OF A POWDER BED AND PREHEATING | CARPENTER, JOSHUA S | 1733 | §103 | Final Rejection | 24d overdue | Pending | Nov 06, 2022 |
| 17640683 | NICKEL-BASED ALLOY FOR ADDITIVE MANUFACTURING, METHOD AND PRODUCT | SMITH, CATHERINE P | 1735 | §103 | Non-Final OA | 42d overdue | Pending | Jul 17, 2022 |
| 17787127 | SCANNING STRATEGY FOR VOLUME SUPPORT IN ADDITIVE MANUFACTURING | MILLS JR., JOE E | 3761 | §102§103 | Non-Final OA | 54d | Pending | Jun 17, 2022 |
| 18718993 | WATER TREATMENT SYSTEM AND METHOD INCLUDING A DRAFT TUBE SYSTEM AND EDUCTOR | GONZALEZ, MADELINE | 1773 | §102§103 | Non-Final OA | — | Pending | Jun 12, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialSiemens Energy AG has 36 pending office actions as of October 2026, spread across 27 art units and 35 examiners.
Harry D Wilkins III has the most, with 2 of Siemens Energy AG's pending office actions.
Mostly Chemistry & Materials (USPTO Tech Center 1700), based on where its pending office actions are examined.