Technology areas: Computing & Software • Semiconductors, Circuits & Optics • Transportation, E-Commerce & Mechanical Systems
9 pending office actions • 1 client • 9 examiners • 7 art units • 0 of 9 (0%) have an AI response strategy ready • 40 patents granted in the last 365 days
Eversheds Sutherland GE focuses on Semiconductors, Circuits & Optics and records 11044 career applications. Its profile includes 9 pending office actions, showing active work in this technology area within a broad application history.
The resolved allowance rate is 90.47%, and the average office actions per allowance is 3.62. The reported rate indicates favorable resolved outcomes, while the action average shows that allowance commonly follows repeated examination interaction.
For applicants, the profile supports evaluating technical prosecution experience together with workload and outcome measures. Semiconductor, circuit, and optics claims may require precise treatment of architecture and component relationships. The available data supports planning for continued prosecution effort but does not explain individual case results.
Based on the USPTO statutory response window for each pending office action. 2 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 2 (22%) |
| §103 only | 3 (33%) |
| §102 only | 1 (11%) |
| Multi-statute (no §101) | 3 (33%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| JOHNSON, WILLIAM DONALD | 1 | 100.0% | +0.0% |
| JAGER, RYAN C | 1 | 89.6% | +3.0% |
| LEE, JYE-JUNE | 1 | 84.9% | +3.6% |
| JACKSON, LAKAISHA | 1 | 85.3% | +12.1% |
| MORRIS, TAYLOR L | 1 | 59.8% | +34.8% |
| SNYDER, ALAN W | 1 | 82.2% | +12.3% |
| PAUL, ANTONY M | 1 | 89.8% | +9.5% |
| SCHALLHORN, TYLER J | 1 | 35.8% | +15.0% |
| SAUNCY, TONI DIAN | 1 | 86.2% | +18.4% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18878356 | ELECTRICAL ASSEMBLY COMPRISING A VOLTAGE SOURCE CONVERTER AND AN ENERGY STORAGE SYSTEM | JAGER, RYAN C | — |
| 18439233 | OUT OF CENTER COOLING BORE DRILLING FOR GAS TURBINE ROTOR | SNYDER, ALAN W | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18188237 | SYSTEMS AND METHODS FOR DETERMINING A DISTANCE TO A FAULT IN HYBRID LINE SYSTEMS | SAUNCY, TONI DIAN | 25d overdue |
| 19056008 | FLAT COMPRESSION SEALING GASKET AND SEALING SYSTEM COMPRISING SAME | JOHNSON, WILLIAM DONALD | — |
| 18923194 | OFFSHORE CONVERTER PLATFORMS IN POWER TRANSMISSION NETWORKS | LEE, JYE-JUNE | — |
| 18820766 | APPARATUS FOR CONTROLLING A POWER CONVERTER IN A POWER TRANSMISSION NETWORK | JACKSON, LAKAISHA | — |
| 18433093 | ENHANCED ELECTRIC POWER CONVERTER DYNAMIC SWING EQUATION PARAMETER MODIFICATION FOR RATE-OF-CHANGE-OF-FREQUENCY RIDE THROUGH | PAUL, ANTONY M | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18188237 | SYSTEMS AND METHODS FOR DETERMINING A DISTANCE TO A FAULT IN HYBRID LINE SYSTEMS | SAUNCY, TONI DIAN | 25d overdue |
| 18772575 | INNER COMPRESSOR CASE SUSPENSION DEVICE AND METHOD OF ALIGNMENT | MORRIS, TAYLOR L | 20d |
| 18820766 | APPARATUS FOR CONTROLLING A POWER CONVERTER IN A POWER TRANSMISSION NETWORK | JACKSON, LAKAISHA | — |
| 18439233 | OUT OF CENTER COOLING BORE DRILLING FOR GAS TURBINE ROTOR | SNYDER, ALAN W | — |
| 18315887 | SYSTEMS AND METHODS FOR PERFORMING MACHINE LEARNING AND DATA ANALYTICS IN HYBRID SYSTEMS | SCHALLHORN, TYLER J | — |
| Client (Assignee) | Pending OAs |
|---|---|
| GE | 9 |
| Art Unit | Apps |
|---|---|
| 3631 | 2 |
| 2838 | 2 |
| 2434 | 1 |
| 3722 | 1 |
| 2116 | 1 |
| 2144 | 1 |
| 2857 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19056008 | FLAT COMPRESSION SEALING GASKET AND SEALING SYSTEM COMPRISING SAME | GE Infrastructure Technology LLC | JOHNSON, WILLIAM DONALD | 3631 | §102§103§112 | Non-Final OA | — | Pending | Feb 18, 2025 |
| 18878356 | ELECTRICAL ASSEMBLY COMPRISING A VOLTAGE SOURCE CONVERTER AND AN ENERGY STORAGE SYSTEM | GE Infrastructure Technology LLC | JAGER, RYAN C | 2434 | §102 | Non-Final OA | — | Pending | Dec 23, 2024 |
| 18923194 | OFFSHORE CONVERTER PLATFORMS IN POWER TRANSMISSION NETWORKS | GE Infrastructure Technology LLC | LEE, JYE-JUNE | 2838 | §103§112 | Final Rejection | — | Pending | Oct 22, 2024 |
| 18820766 | APPARATUS FOR CONTROLLING A POWER CONVERTER IN A POWER TRANSMISSION NETWORK | GE Infrastructure Technology LLC | JACKSON, LAKAISHA | 2838 | §103§112 | Final Rejection | — | Pending | Aug 30, 2024 |
| 18772575 | INNER COMPRESSOR CASE SUSPENSION DEVICE AND METHOD OF ALIGNMENT | GE Infrastructure Technology LLC | MORRIS, TAYLOR L | 3631 | §103 | Non-Final OA | 20d | Pending | Jul 15, 2024 |
| 18439233 | OUT OF CENTER COOLING BORE DRILLING FOR GAS TURBINE ROTOR | GE Infrastructure Technology LLC | SNYDER, ALAN W | 3722 | §103 | Non-Final OA | — | Pending | Feb 12, 2024 |
| 18433093 | ENHANCED ELECTRIC POWER CONVERTER DYNAMIC SWING EQUATION PARAMETER MODIFICATION FOR RATE-OF-CHANGE-OF-FREQUENCY RIDE THROUGH | GE Infrastructure Technology LLC | PAUL, ANTONY M | 2116 | §101§112 | Non-Final OA | — | Pending | Feb 05, 2024 |
| 18315887 | SYSTEMS AND METHODS FOR PERFORMING MACHINE LEARNING AND DATA ANALYTICS IN HYBRID SYSTEMS | General Electric Technology GmbH | SCHALLHORN, TYLER J | 2144 | §103 | Final Rejection | — | Pending | May 11, 2023 |
| 18188237 | SYSTEMS AND METHODS FOR DETERMINING A DISTANCE TO A FAULT IN HYBRID LINE SYSTEMS | General Electric Technology GmbH | SAUNCY, TONI DIAN | 2857 | §101§103 | Final Rejection | 25d overdue | Pending | Mar 22, 2023 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial90.5% of resolved applications prosecuted by Eversheds Sutherland GE were allowed, across 11,044 applications in USPTO records.
3.62 office actions per allowed application on average.
9 pending office actions as of October 2026, for 1 client, before 9 examiners in 7 art units.