13 pending office actions • 10 clients • 13 examiners • 9 art units • 0 of 13 (0%) have an AI response strategy ready • 39 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 5 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 5 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 1 (8%) |
| §101 + other | 2 (15%) |
| §103 only | 2 (15%) |
| §102 only | 3 (23%) |
| Multi-statute (no §101) | 5 (38%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| AHMAD, FARIA F | 1 | 76.7% | +8.2% |
| KRUG, RANDELL J | 1 | 76.5% | +17.5% |
| OH, HARRY Y | 1 | 85.1% | +17.0% |
| BOSWELL, CHRISTOPHER J | 1 | 67.4% | +26.0% |
| TRAVERS, MATTHEW P | 1 | 63.2% | +43.6% |
| O'MALLEY, CONOR AIDAN | 1 | 70.3% | -9.6% |
| WEAVER, ADAM MICHAEL | 1 | 86.7% | +33.3% |
| QURESHI, REHMAN AHMED | 1 | 100.0% | +0.0% |
| ALUNKAL, THOMAS D | 1 | 72.2% | +15.5% |
| PEO, JONATHAN M | 1 | 48.2% | +48.1% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18605898 | Animal Waste Collection Apparatus | QURESHI, REHMAN AHMED | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19055193 | Method and Manufacturing Installation for Producing a Plurality of Workpieces | TRAVERS, MATTHEW P | 44d overdue |
| 17544853 | MEASURING AND STRENGTHENING PHYSIOLOGICAL/NEUROPHYSIOLOGICAL STATES PREDICTIVE OF SUPERIOR PERFORMANCE | FERNSTROM, KURT | 28d overdue |
| 18213784 | GRATED RAKE | TC 3600, DOCKET | 13d |
| 18648680 | Method and System for Verification of Persons in Portrait Paintings | O'MALLEY, CONOR AIDAN | 63d |
| 19218745 | Safety Device for Safeguarding a Danger Zone of an Automated Machine, in Particular a Robot | OH, HARRY Y | — |
| 18607454 | ARTIFICIAL INTELLIGENCE AGRICULTURAL ADVISOR CHATBOT | WEAVER, ADAM MICHAEL | — |
| 18481675 | SYSTEM FOR INCREASING AND DISPLAYING EFFECTIVENESS AND EFFICIENCY OF STORMWATER INFRASTRUCTURE | PEO, JONATHAN M | — |
| 18184195 | BIODEGRADABLE WRAPPING FOR CARTRIDGES | DEZENDORF, MORGAN FAITH | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19055193 | Method and Manufacturing Installation for Producing a Plurality of Workpieces | TRAVERS, MATTHEW P | 44d overdue |
| 19237938 | Throttle Grip Device | KRUG, RANDELL J | 30d overdue |
| 19218745 | Safety Device for Safeguarding a Danger Zone of an Automated Machine, in Particular a Robot | OH, HARRY Y | — |
| 19193115 | Door Latch System | BOSWELL, CHRISTOPHER J | — |
| 18607454 | ARTIFICIAL INTELLIGENCE AGRICULTURAL ADVISOR CHATBOT | WEAVER, ADAM MICHAEL | — |
| 18496915 | Safety Gate Monitoring Module | ALUNKAL, THOMAS D | — |
| 18481675 | SYSTEM FOR INCREASING AND DISPLAYING EFFECTIVENESS AND EFFICIENCY OF STORMWATER INFRASTRUCTURE | PEO, JONATHAN M | — |
| Client (Assignee) | Pending OAs |
|---|---|
| Willo Products Company, LLC | 2 |
| Pilz GmbH & Co. KG | 2 |
| The Great States Corporation | 2 |
| Asahi Denso | 1 |
| Carl Zeiss | 1 |
| Fraunhofer | 1 |
| Farmer'S Business Network, Inc. | 1 |
| P4 Infrastructure, Inc. | 1 |
| Freelander Innovations USA | 1 |
| Optios, Inc. | 1 |
| Art Unit | Apps |
|---|---|
| 3726 | 2 |
| 3675 | 1 |
| 3618 | 1 |
| 2675 | 1 |
| 2658 | 1 |
| 1779 | 1 |
| 3600 | 1 |
| 1755 | 1 |
| 3715 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19294639 | Tamper-Resistant Locking System and Method | Willo Products Company, LLC | AHMAD, FARIA F | 3675 | §102 | Non-Final OA | — | Pending | Aug 08, 2025 |
| 19237938 | Throttle Grip Device | Asahi Denso Co., Ltd. | KRUG, RANDELL J | 3618 | §103 | Final Rejection | 30d overdue | Pending | Jun 13, 2025 |
| 19218745 | Safety Device for Safeguarding a Danger Zone of an Automated Machine, in Particular a Robot | Pilz GmbH & Co. Kg | OH, HARRY Y | §102§103§112 | Non-Final OA | — | Pending | May 27, 2025 | |
| 19193115 | Door Latch System | Willo Products Company, LLC | BOSWELL, CHRISTOPHER J | §102 | Non-Final OA | — | Pending | Apr 29, 2025 | |
| 19055193 | Method and Manufacturing Installation for Producing a Plurality of Workpieces | Carl Zeiss Digital Innovation GmbH | TRAVERS, MATTHEW P | 3726 | §102§103§112 | Final Rejection | 44d overdue | Pending | Feb 17, 2025 |
| 18648680 | Method and System for Verification of Persons in Portrait Paintings | Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. | O'MALLEY, CONOR AIDAN | 2675 | §101§102§103§112 | Non-Final OA | 63d | Pending | Apr 29, 2024 |
| 18607454 | ARTIFICIAL INTELLIGENCE AGRICULTURAL ADVISOR CHATBOT | Farmer'S Business Network, Inc. | WEAVER, ADAM MICHAEL | 2658 | §101§103 | Final Rejection | — | Pending | Mar 16, 2024 |
| 18605898 | Animal Waste Collection Apparatus | The Great States Corporation | QURESHI, REHMAN AHMED | §103 | Non-Final OA | — | Pending | Mar 15, 2024 | |
| 18496915 | Safety Gate Monitoring Module | Pilz GmbH & Co. Kg | ALUNKAL, THOMAS D | 3726 | §102 | Non-Final OA | — | Pending | Oct 29, 2023 |
| 18481675 | SYSTEM FOR INCREASING AND DISPLAYING EFFECTIVENESS AND EFFICIENCY OF STORMWATER INFRASTRUCTURE | P4 Infrastructure, Inc. | PEO, JONATHAN M | 1779 | §101 | Non-Final OA | — | Pending | Oct 05, 2023 |
| 18213784 | GRATED RAKE | The Great States Corporation | TC 3600, DOCKET | 3600 | §102§103 | Final Rejection | 13d | Pending | Jun 23, 2023 |
| 18184195 | BIODEGRADABLE WRAPPING FOR CARTRIDGES | Freelander Innovations Usa, LLC | DEZENDORF, MORGAN FAITH | 1755 | §102§103 | Non-Final OA | — | Pending | Mar 15, 2023 |
| 17544853 | MEASURING AND STRENGTHENING PHYSIOLOGICAL/NEUROPHYSIOLOGICAL STATES PREDICTIVE OF SUPERIOR PERFORMANCE | Optios, Inc. | FERNSTROM, KURT | 3715 | §103§112 | Non-Final OA | 28d overdue | Pending | Dec 07, 2021 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial